This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 440.44(4)(e)4.c.c. Operation of the bag leak detection system including quality assurance procedures.
NR 440.44(4)(e)4.d.d. How the bag leak detection system will be maintained including a routine maintenance schedule and spare parts inventory list.
NR 440.44(4)(e)4.e.e. How the bag leak detection system output will be recorded and stored.
NR 440.44(4)(e)5.5. The initial adjustment of the system shall, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time, if applicable.
NR 440.44(4)(e)6.6. Following initial adjustment, the owner or operator may not adjust the averaging period, alarm set point, or alarm delay time without approval from the department except as provided for in subd. 6. a. and b.
NR 440.44(4)(e)6.a.a. Once per quarter, the owner or operator may adjust the sensitivity of the bag leak detection system to account for seasonal effects including temperature and humidity according to the procedures identified in the site-specific monitoring plan required under subd. 4.
NR 440.44(4)(e)6.b.b. If opacities greater than zero percent are observed over 4 consecutive 15-second observations during the daily opacity observations required under par. (c) and the alarm on the bag leak detection system does not sound, the owner or operator shall lower the alarm set point on the bag leak detection system to a point where the alarm would have sounded during the period when the opacity observations were made.
NR 440.44(4)(e)7.7. For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, the bag leak detection sensor shall be installed downstream of the baghouse and upstream of any wet scrubber.
NR 440.44(4)(e)8.8. Where multiple detectors are required, the system’s instrumentation and alarm may be shared among detectors.
NR 440.44(4)(f)(f) For each bag leak detection system installed according to par. (e), the owner or operator shall initiate procedures to determine the cause of all alarms within one hour of an alarm. Except as provided for in par. (g), the cause of the alarm shall be alleviated within 3 hours of the time the alarm occurred by taking whatever corrective actions are necessary. Corrective actions may include the following:
NR 440.44(4)(f)1.1. Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may cause an increase in particulate emissions.
NR 440.44(4)(f)2.2. Sealing off defective bags or filter media.
NR 440.44(4)(f)3.3. Replacing defective bags or filter media or otherwise repairing the control device.
NR 440.44(4)(f)4.4. Sealing off a defective baghouse compartment.
NR 440.44(4)(f)5.5. Cleaning the bag leak detection system probe or otherwise repairing the bag leak detection system.
NR 440.44(4)(f)6.6. Shutting down the process producing the particulate emissions.
NR 440.44(4)(g)(g) In approving the site-specific monitoring plan required in par. (e) 4., the department may allow owners or operators more than 3 hours to alleviate specific conditions that cause an alarm if the owner or operator identifies the condition that could lead to an alarm in the monitoring plan, adequately explains why it is not feasible to alleviate the condition within 3 hours of the time the alarm occurred, and demonstrates that the requested additional time will ensure alleviation of the condition as expeditiously as practicable.
NR 440.44(5)(5)Monitoring of operations.
NR 440.44(5)(a)(a) The owner or operator subject to the provisions of this section shall maintain records daily of the following information:
NR 440.44(5)(a)1.1. Time and duration of each charge;
NR 440.44(5)(a)2.2. Time and duration of each tap;
NR 440.44(5)(a)3.3. All flow rate data obtained under par. (b), or equivalent obtained under 40 CFR 60.274 (d); and
NR 440.44(5)(a)4.4. All pressure data obtained under par. (f).
NR 440.44(5)(b)(b) Except as provided under 40 CFR 60.274 (d), the owner or operator subject to the provisions of this section shall check and record on a once-per-shift basis the furnace static pressure (if a DEC system is in use, and a furnace static pressure gauge is installed according to par. (f)) and either: check and record the control system fan motor amperes and damper positions on a once-per-shift basis; install, calibrate and maintain a monitoring device that continuously records the volumetric flow rate through each separately ducted hood; or install, calibrate and maintain a monitoring device that continuously records the volumetric flow rate at the control device inlet and check and record damper positions on a once-per-shift basis. The monitoring devices may be installed in any appropriate location in the exhaust duct such that reproducible flow rate monitoring will result. Flow rate monitoring devices shall have an accuracy of + 10% over their normal operating range and shall be calibrated according to the manufacturer’s instructions. The department may require the owner or operator to demonstrate the accuracy of the monitoring devices relative to Methods 1 and 2 of 40 CFR part 60, Appendix A, incorporated by reference in s. NR 440.17 (1).
NR 440.44(5)(c)(c) When the owner or operator of an affected facility is required to demonstrate compliance with the standard under sub. (3) (a) 3., and at any other time, the department may require that either: the control system fan motor amperes and all damper positions, the volumetric flow rate through each separately ducted hood, or the volumetric flow rate at the control device inlet and all damper positions shall be determined during all periods in which the hood is operated for the purpose of capturing emissions from the affected facility subject to par. (b). The owner or operator may petition the department for reestablishment of these parameters whenever the owner or operator can demonstrate to the department’s satisfaction that the EAF operating conditions upon which the parameters were previously established are no longer applicable. The values of these parameters as determined during the most recent demonstration of compliance shall be maintained at the appropriate level for each applicable period. Operation at other than baseline values may be subject to the requirements of sub. (7) (a).
NR 440.44 NoteNote: Under 40 CFR 60.274 (d), the owner or operator may petition the administrator to approve any alternative method that will provide a continuous record of operation of each emission capture system.
NR 440.44(5)(e)(e) The owner or operator shall perform monthly operational status inspections of the equipment that is important to the performance of the total capture system (i.e., pressure sensors, dampers and damper switches). This inspection shall include observations of the physical appearance of the equipment (e.g., presence of hole in ductwork or hoods, flow constrictions caused by dents or accumulated dust in ductwork, and fan erosion). Any deficiencies shall be noted and proper maintenance performed.
NR 440.44(5)(f)(f) Except as provided for under sub. (4) (d), where emissions during any phase of the heat time are controlled by use of a DEC system, the owner or operator shall install, calibrate and maintain a monitoring device that continuously records the pressure in the free space inside the EAF. The pressure shall be recorded as 15-minute integrated averages. The monitoring device may be installed in any appropriate location in the EAF or DEC system duct prior to the introduction of ambient air such that reproducible results will be obtained. The pressure monitoring device shall have an accuracy of ± 5 mm of water gauge over its normal operating range and shall be calibrated according to the manufacturer’s instructions.
NR 440.44(5)(g)(g) Except as provided for under sub. (4) (d), when the owner or operator of an EAF is required to demonstrate compliance with the standard under sub. (3) (a) 3. and at any other time the department may require, the pressure in the free space inside the furnace shall be determined during the meltdown and refining periods using the monitoring device under par. (f). The owner or operator may petition the department for reestablishment of the 15-minute integrated average pressure whenever the owner or operator can demonstrate to the department’s satisfaction that the EAF operating conditions upon which the pressures were previously established are no longer applicable. The pressure determined during the most recent demonstration of compliance shall be maintained at all times the EAF is operating in a meltdown and refining period. Operation at higher pressures may be considered by the department to be unacceptable operation and maintenance of the affected facility.
NR 440.44(5)(h)(h) Where the capture system is designed and operated such that all emissions are captured and ducted to a control device, the owner or operator will not be subject to the requirements of this subsection.
NR 440.44(5)(i)(i) During any performance test required under s. NR 440.08 and for any report thereof required under sub. (7) (c) or to determine compliance with sub. (3) (a) 3., the owner or operator shall monitor the following information for all heats covered by the test:
NR 440.44(5)(i)1.1. Charge weights and materials, and tap weights and materials;
NR 440.44(5)(i)2.2. Heat times, including start and stop times, and a log of process operation, including periods of no operation during testing and the pressure inside the furnace where direct-shell evacuation systems are used;
NR 440.44(5)(i)3.3. Control device operation log; and
NR 440.44(5)(i)4.4. Continuous monitor data or Method 9 of 40 CFR part 60, Appendix A, incorporated by reference in s. NR 440.17, data.
NR 440.44(6)(6)Test methods and procedures.
NR 440.44(6)(a)(a) During performance tests required in s. NR 440.08, the owner or operator may not add gaseous diluent to the effluent gas after the fabric in any pressurized fabric collector, unless the amount of dilution is separately determined and considered in the determination of emissions.
NR 440.44(6)(b)(b) When emissions from any EAF are combined with emissions from facilities not subject to the provisions of this section but controlled by a common capture system and control device, the owner or operator shall use either or both of the following procedures during a performance test:
NR 440.44 NoteNote: See also sub. (7) (b).
NR 440.44(6)(b)1.1. Determine compliance using the combined emissions.
NR 440.44(6)(b)2.2. Use a method that is acceptable to the department and that compensates for the emissions from the facilities not subject to the provisions of this section.
NR 440.44(6)(c)(c) When emissions from any EAF are combined with emissions from facilities not subject to the provisions of this section, the owner or operator shall use either or both of the following procedures to demonstrate compliance with sub. (3) (a) 3.:
NR 440.44(6)(c)1.1. Determine compliance using the combined emissions.
NR 440.44(6)(c)2.2. Shut down operation of facilities not subject to the provisions of this section during the performance test.
NR 440.44(6)(d)(d) In conducting the performance tests required in s. NR 440.08, the owner or operator shall use as reference methods and procedures the test methods in Appendix A of 40 CFR part 60, incorporated by reference in s. NR 440.17, or other methods and procedures as specified in this subsection, except as provided in s. NR 440.08 (2).
NR 440.44(6)(e)(e) The owner or operator shall determine compliance with the particulate matter standards in sub. (3) as follows:
NR 440.44(6)(e)1.1. Method 5 shall be used for negative-pressure fabric filters and other types of control devices and Method 5D shall be used for positive-pressure fabric filters to determine the particulate matter concentration and, if applicable, the volumetric flow rate of the effluent gas. The sampling time and sample volume for each run shall be at least 4 hours and 4.5 dscm (160 dscf) and, when a single EAF is sampled, the sampling time shall include an integral number of heats.
NR 440.44(6)(e)2.2. When more than one control device serves the EAF being tested, the concentration of particulate matter shall be determined using the following equation:
where:
cst is the average concentration of particulate matter, mg/dscm (gr/dscf)
csi is the concentration of particulate matter from control device “i”, mg/dscm (gr/dscf)
n is the total number of control devices tested
Qsdi is the volumetric flow rate of stack gas from control device “i”, dscm/hr (dscf/hr)
NR 440.44(6)(e)3.3. Method 9 and the procedures of s. NR 440.11 shall be used to determine opacity.
NR 440.44(6)(e)4.4. To demonstrate compliance with sub. (3) (a) 1. to 3., the Method 9 test runs shall be conducted concurrently with the particulate matter test runs, unless inclement weather interferes.
NR 440.44(6)(f)(f) To comply with sub. (5) (c), (f), (g) and (i), the owner or operator shall obtain the information in these paragraphs during the particulate matter runs.
NR 440.44(6)(g)(g) Where emissions from any EAFs are combined with emissions from facilities not subject to the provisions of this section but controlled by a common capture system and control device, the owner or operator may use any of the following procedures during a performance test:
NR 440.44(6)(g)1.1. Base compliance on control of the combined emissions.
NR 440.44(6)(g)2.2. Utilize a method acceptable to the department which compensates for the emissions from the facilities not subject to the provisions of this section.
NR 440.44(6)(g)3.3. Any combination of the criteria of subds. 1. and 2.
NR 440.44(6)(h)(h) Where emissions from any EAFs are combined with emissions from facilities not subject to the provisions of this section, the owner or operator may use any of the following procedures for demonstrating compliance with sub. (3) (a) 3.:
NR 440.44(6)(h)1.1. Base compliance on control of the combined emissions.
NR 440.44(6)(h)2.2. Shut down operation of facilities not subject to the provisions of this section.
NR 440.44(6)(h)3.3. Any combination of the criteria of subds. 1. and 2.
NR 440.44(6)(i)(i) If visible emissions observations are made in lieu of using a continuous opacity monitoring system, as allowed for by sub. (4) (c), visible emissions observations shall be conducted at least once per day for at least 3 6-minute periods when the furnace is operating in the melting and refining period. All visible emissions observations shall be conducted in accordance with Method 9. If visible emissions occur from more than one point, the opacity shall be recorded for any points where visible emissions are observed. Where it is possible to determine that a number of visible emission sites relate to only one incident of the visible emissions, only one set of 3 6-minute observations shall be required. In that case the Method 9 observations shall be made for the site of highest opacity that directly relates to the cause, or location, of visible emissions observed during a single incident. Records shall be maintained of any 6-minute average that is in excess of the emission limit specified in sub. (3) (a).
NR 440.44(6)(j)(j) Unless the presence of inclement weather makes concurrent testing infeasible the owner or operator shall conduct concurrently the performance tests required under s. NR 440.08 to demonstrate compliance with sub. (3) (a) 1., 2., and 3.
NR 440.44(7)(7)Recordkeeping and reporting requirements.
NR 440.44(7)(a)(a) Operation at a furnace static pressure that exceeds the value established under sub. (5) (g) and either operation of control system fan motor amperes at values exceeding ± 15% of the value established under sub. (5) (c) or operation at flow rates lower than those established under sub. (5) (c) may be considered by the department to be unacceptable operation and maintenance of the affected facility. Operation at such values shall be reported to the department semiannually.
NR 440.44(7)(b)(b) When the owner or operator of an EAF is required to demonstrate compliance with the standard under sub. (6) (b) 2. or a combination of sub. (6) (b) 1. and 2. the owner or operator shall obtain approval from the department of the procedure that will be used to determine compliance. Notification of the procedure to be used must be postmarked at least 30 days prior to the performance test.
NR 440.44(7)(c)(c) For the purpose of this section, the owner or operator shall conduct the demonstration of compliance with sub. (3) (a) and furnish the department a written report of the results of the test. The report shall include the following information:
NR 440.44(7)(c)1.1. Facility name and address.
NR 440.44(7)(c)2.2. Plant representative.
NR 440.44(7)(c)3.3. Make and model of process, control device and continuous monitoring equipment.
NR 440.44(7)(c)4.4. Flow diagram of process and emissions capture equipment including other equipment or processes ducted to the same control device.
NR 440.44(7)(c)5.5. Rated design capacity of process equipment.
NR 440.44(7)(c)6.6. The following data required under sub. (5) (i):
NR 440.44(7)(c)6.a.a. List of charge and tap weights and materials.
NR 440.44(7)(c)6.b.b. Heat times and process log.
NR 440.44(7)(c)6.c.c. Control device operation log.
NR 440.44(7)(c)6.d.d. Continuous opacity monitor or Method 9 data.
NR 440.44(7)(c)7.7. Test dates and test times.
NR 440.44(7)(c)8.8. Test company.
NR 440.44(7)(c)9.9. Test company representative.
NR 440.44(7)(c)10.10. Test observers from outside the department.
NR 440.44(7)(c)11.11. Description of test methodology used, including any deviation from standard reference methods.
NR 440.44(7)(c)12.12. Schematic of sampling location.
NR 440.44(7)(c)13.13. Number of sampling points.
NR 440.44(7)(c)14.14. Description of sampling equipment.
NR 440.44(7)(c)15.15. Listing of sampling equipment calibrations and procedures.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.