Trans 401.08(2)(b)11.e.e. Location of major structural and non–structural best management practices identified in the plan. Trans 401.08(2)(b)11.h.h. Wetlands, area and extent of wetland acreage on the site and locations where storm water is discharged to a surface water or wetland. Trans 401.08(2)(b)12.12. A description of appropriate best management practices that will be employed at the selected site to prevent sediments and pollutants from reaching waters of the state. The plan shall clearly describe the appropriate best management practices for each major activity identified and the timing during the construction process that the measures will be implemented. The description of best management practices shall include, when appropriate, the following minimum requirements: Trans 401.08(2)(b)12.a.a. Description of permanent or temporary best management practices, including a schedule for implementing them. Site plans shall ensure the preservation of existing vegetation wherever practicable and the stabilization of disturbed portions of the selected site. Trans 401.08(2)(b)12.b.b. Description of structural practices to divert runoff away from exposed soils, to store flows or to otherwise limit runoff and the discharge of pollutants from the selected site. Unless specifically approved in writing by the department, structural measures shall be installed on upland soils. Trans 401.08(2)(b)12.k.k. Installation of permanent stabilization practices as soon as possible after final grading. Trans 401.08(2)(b)14.14. A description of the procedures to maintain, in good and effective operating condition, vegetation, best management practices and other protective measures. Trans 401.08(3)(3) Amendments. Subject to the written approval of the department, a prime contractor shall amend the ECIP whenever the project engineer determines: Trans 401.08(3)(a)(a) There is a change in design, construction, operation or maintenance at a project site or selected site that has the reasonable potential for a discharge to waters of the state and that has not been addressed in the ECIP. The department shall pay for changes under this paragraph that are necessitated by department action. The prime contractor shall pay for all other changes under this paragraph, unless the department agrees to pay for the change. Trans 401.08(3)(b)(b) The best management practices required by the plan fail to reduce adverse impacts to waters of the state caused by a discharge. Subject to s. Trans 401.12, the department shall pay for changes under this paragraph. Trans 401.08(3)(c)(c) An amendment approved under this subsection supersedes any contradictory provisions of the erosion control plan. Trans 401.08 HistoryHistory: Cr. Register, October, 1994, No. 466, eff. 11-1-94; CR 02-081: (2) (a) 2m. renum. from Trans 401.07 (2) (j) 5., r. (intro.), (1) (b) and (2) (b) 8., am. (1) (a), (c) to (h), (2) (a) 1. to 4., (b) (intro.), 1. to 7., 11. (intro.), e. and g., 12. (intro.) to c., 14. and (3) (intro.) to (b), cr. (1) (am), (ar) and (3) (c), r. and recr. (2) (b) 9., Register December 2002 No. 564, eff. 1-1-03; corrections in (1) (a), (ar) 1. a. made under s. 13.92 (4) (b) 6., Stats., Register February 2013 No. 686. Trans 401.09Trans 401.09 Maintenance of best management practices. Trans 401.09(1g)(1g) General responsibility. A prime contractor or utility person, as appropriate, shall implement, install and maintain best management practices at a site as required in the contract documents, as defined in s. Trans 401.12 (1) (a). Trans 401.09(1m)(1m) Before and during construction or maintenance activity. Before and during the period of construction or maintenance activity, the prime contractor or utility person shall implement, install and maintain, or cause to be performed, all best management practices required by the erosion control plan, the ECIP and the requirements of this chapter. The prime contractor or utility person shall also implement any corrective action that is ordered under s. Trans 401.105. A utility person shall notify the appropriate department representative at least 24 hours before the installation of best management practices.