This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
196.52(9)(a)1.b. b. A machine that drives an electric generator, including an engine, turbine, water wheel, or wind mill.
196.52(9)(a)1.c. c. Equipment that converts a fuel or source of energy into energy that powers a machine that drives an electric generator, including a boiler, but not including a nuclear reactor.
196.52(9)(a)1.d. d. A fuel or photovoltaic cell.
196.52(9)(a)2. 2. “Electric generating facility" means electric generating equipment and associated facilities that, together, constitute a complete facility for the generation of electricity.
196.52(9)(a)3. 3. “Leased generation contract" means a contract or arrangement or set of contracts or arrangements under which an affiliated interest of a public utility agrees with the public utility to construct or improve an electric generating facility and to lease to the public utility land and the facility for operation by the public utility.
196.52(9)(b) (b) The commission may approve a leased generation contract under sub. (3) only if all of the following apply:
196.52(9)(b)1. 1. The commission has not issued a certificate under s. 196.49 or a certificate of public convenience and necessity under s. 196.491 (3) before January 1, 2002, for any construction or improvement that is subject to the leased generation contract.
196.52(9)(b)2. 2. Construction or improvement of the electric generating facility that is subject to the leased generation contract commences on or after January 1, 2002.
196.52(9)(b)3. 3. Except as provided in s. 196.795 (5) (k) 3., no electric generating facility, electric generating equipment, or associated facilities, held or used by the public utility for the provision of electric service, is transferred to the affiliated interest.
196.52(9)(b)4. 4. The estimated gross cost of the construction or improvement that is subject to the leased generation contract is at least $10,000,000.
196.52(9)(b)5. 5. The construction or improvement is not to a nuclear-powered facility.
196.52(9)(b)6. 6. Any real property that the public utility transfers to the affiliated interest for the purpose of implementing the leased generation contract is transferred at book value, which is determined on the basis of the regulated books of account at the time of the transfer.
196.52(9)(b)7. 7. If the public utility transfers real property to the affiliated interest for the purpose of implementing the leased generation contract, the leased generation contract provides for transferring that real property back to the public utility, on the same terms and conditions as the original transfer, if the commission determines that the construction or improvement that is subject to the leased generation contract has not been completed.
196.52(9)(b)8. 8. The leased generation contract provides that, upon termination of the contract, all of the following apply:
196.52(9)(b)8.a. a. The public utility shall have the option, subject to commission approval, to extend the contract, or purchase the electric generating facility or the improvements to an electric generating facility, at fair market value as determined by a valuation process that is conducted by an independent 3rd party and that is specified in the contract.
196.52(9)(b)8.b. b. If the public utility exercises the option specified in subd. 8. a., the affiliated interest may require the public utility to extend the contract, rather than purchase the facilities or improvements, if the affiliated interest demonstrates to the commission that the extension avoids material adverse tax consequences and that the extension provides terms and conditions that are economically equivalent to a purchase.
196.52(9)(b)9. 9. For any gas-fired electric generating facility that is constructed under the leased generation contract, the term of the lease is 20 years or more.
196.52(9)(b)10. 10. For any coal-fired electric generating facility that is constructed under the leased generation contract, the term of the lease is 25 years or more.
196.52(9)(b)11. 11. The leased generation contract does not take effect until the date on which the affiliated interest commences construction or improvement of the electric generating facility, except that, if the leased generation contract relates to the construction or improvement of more than one electric generating facility, the leased generation contract does not take effect with respect to the construction or improvement of an individual electric generating facility until the date on which the affiliated interest commences construction or improvement on that electric generating facility.
196.52(9)(c) (c) Except as provided in par. (d), the commission may not increase or decrease the retail revenue requirements of a public utility on the basis of any income, expense, gain, or loss that is received or incurred by an affiliated interest of the public utility and that arises from the ownership of an electric generating facility or an improvement to an electric generating facility by an affiliated interest under a leased generation contract.
196.52(9)(d) (d) The commission shall allow a public utility that has entered into a leased generation contract that has been approved by the commission under sub. (3) to recover fully in its retail rates that portion of any payments under the leased generation contract that the commission allocates to the public utility's retail electric service, and that portion of all other costs that is prudently incurred in the public utility's operation and maintenance of the electric generating facility or improvement that is subject to the leased generation contract and that the commission allocates to the public utility's retail electric service.
196.52(9)(e) (e) Notwithstanding sub. (5), the commission may not modify or terminate a leased generation contract approved under sub. (3) except as specified in the leased generation contract or the commission's order approving the leased generation contract.
196.52(9)(f) (f) The commission shall maintain jurisdiction to ensure that the construction or improvement under a leased generation contract approved under sub. (3) is completed as provided in the leased generation contract.
196.52(9)(g) (g) Nothing in this subsection prohibits a cooperative association organized under ch. 185, a municipal utility, as defined in s. 196.377 (2) (a) 3., or a municipal electric company, as defined in s. 66.0825 (3) (d), from acquiring an interest in an electric generating facility that is constructed pursuant to a leased generation contract or from acquiring an interest in land on which such an electric generating facility is located.
196.52 Cross-reference Cross-reference: See also chs. PSC 100 and 113, Wis. adm. code.
196.525 196.525 Loans to officers or directors and loans to and investments in securities of holding companies; penalty.
196.525(1)(1)Except under rules prescribed by the commission, a public utility may not lend funds or credit to any of its officers or directors by any of the following and a public utility other than a telecommunications utility may not lend funds or credit to any corporation, except a public utility subject to the regulatory powers of the commission, if the corporation holds, directly or indirectly through any chain of ownership, 5 percent or more of the voting stock of the public utility or renders any managerial, supervising, engineering, legal, accounting or financial service to the public utility by any of the following:
196.525(1)(a) (a) Becoming surety, guarantor or endorser upon any obligations, contingent or otherwise, of the officer, director or corporation.
196.525(1)(b) (b) Loaning funds, securities or other like assets to the officer, director or corporation.
196.525(1)(c) (c) Purchasing in the open market, or otherwise, any obligation upon which the officer, director or corporation may be liable solely or jointly with others.
196.525(2) (2)Any contract made in violation of this section shall be void and subject to cancellation and recoupment by action at law. If a contract is made contrary to the provisions of this section, the commission, after notice and hearing, may order the public utility to take steps within 30 days to recover the funds or assets thus illegally loaned or transferred by action at law or other proceedings which will effectively release the public utility from the contract as surety, guarantor or endorser.
196.525(3) (3)Any director, treasurer or other officer or agent of a public utility who makes or votes to authorize a transaction in violation of this section may be fined not more than $10,000.
196.525(4) (4)The provisions of this section shall extend to the renewal or extension of existing contracts.
196.525 History History: 1983 a. 53; 1993 a. 496.
196.53 196.53 Franchise, foreign corporation not to have. No license, permit or franchise to own, operate, manage or control any plant or equipment for the production, transmission, delivery or furnishing of heat, light, water or power may be granted or transferred to a foreign corporation. This section does not apply to an independent system operator, as defined in s. 196.485 (1) (d), or an independent transmission owner, as defined in s. 196.485 (1) (dm), that is approved by the applicable federal agency, as defined in s. 196.485 (1) (c), and that controls transmission facilities, as defined in s. 196.485 (1) (h), in this and another state.
196.53 History History: 1985 a. 297; 1993 a. 496; 1997 a. 204.
196.53 Annotation This section does not violate the interstate commerce clause of the U. S. constitution. Alliant Energy Corporation v. Bie, 330 F.3d 904 (2003).
196.54 196.54 Indeterminate permits.
196.54(1)(1)Grants to be indeterminate. Every license, permit or franchise granted after July 11, 1907, to any public utility shall have the effect of an indeterminate permit subject to this chapter and ch. 197.
196.54(2) (2) Franchises made indeterminate. Every license, permit or franchise granted prior to July 11, 1907, by the state or by a municipality authorizing and empowering the grantee to own, operate, manage or control within this state, either directly or indirectly, a public utility or any part of a public utility is altered and amended to constitute and be an indeterminate permit which is subject to this chapter and ch. 197. The license, permit or franchise shall have the same force and effect as a license, permit or franchise granted after July 11, 1907, to any public utility, except as provided under s. 197.02.
196.54(3) (3) Validation of franchises and permits.
196.54(3)(a) (a) No franchise affected by sub. (2) and no indeterminate permit shall be declared invalid if:
196.54(3)(a)1. 1. The franchise or permit was not obtained by fraud, bribery or corrupt practices.
196.54(3)(a)2. 2. When the franchise or permit was granted, no officer of the municipality granting the franchise or permit was directly or indirectly interested in the franchise or permit or in the corporation obtaining the franchise or permit.
196.54(3)(b) (b) Any franchise affected by sub. (2) and any indeterminate permit is valid if:
196.54(3)(b)1. 1. The corporation having the franchise or permit, prior to surrendering of the franchise or at the beginning of its public service under the permit, in good faith has purchased or constructed any public utility, or any part of a public utility authorized by the franchise.
196.54(3)(b)2. 2. The corporation, in obtaining the franchise or permit, has substantially complied with the requirements provided by law for obtaining the franchise or permit.
196.54(4) (4) Grants after July 11, 1907; consent to municipal purchase. If a public utility accepts or operates under any license, permit or franchise granted after July 11, 1907, the public utility shall be deemed to have consented under its indeterminate permit to a future purchase of its property actually used and useful for the convenience of the public by the municipality in which the major part of it is situated for the compensation and under the terms and conditions determined by the commission. The public utility shall be deemed to have waived the right to require that the necessity of taking be established by the verdict of a jury, and any other remedy or right relative to condemnation, except any remedy or right under this chapter and ch. 197.
196.54(5) (5) Municipal purchase invalidates permit. An indeterminate permit shall be invalid if a municipality exercises its option to purchase the public utility being operated under the permit or if the permit is otherwise terminated according to law.
196.54(6) (6) Applicability. This section does not apply to a telecommunications utility.
196.54 History History: 1981 c. 390; 1983 a. 53 ss. 69 to 73; 1983 a. 192; 1993 a. 496.
196.58 196.58 Municipality to regulate utilities; appeal.
196.58(1g)(1g)In this section, “municipal regulation" has the meaning given in s. 182.017 (1g) (bm).
196.58(1r) (1r)The governing body of every municipality may:
196.58(1r)(a) (a) Determine by municipal regulation the quality and character of each kind of product or service to be furnished or rendered by any public utility within the municipality and all other terms and conditions, consistent with this chapter and ch. 197, upon which the public utility may be permitted to occupy the streets, highways or other public places within the municipality. The municipal regulation shall be in force and on its face reasonable.
196.58(1r)(b) (b) Require of any public utility any addition or extension to its physical plant within the municipality as shall be reasonable and necessary in the interest of the public, and designate the location and nature of the addition or extension, the time within which it must be completed, and any condition under which it must be constructed, subject to review by the commission under sub. (4).
196.58(1r)(c) (c) Provide a penalty for noncompliance with the provisions of any municipal regulation adopted under this subsection.
196.58(4) (4)
196.58(4)(a)(a) Upon complaint made by a public utility or by any qualified complainant under s. 196.26, the commission shall set a hearing and if it finds a municipal regulation under sub. (1r) to be unreasonable, the municipal regulation shall be void.
196.58(4)(b) (b) Notwithstanding any provision of this chapter, upon complaint by a telecommunications provider, including an alternative telecommunications utility, or a video service provider, the commission shall set a hearing and, if it finds to be unreasonable any municipal regulation relating to any product or service rendered by any such provider within a municipality or relating to the terms and conditions upon which such provider occupies the streets, highways, or other public places within the municipality, the municipal regulation shall be void.
196.58(4)(c) (c) Notwithstanding s. 182.017 (2), a municipal regulation is unreasonable under par. (a) or (b) if it requires a public utility, telecommunications provider, or video service provider to pay any part of the cost to modify or relocate the public utility's, telecommunications provider's, or video service provider's facilities to accommodate an urban rail transit system, as defined in s. 182.017 (1g) (ct).
196.58(5) (5)The commission shall have original and concurrent jurisdiction with municipalities to require extensions of service and to regulate service of public utilities. Nothing in this section shall limit the power of the commission to act on its own motion to require extensions of service and to regulate the service of public utilities.
196.58(6) (6)No public utility furnishing and selling gaseous fuel or undertaking to furnish or sell gaseous fuel in a municipality where the fuel has not been sold previously to the public shall change the character or kind of fuel by substituting for manufactured gas any natural gas or any mixture of natural and manufactured gas for distribution and sale in any municipality, or undertake the sale of natural gas in any municipality where no gaseous fuel was previously sold, unless the governing body of the municipality, by authorization, passage or adoption of appropriate municipal regulation, approves and authorizes the change in fuel or commencement of sale. No municipal regulation enacted under this subsection may be inconsistent or in conflict with any certificate granted under s. 196.49.
196.58(7) (7)
196.58(7)(a)(a) If a municipality operating a water system seeks to serve consumers of an area which is part of the municipality and in the same county, but in order to serve such consumers it is necessary or economically prudent for the municipality to install mains, transmission lines, pipes or service connections through, upon or under a public street, highway, road, public thoroughfare or alley located within the boundaries of any adjacent municipality, the municipality seeking the installation may file a petition with the clerk of the legislative body of the adjacent municipality requesting approval for the installation of the mains, transmission lines, pipes or service connections. The governing body of the adjacent municipality shall act on the petition within 15 days after the petition is filed. If the governing body of the adjacent municipality fails to act within the 15-day period, the petition shall be deemed approved and the municipality may proceed with the installations required for service to its consumers. If, however, the governing body of the adjacent municipality rejects the petition, the municipality may make application to the commission for authority to install within the boundaries of the adjacent municipality the installations necessary to provide service to its consumers. The commission shall hold a hearing upon the application of the municipality. If the commission determines that it is necessary or economically prudent that the municipality seeking to serve its consumers make the installations within the boundaries of the adjacent municipality, the commission shall promptly issue an order authorizing the municipality to proceed to make the installation. In the order, the commission may establish the manner of making the installation.
196.58(7)(b) (b) A municipality making an installation under this section shall restore the land on or in which such installation has been made to the same condition as it existed prior to the installation. Failure to make the restoration shall subject the municipality to an action for damages by the adjacent municipality. The adjacent municipality may require a performance bond from the municipality seeking to make the installation. If no agreement can be effected between the municipalities as to the amount of the performance bond, the commission shall determine the amount of the bond. If the commission issues an order authorizing an installation under this subsection, the commission shall determine the amount of the performance bond which shall be required of the applicant municipality.
196.58 History History: 1981 c. 390; 1983 a. 53; 1995 a. 378; 2013 a. 20.
196.58 Cross-reference Cross-reference: See also ch. PSC 130, Wis. adm. code.
196.59 196.59 Merchandising by utilities. Each public utility engaged in the production, transmission, delivery or furnishing of heat, light or power either directly or indirectly to or for the use of the public shall keep separate accounts to show any profit or loss resulting from the sale of appliances or other merchandise. The commission may not take the profit or loss into consideration in arriving at any rate to be charged for service by the public utility.
196.59 History History: 1983 a. 53.
196.595 196.595 Utility advertising practices.
196.595(1)(1)In this section:
196.595(1)(a) (a) “Advertising" means:
196.595(1)(a)1. 1. Printed and published material and descriptive literature of a utility used in newspapers, magazines, radio and TV scripts, billboards and similar displays.
196.595(1)(a)1m. 1m. Any material which provides information favorable to a public utility on any issue about which the utility is attempting to influence legislative or administrative action by direct oral or written communication with any elective state official, agency official or legislative employee if the practice is regulated under subch. III of ch. 13.
196.595(1)(a)2. 2. Descriptive literature and sales aids of all kinds issued by a utility for presentation to utility consumers and other members of the public, including but not limited to any material enclosed with or added to a utility billing statement, circulars, leaflets, booklets, depictions, illustrations and form letters.
196.595(1)(a)3. 3. Prepared sales talks to the public and public informational facilities.
196.595(1)(a)4. 4. Other materials and procedures enumerated by rule of the commission which promote or provide information to the public about a public utility.
196.595(1)(b) (b) “Expenditure" means any cost of advertising directly incurred by a utility and any cost of advertising incurred by contribution to parent or affiliated companies or to trade associations.
196.595(1)(c) (c) “Public utility" in this section means any public utility, as defined in s. 196.01, engaged in the transmission, delivery, or furnishing of natural gas by means of pipes or mains, heat, light, water, or power. “Public utility" does not include any cooperative association organized under ch. 185.
196.595(2) (2)A public utility may not charge its ratepayers for any expenditure for advertising unless the advertising:
196.595(2)(b) (b) Produces a demonstrated, direct and substantial benefit for ratepayers. Advertising which produces a direct and substantial benefit for ratepayers is limited to advertising which does any of the following:
196.595(2)(b)1. 1. Demonstrates energy or water conservation methods.
196.595(2)(b)2. 2. Conveys safety information on the use of energy.
196.595(2)(b)2g. 2g. Conveys health or safety information related to a water system or the use of water, including information on preventing frozen water laterals.
196.595(2)(b)2r. 2r. Identifies the public utility on public utility property or the location of public utility property.
196.595(2)(b)3. 3. Demonstrates methods of reducing ratepayer costs.
196.595(2)(b)4. 4. Otherwise directly and substantially benefits ratepayers.
Loading...
Loading...
2021-22 Wisconsin Statutes updated through 2023 Wis. Act 71 and through all Supreme Court and Controlled Substances Board Orders filed before and in effect on February 14, 2024. Published and certified under s. 35.18. Changes effective after February 14, 2024, are designated by NOTES. (Published 2-14-24)