This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
ATCP 78.11 Note Note: A request for hearing shall be submitted to the department's secretary via email at datcpappeals@wisconsin.gov, faxed to (608) 224-5034, mailed to PO Box 8911, Madison, Wisconsin 53708-8911, or hand delivered to 2811 Agriculture Drive, Madison, Wisconsin 53718. The hearing may be conducted by the department secretary or designee.
ATCP 78.11 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23.
ATCP 78.12 ATCP 78.12 Appeals of actions by agent health departments. If an agent issues a license under this chapter, the operator shall appeal an enforcement action to the agent health department.
ATCP 78.12 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23.
subch. IV of ch. ATCP 78 Subchapter IV — Standards for Recreational and Educational Camps
ATCP 78.13 ATCP 78.13 Qualifications of an authorized representative conducting inspections. An authorized representative of the department or its agent who inspects a camp or conducts a plan review for compliance with this chapter, shall meet the staffing qualification requirements set forth in s. ATCP 74.08.
ATCP 78.13 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23; correction made under s. 35.17, Stats., Register June 2023 No. 810.
ATCP 78.14 ATCP 78.14Inspections.
ATCP 78.14(1)(1)Refused inspection; process. If a person denies access to the department or its agent, the department or its agent shall inform the person of all the following:
ATCP 78.14(1)(a) (a) Access. The license holder is required to allow access to the department or its agent as specified pursuant to s. 97.12, Stats.
ATCP 78.14(1)(b) (b) License conditions. Access is a condition of the acceptance and retention of a license to operate a camp as specified pursuant to s. ATCP 78.04 (3).
ATCP 78.14(1)(c) (c) Inspection warrant. If the camp license holder denies access to an authorized representative of the department or its agent, the department or its agent may apply for an inspection warrant to allow access as provided in law pursuant to s. 66.0119, Stats.
ATCP 78.14(2) (2)Reporting of refused access. If the person in charge continues to refuse access after the department or its agent presents credentials, provides the explanation in sub. (1), and makes a final request for access, the department or its agent shall document details of the denial of access on an inspection report form.
ATCP 78.14(3) (3)Frequency of inspection. The department or its agent shall inspect a camp at least once during the licensing period, except as provided for pursuant to s. ATCP 78.15 or as approved in writing by the department.
ATCP 78.14(4) (4)Inspection documentation. The department or its agent shall document all of the following on an inspection report form:
ATCP 78.14(4)(a) (a) Facility information. Administrative information about the camp's legal identity, street and mailing addresses, type of establishment and operation, inspection date, type of water supply and sewage disposal, status of the license, and personnel certificates that may be required at the camp.
ATCP 78.14(4)(b) (b) Violation documentation. The conditions or other violations from this chapter or applicable chapters shall be documented to include the required corrective action by the license holder. An accompanying narrative shall contain all of the following:
ATCP 78.14(4)(b)1. 1. A factual description of the violation observed, including location of the observed violation.
ATCP 78.14(4)(b)2. 2. Citation and a brief description of the statute, administrative rule, or local ordinance that was observed to be violated.
ATCP 78.14(4)(b)3. 3. A statement indicating what corrective action the license holder has taken, or shall take, to regain compliance with the administrative rule, statute, or local ordinance.
ATCP 78.14(4)(b)4. 4. Unless otherwise indicated on the inspection report, each violation shall have a corrective action deadline. The corrective action deadline shall be based on the following criteria:
ATCP 78.14(4)(b)4.a. a. A priority violation shall be corrected immediately. Depending on the nature of the potential hazard involved and the complexity of the corrective action needed, the department or its agent may agree to or specify additional time, not to exceed 3 calendar days after the inspection, for the license holder to correct violations of a priority item as defined in this chapter.
ATCP 78.14(4)(b)4.b. b. The license holder has a maximum time of 10 calendar days after the inspection for the license holder to correct violations of a priority foundation item.
ATCP 78.14(4)(b)4.c. c. The license holder shall correct core items, as defined in this chapter, by a deadline agreed to or specified by the department or its agent, but no later than 90 calendar days after the inspection. The department or its agent may approve a written compliance schedule that extends beyond 90 calendar days if the license holder submits a written schedule of compliance and no health hazard exists, or will result, from allowing an extended schedule for compliance.
ATCP 78.14(5) (5)Issuing a report and obtaining acknowledgment of receipt. At the conclusion of the inspection, an authorized representative of the department or its agent shall sign the completed inspection report. The department or its agent shall review the inspection findings with the operator and obtain a signature on the inspection report from the license holder's designated person in charge. A copy of the inspection report shall be left with the person in charge at the completion of the inspection or emailed or otherwise presented within 2 business days after completion of the inspection.
ATCP 78.14(6) (6)Refusal to sign inspection report. If the license holder's designated person in charge refuses to sign the inspection report, the department or its agent shall do all of the following:
ATCP 78.14(6)(a) (a) Signature is not agreement with findings. Inform the person who declines to sign the inspection report that a written acknowledgment of receipt is not an agreement with findings.
ATCP 78.14(6)(b) (b) Obligation to correct violations. Inform the person that refusal to sign the inspection report will not affect the license holder's obligation to correct the violations noted in the inspection report by the deadlines specified.
ATCP 78.14(6)(c) (c) Documentation. Document the refusal to sign in the inspection report.
ATCP 78.14(7) (7)Posting of inspection reports. The department and its agents shall make inspection report information available to the public on the internet.
ATCP 78.14 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23; correction in (4) (b) 4. a., c. made under s. 35.17, Stats., Register June 2023 No. 810.
ATCP 78.15 ATCP 78.15 Active managerial control.
ATCP 78.15(1)(1)Inspection frequency. An annual inspection may be waived for not more than 2 out of every 3 license years, if the camp has exhibited active managerial control of public health hazards.
ATCP 78.15(2) (2)Criteria. The operator shall meet all the following criteria to demonstrate active managerial control that may qualify for a reduced inspection frequency by the department or its agent:
ATCP 78.15(2)(a) (a) Reinspection history. No reinspections have occurred after the last 3 routine inspections related to this chapter, or any other license issued by the department or its agent pursuant to ss. 97.30, 97.605, and 97.67, Stats.
ATCP 78.15(2)(b) (b) Standard operation procedures. The camp has written standard operating procedures for all of the following, if applicable:
ATCP 78.15(2)(b)1. 1. Rental group agreements pursuant to s. ATCP 78.16.
ATCP 78.15(2)(b)2. 2. Food service operation procedures including: temperature monitoring, employee handwashing, employee illness restrictions and exclusions, cleaning and sanitizing utensils, surfaces and equipment; vomiting and diarrhea clean up, date marking, receiving delivery of food, no bare hand contact with ready-to-eat foods, and washing fruits and vegetables.
ATCP 78.15(2)(b)3. 3. Supervision, safety and staff coverage pursuant to s. ATCP 78.26, including specific procedures for specialized and non-specialized program activities.
ATCP 78.15(2)(b)4. 4. Health staffing and medication administration as required pursuant to s. ATCP 78.27.
ATCP 78.15(2)(b)5. 5. Primitive camping and backcountry trips as specified pursuant to s. ATCP 78.32.
ATCP 78.15(2)(c) (c) Monitoring and corrective action. The camp has implemented monitoring, corrective action and documentation procedures for standard operating procedures.
ATCP 78.15(2)(d) (d) Verification. The camp has implemented a verification and documentation process for the standard operating procedures.
ATCP 78.15 Note Note: Camps with a written strategic plan and involvement within professional organizations are indicators that a camp is focused on the continuous process of effective control over public health hazards.
ATCP 78.15 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23; correction in (2) (a) made under s. 35.17, Stats., Register June 2023 No. 810.
subch. V of ch. ATCP 78 Subchapter V — General Provisions
ATCP 78.16 ATCP 78.16 Camps serving rental groups.
ATCP 78.16(1)(1)Written agreement.
ATCP 78.16(1)(a)(a) Signed. A written use agreement shall be signed by both authorized representatives of the camp and the rental group. Pf
ATCP 78.16(1)(b) (b) Designated responsibilities. The written use agreement shall clearly identify the responsibilities of the camp and the rental group. Pf
ATCP 78.16(1)(c) (c) Agreement contents. When the rental group provides specific services, the written use agreement shall indicate how the rental group will meet the minimum requirements pursuant to this chapter including the following:
ATCP 78.16(1)(c)1. 1. Food service requirements pursuant to s. ATCP 78.23. Pf
ATCP 78.16(1)(c)2. 2. Health services staff requirements pursuant to s. ATCP 78.27. Pf
ATCP 78.16(1)(c)3. 3. Health services staff required certifications pursuant to s. ATCP 78.27 (2). Pf
ATCP 78.16(1)(c)4. 4. Responsibility for collecting a camper and camp staff health history as required pursuant to s. ATCP 78.27 (1) (d) and (e). Pf
ATCP 78.16(1)(c)5. 5. Documentation of medication and treatment for campers and staff as required pursuant to s. ATCP 78.27 (5) (b). Pf
ATCP 78.16(1)(c)6. 6. Camp vehicle requirements pursuant to s. ATCP 78.27 (1) (c). Pf
ATCP 78.16(1)(c)7. 7. Specialized program activities and required certifications pursuant to s. ATCP 78.26 (3). Pf
ATCP 78.16(1)(c)8. 8. Adult staff to camper ratio requirements pursuant to s. ATCP 78.25. Pf
ATCP 78.16(1)(c)9. 9. Confirmation that background checks have been done on all staff as required pursuant to s. ATCP 78.26 (1). Pf
ATCP 78.16(1)(c)10. 10. Camper sexual abuse prevention training has been provided as required pursuant to s. ATCP 78.26 (5) (c). Pf
ATCP 78.16(1)(c)11. 11. Primitive camping requirements for water and waste are provided as required pursuant to s. ATCP 78.32. Pf
ATCP 78.16(1)(c)12. 12. The rental group has been informed of the reporting requirements for death, injury or illness to the department or its agent as required pursuant to s. ATCP 78.29. Pf
ATCP 78.16(1)(d) (d) Validation of written use agreement requirements. The camp operator shall retain copies of form templates and certifications for validating par. (c), in the written agreement or provide a written statement with the reviewer's name or initials that provisions pursuant to par. (c), have been reviewed and validated.
ATCP 78.16(2) (2)Record retention.
ATCP 78.16(2)(a)(a) Agreement retention time. The written use agreements shall be retained for a minimum of 3 years by the camp. Pf
ATCP 78.16(2)(b) (b) Contact information retention time. The camp shall maintain the rental group contact information for a minimum of 3 calendar years. Pf
ATCP 78.16(2)(c) (c) Medication and treatment record retention time. The rental group, if providing health supervision, shall maintain all camper medication and treatment records for a minimum of 3 calendar years and make the records available upon request to the department or its agent within 2 business days of the request. Pf
ATCP 78.16(2)(d) (d) Camp register retention time. The rental group shall keep a register and a method of tracking individuals entering and leaving the camp during operation, as required pursuant to s. ATCP 78.28, and make the register and tracking document available upon request to the department or agent within 2 business days of the request. Pf
ATCP 78.16 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23; correction in (1) (c) (intro.) made under s. 35.17, Stats., Register June 2023 No. 810.
ATCP 78.17 ATCP 78.17 Location of the camp.
ATCP 78.17(1)(1)Requirements.
ATCP 78.17(1)(a)(a) Well-drained. The camp's physical facilities shall be located on a well-drained site not subject to flooding.
ATCP 78.17(1)(b) (b) Graded. The premises shall be properly graded to prevent the accumulation of storm or other waters that may create hazards to the camp's physical facilities or to the health and safety of the campers or camp staff.
ATCP 78.17(1)(c) (c) Free from sources of contamination. No camp's physical facilities may be located in an area that is situated so that drainage from any source of filth, including garbage or animal waste disposal, can be deposited on the site. Pf
ATCP 78.17 Note Note: A camp's location with regard to flood plains and shore land areas shall comply with local zoning ordinances and with ch. NR 115 and s. NR 116.12 (2) (b), of the Wisconsin department of natural resources.
ATCP 78.17(2) (2)Sources of odor or flies. Cooking, dining and sleeping quarters shall not be located within 100 feet of a barn or enclosure housing livestock, a petting zoo, or other source of odors or flies.
ATCP 78.17 History History: CR 21-109: cr. Register June 2023 No. 810, eff. 9-24-23.
ATCP 78.18 ATCP 78.18 Water supply.
ATCP 78.18(1)(1)Water systems.
ATCP 78.18(1)(a) (a) General. The water source used to supply the camp shall be a public or a private water system.
ATCP 78.18(1)(b) (b) Well compliance with ch. NR 812. The operation, construction, installation, materials, and maintenance of the water system used to supply water to the camp shall comply with ch. NR 812, as enforced by the Wisconsin department of natural resources. Pf
ATCP 78.18(2) (2)Potable water supply.
ATCP 78.18(2)(a)(a) Drinking water standards. A camp shall be supplied with potable water under pressure that meets the drinking water standards in ch. NR 809, as enforced by the Wisconsin department of natural resources. P
ATCP 78.18(2)(b) (b) Water test report. The operator shall provide a copy of the water system bacteriological analysis for total coliform and E.coli in ss. NR 809.30 and 809.31 (1), and analysis for nitrate in s. NR 809.115 (4), report to the department or its agent for each well that supplies water to the camp based on the following:
ATCP 78.18(2)(b)1. 1. If the camp operates seasonally, the operator shall have the water tested and the report available within the preceding 2 months before the season begins for review by the department or its agent.
ATCP 78.18(2)(b)2. 2. If the camp is operated year round, the operator shall have the water tested and the report available for review by the department or its agent within one year prior to the requested review. Pf
ATCP 78.18 Note Note: Public water systems may require additional water testing as required by the Wisconsin department of natural resources in ch. NR 809.
ATCP 78.18(2)(c) (c) Unsafe potable water. The operator shall discontinue use of a public or private water system used to supply water to the camp, whenever the potable water from the system does not meet nitrate and bacteriologically safe drinking water standards in ch. NR 809. P
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.