DHS 163.14(11)(e)(e) Occupant protection. Documented methodologies and all of the following work practice requirements shall be used to protect occupants when renovation activities are performed: DHS 163.14(11)(e)1.1. ‘Post signs.’ Signs clearly defining the work area and warning occupants and other persons not involved in the renovation activities to remain outside the work area. To the extent practicable, these signs shall be in the primary language of the occupants. Signs shall be posted before beginning the work and shall remain in place and readable until the renovation activities and post-work cleaning verification have been completed. DHS 163.14(11)(e)2.2. ‘Contain work areas.’ Before starting renovation activities, the work area shall be isolated so that no dust or debris leaves the work area during the activity. Workers shall maintain the integrity of the containment throughout the renovation activities by ensuring that any plastic or other appropriate containment materials are not torn or displaced, and taking steps necessary to ensure that no dust or debris leaves the containment work area during the renovation. When the building is occupied, containment shall be installed in a manner that provides safe access to restrooms and exits for occupants. Containment may not be constructed in a manner that would interfere with worker egress in an emergency. DHS 163.14(11)(f)(f) Interior lead-safe work practices. The company shall ensure that documented methodologies are used for all interior renovation activities and that all personal property in the work area is protected from contamination by dust and debris, including all of the following: DHS 163.14(11)(f)1.1. Remove all objects from the work area, including furniture, rugs, and window coverings. Pre-clean all horizontal surfaces with a HEPA vacuum to remove any existing paint dust and debris. Objects that cannot be removed shall first be cleaned using a HEPA vacuum, and then be covered with plastic sheeting or other impermeable material with all seams and edges taped or otherwise sealed. DHS 163.14(11)(f)2.2. Close and seal all duct openings in the work area with taped down plastic sheeting or other impermeable material. DHS 163.14(11)(f)3.3. Close windows and doors in the work area. Doors shall be covered with plastic sheeting or other impermeable material. Doorways used as the entrance to the work area shall be covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area. DHS 163.14(11)(f)4.4. Cover floor surfaces in the work area, including installed carpet, with taped down plastic sheeting or other impermeable material at least 6 feet beyond the perimeter of surfaces undergoing renovation, or a sufficient distance to contain all dust, whichever is greater. Floor containment measures may stop at the edge of a vertical containment system consisting of impermeable barriers that extend from the floor to the ceiling and that are completely sealed at joints with the floor, ceiling, and walls. DHS 163.14(11)(f)5.5. Use precautions to ensure that all personnel, tools, and other items, including the exteriors of containers of waste, are free of dust and debris before leaving the work area. DHS 163.14(11)(g)(g) Exterior lead-safe work practices. The company shall ensure that documented methodologies are used for all exterior renovation activities and that all personal property in the work area is protected from contamination by dust and debris, including all of the following: DHS 163.14(11)(g)1.1. Remove all objects from the work area, including furniture and play equipment, and pre-clean horizontal surfaces and the ground to remove any visible paint debris. Objects that cannot be removed shall be covered with plastic sheeting or other impermeable material with all seams and edges taped or otherwise sealed. DHS 163.14(11)(g)2.2. Close all doors and windows within 20 feet of the renovation work area. On multi-story buildings, close all doors and windows within 20 feet of the renovation work on the same floor as the renovation and all doors and windows on all floors below that are the same horizontal distance from the renovation work. DHS 163.14(11)(g)3.3. Ensure that doors within the work area that will be used while the job is being performed are covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area. DHS 163.14(11)(g)4.4. Cover the ground with heavy duty plastic sheeting extending 10 feet beyond the perimeter of surfaces undergoing paint disturbance or a sufficient distance to collect falling paint debris, whichever is greater, unless the property line or neighboring structures prevent 10 feet of ground cover. Vertical containment or other precautions in containing the work area may be necessary in order to prevent contamination of other buildings, other areas of the property, or adjacent buildings or properties. Ground containment measures may stop at the edge of the vertical barrier when using a vertical containment system. DHS 163.14(11)(h)(h) Prohibited practices. All of the following work practices shall be prohibited or restricted during a renovation activity: DHS 163.14(11)(h)4.4. Using machines to remove paint through high speed operation such as abrasive blasting, sandblasting, needle gunning, or machine sanding, grinding or planing painted surfaces, unless the machine is operated with a properly fitted HEPA-filtered exhaust control to collect dust and debris at the point of generation and in a fully contained work area. DHS 163.14(11)(h)5.5. High-pressure water blasting or hydroblasting unless it is conducted in a fully contained work area with HEPA-filtered exhaust control and water collection system. DHS 163.14(11)(h)6.6. Using an improperly operating HEPA vacuum to clean up dust, debris, and paint chips. DHS 163.14(11)(i)(i) Waste handling. All wastewater, air emissions and solid waste from renovation activities shall be handled as follows: DHS 163.14(11)(i)1.1. Contained in the work area to prevent the release of dust and debris before removal for storage and disposal. If a chute is used to remove waste from the work area it shall be covered. DHS 163.14(11)(i)2.2. Stored in a container or enclosure at the conclusion of each work day that prevents access to and release of dust and debris. DHS 163.14(11)(i)3.3. Contained to prevent release of dust and debris for final transport at the conclusion of renovation activities. DHS 163.14(11)(j)1.1. Documented methodologies shall be followed to clean all work areas at the end of each work day and when all renovation activities have been completed. After the paint disturbing work has been completed, the work area shall be cleaned until no dust, debris or residue remains. DHS 163.14(11)(j)2.a.a. Collect all paint chips and debris and, without dispersing any of it, seal the waste in a heavy-duty waste bag. DHS 163.14(11)(j)2.b.b. Dispose of all sheeting as waste by first misting, then folding inward until as small as possible, taping seams shut or placing in heavy-duty waste bags. Sheeting used to isolate contaminated areas from non-contaminated areas shall remain in place until after final cleaning and removal of all other sheeting. DHS 163.14(11)(j)3.3. For exterior work areas, remove all visible debris, paint chips and residue in and below the work area, including from the ground, window sills and other horizontal surfaces. DHS 163.14(11)(j)4.a.a. Clean all objects and horizontal surfaces in the work area and within 2 feet outside the work area starting at the top and working down to the floor. DHS 163.14(11)(j)4.b.b. Clean walls starting at the ceiling and working down to the floor by either HEPA vacuuming or wiping with damp disposable cleaning cloths. DHS 163.14(11)(j)4.c.c. For other interior surfaces, thoroughly HEPA vacuum all remaining surfaces and objects in the work area, including horizontal surfaces, furniture and fixtures. After vacuuming, wipe the same surfaces, objects and fixtures with damp disposable cleaning cloths. DHS 163.14(11)(j)4.d.d. For carpets, use a HEPA vacuum with a beater bar to thoroughly and meticulously vacuum carpets and rugs. DHS 163.14(11)(j)4.e.e. For uncarpeted floors, thoroughly mop the floor using a 2- or 3-bucket mopping system or a wet mopping system using disposable cloths. DHS 163.14(11)(k)1.1. A visual inspection of the work area or areas shall be conducted by a certified lead-safe renovator or certified lead abatement worker or supervisor who meets the training requirements under s. DHS 163.11 (2) (c) after renovation activities and cleaning have been completed. DHS 163.14(11)(k)2.2. For interior renovation activities, a visual inspection shall be performed to determine whether dust, debris or residue is still present in or around the work areas. If dust, debris or residue is present, these conditions shall be removed by re-cleaning and another visual inspection shall be performed. DHS 163.14(11)(k)3.3. For exterior renovation activities, a visual inspection shall be performed to determine whether dust, debris or residue is still present on surfaces in and below the work area, including windowsills and the ground. If dust, debris or residue is present, these conditions shall be eliminated and another visual inspection shall be performed. After the work area or areas pass visual inspection, the activity is considered complete and warning signs may be removed. DHS 163.14(11)(L)(L) Post renovation cleaning verification for interior work areas. Except as allowed under par. (m), after a successful visual inspection, a certified lead-safe renovator or certified lead abatement worker or supervisor who meets the training requirements under s. DHS 163.11 (2) (c) shall verify cleaning of all interior work areas by using all of the following procedures: DHS 163.14(11)(L)1.1. Verify that each windowsill in the work area has been adequately cleaned by wiping the windowsill with an unused wet disposable cleaning cloth that is damp to the touch and comparing the cleaning cloth to the cleaning verification card. DHS 163.14(11)(L)1.a.a. If the cleaning cloth matches or is lighter than the cleaning verification card, the windowsill has been adequately cleaned. DHS 163.14(11)(L)1.b.b. If the cleaning cloth is darker than the cleaning verification card, the windowsill has not been adequately cleaned and re-cleaning following the procedures in par. (j) 3. is required. After re-cleaning, either use a new cleaning cloth or fold the used cloth in such a way that an unused surface is exposed and wipe the surface again. If the cleaning cloth matches or is lighter than the cleaning verification card, the windowsill has been adequately cleaned. DHS 163.14(11)(L)1.c.c. If the cleaning cloth is still darker than the cleaning verification card, wait one hour or until the surface has dried completely, whichever is longer. DHS 163.14(11)(L)1.d.d. After waiting for the windowsill to dry, wipe the sill with a dry disposable cleaning cloth. After this wipe, the windowsill has been adequately cleaned. DHS 163.14(11)(L)2.2. Verify that uncarpeted floors and countertops within the work area have been adequately cleaned by wiping the floors and countertops with an unused wet disposable cleaning cloth. Floors shall be wiped using a long-handled mop designed with a head attachment for wet disposable cleaning cloths. The cleaning cloth shall remain damp at all times while it is being used to wipe the surface for post-activity cleaning verification. If the surface within the work area is larger than 40 square feet, the surface within the work area shall be divided into roughly equal sections that are each less than 40 square feet. Wipe each section separately with a new wet disposable cleaning cloth. DHS 163.14(11)(L)2.a.a. If the cloth used to wipe that section within the work area matches the cleaning verification card, that section has been adequately cleaned. DHS 163.14(11)(L)2.b.b. If the cleaning cloth used to wipe a particular section is darker than the cleaning verification card, that section has not been adequately cleaned and re-cleaning following the procedures in par. (j) 3. is required. After re-cleaning, use a new cleaning cloth and wipe that section again. If the cleaning cloth matches or is lighter than the cleaning verification card, that section of the surface has been adequately cleaned. DHS 163.14(11)(L)2.c.c. If the cleaning cloth used to wipe a particular surface section is still darker than the cleaning verification card after the surface has been re-cleaned, wait for one hour or until the entire section surface has dried completely, whichever is longer. DHS 163.14(11)(L)2.d.d. After waiting for the entire section surface to dry, wipe the surface with a dry disposable cleaning cloth. After this wipe, that section of the surface has been adequately cleaned. DHS 163.14(11)(L)3.3. When the work area passes the post-renovation cleaning verification, warning signs may be removed. DHS 163.14(11)(m)1.1. Cleaning verification under par. (L) is not required if the contract between the company and the person contracting for the renovation activities or another federal, state, or local law or regulation requires dust clearance sampling at the conclusion of a renovation activity covered by this chapter. DHS 163.14(11)(m)2.2. Dust clearance samples for renovation activities shall be collected by a certified lead inspector, lead hazard investigator, lead risk assessor or lead sampling technician following clearance protocol under s. DHS 163.14 (5) (c). DHS 163.14(11)(m)3.3. The company performing the renovation shall re-clean or seal work areas and component types that fail dust clearance until the dust clearance sample results are below the clearance standards in s. DHS 163.14 (5) (c) 8. DHS 163.14(11)(n)(n) Activities conducted after successful cleaning verification or clearance testing. Activities that do not disturb paint, such as re-painting walls that have been properly prepared, are not regulated under this subchapter if they are conducted after cleaning verification has been performed or clearance testing results show dust lead levels below the clearances standards in s. DHS 163.14 (5) (c) 8. DHS 163.14(11)(o)1.1. Emergency renovations are exempt from the warning sign, containment, waste handling, training and certification requirements of this chapter to the extent necessary to respond to the emergency. DHS 163.14(11)(o)2.2. Emergency renovations are not exempt from the cleaning requirements of this subsection, which shall be performed by certified lead-safe renovators or individuals trained by a certified renovator, the cleaning verification requirements of this subsection, which shall be performed by certified renovators, or the recordkeeping requirements under s. DHS 163.13 (3) (c). DHS 163.14(11)(p)(p) Use of paint test kits. When requested by the party contracting for renovation services, the certified renovator may use only a department-recognized paint test kit to determine whether components and surfaces to be affected by the renovation activities contain lead-based paint. The certified renovator shall test each distinct component and surface to be affected, follow the manufacturer’s instructions for use of the paint test kit, and document and maintain the records required under s. DHS 163.13 (3) (c) 11. DHS 163.14 HistoryHistory: CR 00-172: cr. Register February 2002 No. 554, eff. 3-1-02; CR 03-019: am. (1) (g), (5) (c) 8. c. and (9) (g), cr. (9) (g) 3. Register July 2003 No. 571, eff. 8-1-03; correction in (8) (e) 1. made under s. 13.93 (2m) (b) 7., Stats., Register July 2003 No. 571; corrections in (1) (k) 3. and (8) (e) 1. made under s. 13.92 (4) (b) 7., Stats., Register January 2009 No. 637; EmR0928: emerg. renum. (1) (c) 1. to be (1) (c) and am., r. (1) (c) 2., am. (5) (a) 1. to 3., (b) 1., 2., (c) 3. a., 4. a., 8. (intro.), 10. (title), (intro.), and c. to e., r. and recr. (5) (b) 3., cr. (5) (b) 4. to 6., (10) and (11), eff. 10-16-09; CR 09-085: renum. (1) (c) 1. to be (1) (c) and am., r. (1) (c) 2., am. (5) (a) 1. to 3., (b) 1., 2., (c) 3. a., 4. a., 8. (intro.), 10. (title), (intro.), and c. to e., r. and recr. (5) (b) 3., cr. (5) (b) 4. to 6., (10) and (11) Register March 2010 No. 651, eff. 4-1-10; correction in (11) (a) 4. made under s. 13.92 (4) (b) 6., Stats., Register January 2012 No. 673; CR 10-110: r. and recr. (1) (e), r. (1) (f), am. (1) (h) (title), (i), r. and recr. (1) (k), am. (1) (m) 3., (2) (title), (a) (intro.), 1. to 4., cr. (2) (a) 5., am. (2) (b) (title), 1. (intro.) to 4., (c) (title), 1. (intro.) to 3., (3) (h), (i), (5) (c) 6., 8. a., cr. (5) (c) 8. am., am. (5) (c) 8. b., c., cr. (5) (c) 9. cm., cr., am. (5) (c) 9. d., r. (5) (c) 9. e., am. (7) (d) (intro.), 1., 3., (g) 14., r. and recr. (7) (g) 15., am. (8) (title), (c) 1. to 3., (e) 6., 7. a., b., (f) (intro.), cr. (8) (f) 11., am. (9) (c), (e), r. and recr. (10) (a), r. (10) (b), (c), am. (11) (a) 1. to 3., (f) 1., 4., (g) 1., 4., r. (11) (g) 5., am. (11) (h) 4., 6., 7. Register June 2021 No. 786, eff. 7-1-21; (1) (e) 5. (title) created under s. 13.92 (4) (b) 2., Stats., correction in (10) (a) 1. b. made under s. 35.17, Stats., and correction in (10) (e) (intro.) made under s. 13.92 (4) (b) 7., Stats., Register June 2021 No. 786. DHS 163.15DHS 163.15 Lead-based paint hazard standards. DHS 163.15(1)(1) Dust-lead hazard. A dust-lead hazard is present when one of the following applies: DHS 163.15(1)(a)(a) Lead hazard screen. For dust wipe samples taken during a lead hazard screen, the arithmetic mean of laboratory results is equal to or greater than the following: DHS 163.15(1)(a)2.2. Fifty micrograms per square foot (50 mg/ft2) on an interior windowsill. DHS 163.15(1)(b)(b) Risk assessment. For dust wipe samples taken during a risk assessment, the arithmetic mean of laboratory results is equal to or greater than the following: DHS 163.15(1)(b)2.2. One hundred micrograms per square foot (100 mg/ft2) on an interior windowsill. DHS 163.15(2)(2) Soil-lead hazard. A soil–lead hazard is present when the laboratory result for a bare soil sample is equal to or greater than any of the following: DHS 163.15(2)(a)(a) Four hundred parts per million (400 ppm) for the soil-lead concentration from a composite sample of bare soil in a play area. DHS 163.15(2)(b)(b) One thousand two hundred parts per million (1,200 ppm) for the arithmetic mean lead concentration from one or more composite samples of bare soil from the rest of the yard. DHS 163.15(3)(3) Lead-based paint hazard. A lead-based paint hazard is present when any of the following applies: DHS 163.15(3)(a)(a) A friction surface is subject to abrasion and the dust-lead levels on the nearest horizontal surface underneath the friction surface are equal to or greater than the dust-lead hazard levels under sub. (1). DHS 163.15(3)(b)(b) A chewable lead-based painted surface bears evidence of teeth marks. DHS 163.15(3)(c)(c) There is any damaged or deteriorated lead-based paint on an impact surface that is caused by impact from a related building component. DHS 163.15(3)(d)(d) There is any other deteriorated lead-based paint in any dwelling or child-occupied facility or on the exterior of any dwelling or child-occupied facility. DHS 163.15 HistoryHistory: CR 00-172: cr. Register February 2002 No. 554, eff. 3-1-02; CR 03-019: am. (2), cr. (3) Register July 2003 No. 571, eff. 8-1-03; CR 19-110: am. (1) (a) 1. to 2. and (b) 1. to 2. Register June 2021 No. 786, eff. 7-1-21. DHS 163.16DHS 163.16 Recognized paint test kits for renovation. The department recognizes paint test kits that have been tested and determined by the EPA Environmental Technology Verification Program, or other equivalent EPA approved testing program, to meet the EPA response criteria. DHS 163.16 HistoryHistory: EmR0928: emerg. cr. eff. 10-16-09; CR 09-085: cr. Register March 2010 No. 651, eff. 4-1-10; CR 19-110: am. (1), r. (2), (3) Register June 2021 No. 786, eff. 7-1-21; (1) (title) repealed under s. 13.92 (4) (b) 2., Stats., and (1) renumbered to DHS 163.13 under s. 13.92 (4) (b) 1., Stats., Register June 2021 No. 786. subch. III of ch. DHS 163Subchapter III — Accreditation of Lead Training Courses and Approval of Training Managers and Instructors
/code/admin_code/dhs/110/163
true
administrativecode
/code/admin_code/dhs/110/163/ii/14/11/j
Department of Health Services (DHS)
Chs. DHS 110-199; Health
administrativecode/DHS 163.14(11)(j)
administrativecode/DHS 163.14(11)(j)
section
true