NR 50.09(4)(f)5.
5. Should the amount of funds approved for supplementary snowmobile trail maintenance payments under s.
350.12 (4) (bg), Stats., not be sufficient to satisfy the total audited requests received under subd. 1., the funds shall be distributed on a proportional basis.
NR 50.09(4)(g)1.1. Snowmobile trail segments eligible for rehabilitation assistance shall be a minimum of 3 miles in length and shall have been a part of the funded trail system of the county for a minimum of 10 years from the date of application for trail rehabilitation except where a natural event or other circumstances beyond the control of the county adversely affected trail safety prior to this 10 year period.
NR 50.09(4)(g)2.
2. Snowmobile trail segments that have been improved through the use of rehabilitation funds are not eligible for additional rehabilitation funds for a period of 10 years except where a natural event adversely affects trail safety during this period.
NR 50.09(4)(g)3.
3. A county is not eligible for rehabilitation funds for snowmobile trail segments that total more than 10 percent of the total mileage of the county funded for maintenance.
NR 50.09(5)(a)(a) Reimbursement of costs of county acquisition of rights-of-way or fee title may be up to 100 percent of eligible acquisition expenses.
NR 50.09(5)(b)1.1. Reimbursement of costs of county development of snowmobile trails shall be up to 100 percent of approved eligible project costs. Counties may request an advance payment of up to 75 percent of the signed contract amount for development.
NR 50.09(5)(b)2.
2. Development work cannot be started or project costs incurred until an agreement has been approved by the department and the sponsor.
NR 50.09(5)(bn)1.1. Eligible costs for snowmobile bridge development and rehabilitation projects include the following: construction and replacement of entire structure including approaches and abutments, construction and repair to the superstructure of the bridge, construction and replacement of the entire deck and railings and construction and repair or construction and replacement of protective riprap around abutments or footings.
NR 50.09(5)(bn)2.
2. Costs which are not eligible for development and rehabilitation cost sharing are: construction and replacement of bridge railings only, and patching of decking, grading or minor repair to approaches, construction and bridge repairs to bring bridge structure within any existing codes, construction and reinforcement of bridge structures to accommodate weights in excess of 14,000 pounds and deck construction and replacement for the primary purpose of accommodating larger grooming equipment.
NR 50.09(5)(bn)3.
3. Cost sharing for the purchase and installation of prefabricated bridges shall be limited to structures with a maximum design load of 14,000 pounds.
NR 50.09(5)(bn)4.
4. Cost sharing for the purchase of materials and construction of bridges built on site by either contractors or clubs shall be limited to a maximum design load of 14,000 pounds unless there are circumstances that lead to a capacity greater than 14,000 pounds for no demonstrated increase in cost.
NR 50.09(5)(bn)5.
5. Reimbursement of costs of bridge rehabilitation projects shall be up to 100 percent of approved eligible project costs. Counties may request an advance payment of up to 75 percent of the signed contract amount for bridge rehabilitation.
NR 50.09(5)(bp)1.1. Eligible costs for snowmobile trail rehabilitation projects include: clearing of trees from storm damage to re-establish the trail corridor, filling and grading to re-establish the trail tread damaged as a result of erosion and widening and straightening trail segments to improve visibility.
NR 50.09(5)(bp)2.
2. The following are not considered eligible costs of trail rehabilitation: brushing, signing and similar activities conducted as part of routine maintenance, costs associated with bringing a trail up to standards listed in sub. (4) (c), construction of a new bridge or culvert with an inside diameter of greater than 24 inches or rehabilitation or replacement of a bridge or culvert with an inside diameter of greater than 24 inches.
NR 50.09(5)(bp)3.
3. Snowmobile trail rehabilitation projects shall be up to 100 percent of approved eligible project costs. Counties may request an advance payment of up to 75 percent of the signed contract amount for trail rehabilitation.
NR 50.09(5)(bp)4.
4. The total cost of the snowmobile trail rehabilitation project may not exceed $500 per mile unless approved by the snowmobile recreation council.
NR 50.09(5)(c)
(c) Reimbursement of costs of county maintenance of snowmobile trails shall be up to 100 percent of approved eligible project costs of maintaining the trail up to the amount per mile per year maximum specified under s.
350.12 (4) (b) 1., Stats. Counties may request advance payments of up to 50 percent of the signed contract amount for maintenance. To be eligible for maintenance advance payments, a county shall have settled all maintenance claims from previous years.
NR 50.09(5)(d)
(d) County liability insurance payments for approved trails shall be reimbursed at 100 percent of eligible costs. Liability insurance is an eligible cost under the category of maintenance.
NR 50.09(5)(e)
(e) Aids for development of trail shelters or sanitary facilities shall not exceed $5,000. Aids for a combination building including shelter and sanitary facilities shall not exceed $10,000.
NR 50.09(5)(f)
(f) Claims shall be on a reimbursement basis except for snowmobile trail development, bridge rehabilitation, trail rehabilitation and maintenance project advances.
NR 50.09(5)(g)
(g) The project period will not exceed one year. All maintenance agreements will terminate on June 30 of each year.
NR 50.09(5)(h)
(h) Trail grooming rates, including operator, power unit and drag, shall be established by the department.
NR 50.09(5)(i)
(i) Equipment rates for other maintenance activities and trail development performed by force account, snowmobile clubs or snowmobile club associations may not exceed the county machinery agreement rate established annually by the department of transportation.
NR 50.09(5)(j)
(j) Labor rates for other maintenance activities and trail development performed by snowmobile clubs or snowmobile club associations shall be established by the department.
NR 50.09(5)(k)
(k) Labor rates for other maintenance activities and trail development by county employees or others included in a labor contract shall be as established by the contract.
NR 50.09(5)(L)
(L) Claims for payment of maintenance, acquisition, development and bridge rehabilitation projects shall be submitted within 6 months after the project termination date for the costs to be eligible for reimbursement.
NR 50.09(5)(m)
(m) Reductions in grant payments for failure to comply with the requirements of maintenance, development or bridge rehabilitation project agreements may be made on a case-by-case basis. A partial or total reduction in funds shall be preceded by specific written notification of conditions which were not met and shall include a timetable for improvement in performance. Continued failure to comply with the grant agreement within the prescribed timetable may result in a reduction of grant funds. The reduction shall be calculated based on a percentage of poor performance in relation to the total trail system specified in the grant agreement.
NR 50.09(5)(n)
(n) For counties which do not request supplemental grooming payments under sub. (4) (f), financial audit of claims shall take place as part of each county's year-end single audit. Counties not requesting supplemental grooming payments are not required to submit financial documentation with their payment request. After the single audit is completed, the department may perform additional financial audits of these claims to supplement work done in a single audit.
NR 50.09(6)
(6) Additional conditions. In addition to conditions listed in sub. (5), the general provisions of s.
NR 50.05 also apply.
NR 50.09(7)
(7) Procedure for applying for grant. Contact appropriate department regional office for prescribed application forms and instructions. Submit completed application to the regional office by April 15.
NR 50.09(8)
(8) Useful life. A table of maximum useful life for project elements is established for the purpose of record management and record disposition. The listing of the maximum useful life figures for snowmobile maintenance, acquisition, development and bridge rehabilitation projects is as follows:
-
See PDF for table NR 50.09 History
History: Cr.
Register, March, 1975, No. 231, eff. 4-1-75; am. (1) (d), (2) (a) 2. b. and c, (2) (b), (c) and (d), and (3),
Register, March, 1976, No. 243, eff. 4-1-76; r. and recr.
Register, June, 1980, No. 294, eff. 7-1-80; renum. (1) (a), (b), (c), (2) and (3) to be (4) (b), (c), (d), (5) and (7), renum. (5) (h) and (i) to be (5) (g) and (h), am. (4) (b) 5., (4) (c) 3.b., (5) (b) and (c), r. and recr. (5) (f) and (h), cr. (1), (2), (3), (4) (a), (5) (i), (j) and (k) and (6), r. (7) (b),
Register, May, 1983, No. 329, eff. 6-1-83; am. (3), (4) (c) 2. f., 3. b., (5) (c), (d) and (f), cr. (4) (e) and (f), (5) (L) to (n) and (8),
Register, November, 1989, No. 407, eff. 12-1-89; r. and recr. (4) (b) and (5) (b) 1., am. (4) (d) 2., (f) 1. intro., a., c. and d., (5) (a), (c) and (f), cr. (4) (d) 3., (e) 3., (f) 2., (g), (5) (bn) and (bp), renum. (4) (f) 2. and 3. to be (4) (f) 3. and 4. and am.,
Register, February, 1996, No. 482, eff. 3-1-96; r. and recr. (4) (c) 3. b., am. (4) (f) 1. a. to c., 2. and (7), renum. (4) (f) 3. and 4. to be (4) (f) 4. and 5. and am. (4) (f) 4., cr. (4) (f) 3.,
Register, December, 1999, No. 528, eff. 1-1-00;
CR 04-014: am. (4) (c) 3. b. and (5) (c)
Register September 2004 No. 585, eff. 10-1-04;
CR 11-050: am. (4) (b) 2., cr. (4) (bm), am. (4) (f) 1. d., (5) (bn) 1. to 4.
Register July 2012 No. 679, eff. 8-1-12;
2023 Wis. Act 110: am. (4) (f) 3. Register March 2024 No. 819, eff. 4-1-24. NR 50.10
NR 50.10
Aids to cities, villages or towns for route signs. NR 50.10(1)(1)
Purpose. The purpose of this section is to establish standards for the posting of route signs and directional arrows and for the implementation of an aids program for cities, villages or towns for the initial purchase of snowmobile route signs and for purchase of signs briefly explaining the intoxicated snowmobile law along snowmobile routes under ss.
23.09 (26) and
350.12 (4), Stats.
NR 50.10(2)
(2) Applicability. The provisions of this section are applicable to all cities, villages or towns. Aids are available to cities, villages, or towns for up to 100 percent for approved eligible project costs of initial signing of snowmobile routes which connect authorized trails or which offer entrance to or exit from trails leading to such municipalities. Aids are also available to cities, villages, or towns for up to 100 percent of the cost to purchase signs explaining the intoxicated snowmobile law along snowmobile routes.
NR 50.10(3)(a)1.1. Snowmobile route signs. Signs for use on highways and sidewalks designated for use by snowmobile operators by the governmental agency having jurisdiction or authorized by s.
350.04, Stats., are as follows:
NR 50.10(3)(a)1.a.
a. The snowmobile route (D11-6) sign shall have a reflectorized white symbol, margin and message on a reflectorized green background. The standard and minimum size of this sign is 24 inches by 18 inches. The design of the stylized snowmobile symbol and the word message “SNOWMOBILE ROUTE" shall essentially conform to the standard design on file in the division of highways, department of transportation.
NR 50.10(3)(a)1.am.
am. The combination snowmobile and all-terrain vehicle route sign (Drawing D11-8) may be used when the highway or sidewalk is designated for use by both snowmobile and all terrain vehicles. The sign shall have a reflectorized white symbol, margin and message on a reflectorized green background. The standard and minimum size for this sign is 24 inches by 8 inches. The design of the stylized snowmobile and all-terrain vehicle symbol and the word message “ROUTE" shall essentially conform to the standard design on file in the division of highways, department of transportation.
NR 50.10(3)(a)1.b.
b. A directional arrow marker (Drawing M7 series) shall have a reflectorized white arrow and margin on a reflectorized green background. The standard and minimum size of a directional arrow marker is 12 inches by 9 inches.
NR 50.10 Note
Note: Copies of sign designs may be obtained from the Wisconsin Department of Transportation, Office of Traffic Engineering, 4802 Sheboygan Avenue, Madison, WI 53705.
NR 50.10(3)(a)1.c.
c. A snowmobile route sign with appropriate directional arrow shall be placed at the beginning of a snowmobile route and at such locations and intervals as necessary to enable snowmobile operators to follow the route.
NR 50.10(3)(a)1.d.
d. All snowmobile route signing shall be done by or under the direction of and is the responsibility of the unit of government which designates the snowmobile routes. The department of transportation reserves the right to require such changes in the signing of snowmobile routes marked over the state trunk highway system as it deems necessary in the interest of efficient and safe operation of the highway.
NR 50.10(3)(a)2.
2. Reflectorization. The reflective material for all reflectorized signs shall meet the specifications of paragraph 637.2.2.1 on reflective sheeting in the state of Wisconsin department of transportation division of highways standard specifications for road and bridge construction, edition of 1981.
NR 50.10(3)(b)
(b) Intoxicated snowmobile law sign standards. Signs explaining the intoxicated snowmobile law, to be used on highways or sidewalks designated as snowmobile routes by the governmental agency having jurisdiction, shall meet all of the following standards:
NR 50.10(3)(b)1.
1. The intoxicated snowmobile law sign shall have reflectorized black letters and border on a reflectorized white background.
NR 50.10(4)(a)
(a) Snowmobile route signs and route arrows, trail crossing warning signs, intoxicated snowmobile law signs, and sign posts are eligible for aid.
NR 50.10(4)(b)
(b) Signs and posts may not be purchased until funds are approved for the project by the department.
NR 50.10(4)(c)
(c) Labor costs to install signs are not eligible for reimbursement.
NR 50.10(4)(d)
(d) Sponsors may submit a claim for payment upon placement of signs.
NR 50.10(5)
(5) Application procedure. Application forms and instructions are available from any department regional office. Completed applications shall be submitted to the appropriate regional office by April 15.
NR 50.10 History
History: Cr.
Register, March, 1975, No. 231, eff. 4-1-75; am. (3),
Register, March, 1976, No. 243, eff. 4-1-76; r. and recr.,
Register, June, 1980, No. 294, eff. 7-1-80; r. and recr. (1), renum. (2), (3) and (4) to be (3), (4) and (5), cr. (2), am. (3) (a) 2., r. (5) (b),
Register, May, 1983, No. 329, eff. 6-1-83; am. (1) and (2), cr. (3) (b), r. and recr. (4) and (5),
Register, November, 1989, No. 407, eff. 12-1-89; am. (1), (2) and (3) (a) 1. b., cr. (3) (a) 1. am.,
Register, February, 1996, No. 482, eff. 3-1-96; r. and recr. (3) (a) 2., am. (5),
Register, December, 1999, No. 528, eff. 1-1-00.
NR 50.11
NR 50.11
Aids to snowmobile clubs. NR 50.11(1)(1)
Purpose. The purpose of this section is to establish standards for the implementation of the cooperative sign program under to ss.
23.09 (26) and
350.12 (4), Stats.
NR 50.11(2)
(2) Applicability. The provisions of this section are applicable to all snowmobile clubs participating in the cooperative sign program. Free cardboard signs and reflectorized material are available to snowmobile clubs.
NR 50.11(3)(c)
(c) Signs will be limited to directional arrows, trail blazers, stop and caution signs.
NR 50.11(4)
(4) Procedures for application. Submit department application to the proper regional office by October 1. Application shall include:
NR 50.11(4)(a)
(a) Certification that the trail meets standards set out in department guidelines and that landowners on whose property the trail traverses have given their permission for trail use.
NR 50.11 History
History: Cr.
Register, March, 1975, No. 231, eff. 4-1-75; am.
Register, March, 1976, No. 243, eff. 4-1-76; r. and recr.,
Register, June, 1980, No. 294, eff. 7-1-80; r. and recr. (1), renum. (2) and (3) to be (3) and (4), cr. (2), am. (3) (a),
Register, May, 1983, No. 329, eff. 6-1-83; correction in (4) made under s. 13.93 (2m) (b) 1., Stats.,
Register, April, 1998, No. 508; am. (4) (intro.),
Register, December, 1999, No. 528, eff. 1-1-00.
NR 50.12
NR 50.12
Law enforcement aids to counties (ch. 350, Stats.). NR 50.12(1)(1)
Counties may receive up to 100 percent reimbursement of monies spent on the enforcement of ch.
350, Stats.
NR 50.12(2)
(2) Claim forms shall be filed with the bureau of law enforcement, department of natural resources, on or before June 1 of the year following the 12-month period for which the claim is made. Claims shall be made for the May 1 to April 30 period immediately preceding the filing date.
NR 50.12(3)
(3) The following forms will be used in the snowmobile enforcement aid program:
NR 50.12(3)(a)
(a) Form 8700-59 — Notice of intent to patrol. In order to be eligible for the state aids, a snowmobile patrol must function as an enforcement unit and file an intent to patrol form with the department of natural resources listing the authority under which the snowmobile patrol will operate. On or before June 1 of each year a county must file an intent to patrol form with the department, sent to the attention of the Office of the Coordinator of Snowmobile Safety, P.O. Box 7921, Madison, Wisconsin.
NR 50.12(3)(b)
(b) Form 8700-89 — Daily log. This form is to be used in compiling a summary of the snowmobile patrol's daily activities and expenses. It is not to be filed with the department, but is to be used for assembling information necessary to complete form 8700-90. This form must be kept on file by the snowmobile patrol to augment its records and must be available in chronological order for periodic checks by representatives of the department during normal business hours and at the time of the annual audit.
NR 50.12(3)(c)
(c) Form 8700-90 — Monthly report. This form is to be completed and filed with the department no later than the tenth day following the month covered. The information shown on this form will be a computation of the information taken from the daily logs (form 8700-89).
NR 50.12(3)(d)
(d) An appropriate official of the snowmobile patrol shall complete the following forms, retain
one set for the county's records, and file one set with the bureau of law enforcement on or before June 1, covering the patrol expense for the preceding 12–month period of May 1 to April 30. Claims that are received by the department after June 1 will not be processed for payment.
NR 50.12(3)(d)1.
1. `Form 8700-60 — Application for state aid.' Form 8700-60 shall be completed by the appropriate county official, who shall list the total net cost of the snowmobile patrol claimed by the county.
NR 50.12(3)(d)2.
2. `Form 8700-61 — Salary schedule.' Form 8700-61 shall be completed by the appropriate county official, who shall list the names and salaries of persons engaged in the enforcement of ch.
350, Stats. Salary rate is restricted to no more than the regular straight time rate that the officer normally receives. Allowable fringe benefit rates are actual costs up to a maximum of 50 percent of the reimbursable straight time salary rate.
NR 50.12(3)(d)3.
3. `Form 8700-62 — Travel, materials and supplies schedule.' Form 8700-62 shall be completed by the appropriate county official, who shall list all reimbursable expenditures other than salaries and depreciable items.
NR 50.12(3)(d)4.
4. `Form 8700-63 — Depreciation schedule - straight line method.' Form 8700-63 shall be completed by the appropriate county official, who shall list all capital outlay equipment and the resulting depreciation. Purchase of capital equipment shall be preapproved by the department. Depreciation shall be calculated at the rate of 20 percent annually for each new item of capital equipment for which the cost is $2,500 or greater. All costs of repairs that are $2,500 or greater to an item of capital equipment shall be reimbursed by the department on a 20 percent per year straight line depreciation schedule.
NR 50.12(3)(d)5.
5. `Form 8700-64 — Record of court cases for violations of ch. 350, Stats.' This form is to be completed by the appropriate county official, who shall list all violations and court actions for the calendar year.
NR 50.12(3)(e)
(e) In order to help achieve uniformity, accountability and cost controls, the following standards are established:
NR 50.12(3)(e)1.
1. For the purpose of patrol reimbursement, each patrol is eligible for reimbursement for only those hours for which the ratio of hours per arrest is no more than 3 times the state average of hours per arrest for participating sheriff patrols for the past 3 years computed from the statewide snowmobile sheriff patrol records. Two documented written warnings will be given the same weight as an arrest. No more than 50 percent of the credits to reach the standard may be for written warnings.