Trans 233.06(1)(1) The land division shall be laid out with the least practicable number of highways and private roads or driveways connecting with abutting state trunk highways or connecting highways. Trans 233.06(2)(2) The department shall determine a minimum allowable distance between connections with the state trunk highway or connecting highway, between any 2 highways within the land division and between a highway within the land division and any existing or planned highway. To the extent practicable, the department shall require a distance of at least 1,000 feet between connections with a state trunk highway or connecting highway. Trans 233.06 HistoryHistory: Cr. Register, January, 1999, No. 517, eff. 2-1-99. Trans 233.07(1)(1) The department may issue temporary connection permits, which authorize the connection of a highway or a private road or driveway with a state trunk highway or connecting highway. The department may issue temporary connection permits in the case of: Trans 233.07(1)(b)(b) A land division layout which might necessitate a point or pattern of traffic access for a future adjacent land division, not in accordance with s. Trans 233.06 (2). Trans 233.07(2)(2) The department may require that such temporary connections be altered or closed by the permit holder at a later date in order to achieve a desirable traffic access pattern. The permit may require the permit holder to alter or close the temporary connection by a specified date or upon the completion of a specified activity. The permit holder is responsible for the expense of closing or altering the temporary connection. Trans 233.07(2m)(2m) A temporary connection shall be prominently labeled “Temporary Connection” on the land division map, and the following restriction shall be lettered on the land division map: “The temporary connection(s) shown on this plat shall be used under a temporary connection permit which may be canceled at such time as a feasible alternate means of access to a highway is provided.”
Trans 233.07(3)(3) When such a temporary connection is granted, the owner shall dedicate a service road or a satisfactory alternative, to provide for a present or future pattern of access that complies with s. Trans 233.06 (2). Trans 233.07 HistoryHistory: Cr. Register, January, 1999, No. 517, eff. 2-1-99. Trans 233.08Trans 233.08 Setback requirements and restrictions. Trans 233.08(1)(1) Except as provided in this section or in s. Trans 233.11 or, with respect to connecting highways, as provided in s. 86.16 (1), Stats., no person may erect, install or maintain any structure or improvement within a setback area determined under sub. (2) or (3). Trans 233.08(2)(a)(a) Except as provided in par. (b), the setback area is the area within 110 feet of the centerline of a state trunk highway or connecting highway or within 50 feet of the nearer right-of-way line of a state trunk highway or connecting highway, whichever is furthest from the centerline. Trans 233.08(2)(b)(b) If an applicable ordinance allows structures or improvements to be located closer to the right-of-way of a state trunk highway or connecting highway than is provided under par. (a), the setback area is the area between the right-of-way and the more restrictive of the following: Trans 233.08(2)(c)(c) At least once every 2 years, the department shall produce general reference maps that generally identify major intersections and the highways specified in subds. 1. to 5. The department may reduce or extend, by not more than 3 miles along the highway, the area subject to a setback established under par. (a) or (b) to establish logical continuity of a setback area or to terminate the setback area at a readily identifiable physical feature or legal boundary, including a highway or property boundary. Persons may seek special exceptions to the setback requirement applicable to these major intersections and highways, as provided in s. Trans 233.11 (3). The setback area established under par. (a) or (b) applies only to major intersections and to highways identified as: Trans 233.08(2)(c)2.2. State trunk highways and connecting highways that are functionally classified as principal arterials in accordance with procedure 4-1-15 of the department’s facilities development manual dated July 2, 1979. Trans 233.08(2)(c)3.3. State trunk highways and connecting highways within incorporated areas, within an unincorporated area within 3 miles of the corporate limits of a first, second or third class city, or within an unincorporated area within 1½ miles of a fourth class city or a village. Trans 233.08(2)(c)4.4. State trunk highways and connecting highways with average daily traffic of 5,000 or more. Trans 233.08(2)(c)5.5. State trunk highways and connecting highways with current and forecasted congestion projected to be worse than level of service “C,” as determined under s. Trans 210.05 (1), within the following 20 years. Trans 233.08 NoteNote: The National Highway System (NHS) includes the Interstate System, Wisconsin’s Corridors 2020 routes, and other important routes. Highways on the NHS base system were designated by the Secretary of USDOT and approved by Congress in the National Highway System Designation Act of 1995. NHS Intermodal Connector routes were added in 1998 with the enactment of the Transportation Equity Act for the 21st Century. Modifications to the NHS must be approved by the Secretary of USDOT. Guidance criteria and procedures for the functional classification of highways are provided in (1) the Federal Highway Administration (FHWA) publication ’Highway Functional Classification--Concepts, Criteria and Procedures” revised in March 1989, and (2) former ch. Trans 76. The federal publication is available on request from the FHWA, Office of Environment and Planning, HEP-10, 400 Seventh Street, SW., Washington, DC 20590. Former ch. Trans 76 is available from the Wisconsin Department of Transportation, Division of Transportation Investment Management, Bureau of Planning. The results of the functional classification are mapped and submitted to the Federal Highway Administration (FHWA) for approval and when approved serve as the official record for Federal-aid highways and one basis for designation of the National Highway System. In general, the highway functional classifications are rural or urban: Principal Arterials, Minor Arterials, Major Collectors, Minor Collectors, and Local Roads. The definition of “level of service” used for this paragraph is the same as in ss. Trans 210.03(4) and 210.05(1) for purposes of the MAJOR HIGHWAY PROJECT NUMERICAL EVALUATION PROCESS. In general, the “level of service” refers to the ability of the facility to satisfy both existing and future travel demand. Six levels of service are defined for each type of highway facility ranging from A to F, with level of service A representing the best operating conditions and level of service F the worst. Department engineers will use the procedures outlined in the general design consideration guidelines in Chapter 11, Section 5 of the Wisconsin Department of Transportation’s Facilities Development Manual to determine the level of highway service. Under the rule as effective February 1, 1999, s. Trans 233.08(1) provides 4 ways to erect something in a setback area (1) for utilities, follow the procedures set forth in the rule, (2) obtain a variance (now “special exception”), (3) for utilities, get local approval for utilities on or adjacent to connecting highways, or for utilities within the right of way of state trunk highways, get department approval (a mere “technical” exception), and (4) erect something that doesn’t fall within the definition of “structure” or within the definition of “improvement.” The provision below now adds a fifth “exception,” (5) be 15 feet or more outside the right of way line of a defined and mapped set of highways. Trans 233.08(2)(d)(d) In addition to producing general reference maps at least once every 2 years that identify highways and intersections under par. (c), at least every 2 years the department shall also produce more detailed reference maps suitable for use in the geographic area of each district office. Trans 233.08(3)(3) If any portion of a service road right-of-way lies within the setback area determined under sub. (2), the setback area shall be increased by the lesser of the following: Trans 233.08(3)(a)(a) The width of the service road right-of-way, if the entire service road right-of-way lies within the setback area. Any increase under this paragraph shall be measured from the boundary of the setback area determined under sub. (2). Trans 233.08(3)(b)(b) The distance by which the service road right-of-way lies within the setback area, if the entire service road right-of-way does not lie within the setback area. Any increase under this paragraph shall be measured from the nearer right-of-way line of the service road. Trans 233.08 NoteNote: For example, if a service road ROW extends 15 feet (measured perpendicularly to the setback) into the setback determined under sub. (2), and runs for a distance of 100 feet, the setback determined under sub. (2) shall be pushed 15 feet further from the centerline, running for a distance of 100 feet. See Graphic.
Trans 233.08(3m)(a)(a) Notwithstanding sub. (1), a public utility may erect, install or maintain a utility facility within a setback area. Trans 233.08(3m)(b)(b) If the department acquires land that is within a setback area for a state trunk highway, as provided by this chapter, and on which a utility facility is located, the department is not required to pay compensation or other damages relating to the utility facility, unless the utility facility is any of the following: Trans 233.08(3m)(b)2.2. Erected or installed on a recorded utility easement that was acquired prior to February 1, 1999. Trans 233.08(3m)(b)3.3. Erected or installed after the land division map is recorded but with prior notice in writing, with a plan showing the nature and distance of the work from the nearest right-of-way line of the highway, to the department’s appropriate district office within a normal time of 30 days, but no less than 5 days, before any routine, minor utility erection or installation work commences, nor less than 60 days, before any major utility erection or installation work commences, if any utility work is within the setback. Trans 233.08 NoteNote: For purposes of this section, “major utility erection or installation work” includes, but is not limited to, work involving transmission towers, communication towers, water towers, pumping stations, lift stations, regulator pits, remote switching cabinets, pipelines, electrical substations, wells, gas substations, antennae, satellite dishes, treatment facilities, electrical transmission lines and facilities of similar magnitude. “Routine minor utility erection or installation work” refers to single residential distribution facilities and similar inexpensive work of less magnitude. The concept behind the flexible, “normal time of 30 days” standard for utility submission of notice and plans to the department is to encourage and require at least 60 days notice from utilities for larger, complex or expensive installations, but not for routine, minor utility work that has traditionally involved only a few days notice for coordination and issuance of utility permits by the department for which a minimum of 5 days notice is mandatory. However, the normal time for submission and review is 30 days. This notice and plan requirement does not apply to maintenance work on existing utilities.
Trans 233.08(3m)(b)4.4. Erected or installed before the land division map is recorded but modified after that date in a manner that increases the cost to remove or relocate the utility facility. In such a case, the department shall pay compensation or other damages related to the utility facility as it existed on the date the land division map was recorded, except that if the modification was made with prior notice in writing, with a plan showing the nature and distance of the work from the nearest right-of-way line of the highway, to the department’s appropriate district office within a normal time of 30 days, but no less than 5 days, before any routine, minor utility erection or installation work commences, nor less than 60 days, before any major utility erection or installation work commences, if any utility work is within the setback, then the department shall pay compensation or other damages related to the utility facility as modified. Trans 233.08(3m)(c)(c) If a local unit of government or the department acquires land that is within a setback area for a connecting highway as provided by this chapter and on which a utility facility is located, the department is not required to pay compensation or other damages relating to the utility facility, unless the utility facility is compensable under the applicable local setbacks and the utility facility is in any of the categories described in par. (b) 1. to 4. Trans 233.08 NoteNote: A “connecting highway” is not a state trunk highway. It is a marked route of the state trunk highway system over the streets and highways in municipalities which the Department has designated as connecting highways. Municipalities have jurisdiction over connecting highways and are responsible for their maintenance and traffic control. The Department is generally responsible for construction and reconstruction of the through lanes of connecting highways, but costs for parking lanes and related municipal facilities and other desired local improvements are local responsibilities. See ss. 84.02 (11), 84.03 (10), 86.32 (1) and (4), and 340.01 (60), Stats. A listing of connecting highways and geographic end points are available in the department’s “Official State Trunk Highway System and the Connecting Highways” booklet that is published annually as of December 31. Trans 233.08(3m)(d)(d) The department shall review the notice and plan to determine whether a planned highway project within a 6-year improvement program under s. 84.01 (17), Stats., or a planned major highway project enumerated under s. 84.013 (3), Stats., will conflict with the planned utility facility work. If the department determines a conflict exists, it will notify the utility in writing within a normal time of 30 days, but no more than 5 days, after receiving the written notice and plan for any routine, minor utility erection or installation work, nor more than 60 days, after receiving the written notice and plan for any major utility erection or installation work, and request the utility to consider alternative locations that will not conflict with the planned highway work. The department and utility may also enter into a cooperative agreement to jointly acquire, develop and maintain rights of way to be used jointly by WISDOT and the public utility in the future as authorized by s. 84.093, Stats. If the department and utility are not able to make arrangements to avoid or mitigate the conflict, the utility may proceed with the utility work, but notwithstanding pars. (b) and (c), the department may not pay compensation or other damages relating to the utility facility if it conflicts with the planned highway project. In order to avoid payment of compensation or other damages to the utility, the department is required to record a copy of its written notice to the utility of the conflict, that adequately describes the property and utility work involved, with the register of deeds in the county in which the utility work or any part of it is located. Trans 233.08 NoteNote: The Department will make the general and detailed maps readily available to the public on the internet and through other effective means of distribution.
Trans 233.08(3n)(3n) Any person may erect, install or maintain any structure or improvement at 15 feet and beyond from the nearer right-of-way line of any state trunk highway or connecting highway not identified in s. Trans 233.08 (2) (c). Any person may request a special exception to the setback requirement established under this subsection, as provided in s. Trans 233.11 (3). This subsection does not apply to major intersections or within the desirable stopping sight distance, as determined under procedure 11-10-5 of the department’s facilities development manual dated June 10, 1998, of the intersection of any state trunk highway or connecting highway with another state trunk highway or connecting highway. This subsection does not supersede more restrictive requirements imposed by valid applicable local ordinances. Trans 233.08 NoteNote: Technical figures 2, 3, 3m, 4, 4m, 5, 6 and 6m within Procedure 11-10-5 have various dates other than June 10, 1998 or are undated.
Trans 233.08(4)(4) The land division map shall show the boundary of a setback area on the face of the land division map and shall clearly label the boundary as a highway setback line and shall clearly show existing structures and improvements lying within the setback area. Trans 233.08(5)(5) The owner shall place the following restriction upon the same sheet of the land division map that shows the highway setback line: “No improvements or structures are allowed between the right-of-way line and the highway setback line. Improvements and structures include, but are not limited to, signs, parking areas, driveways, wells, septic systems, drainage facilities, buildings and retaining walls. It is expressly intended that this restriction is for the benefit of the public as provided in section 236.293, Wisconsin Statutes, and shall be enforceable by the Wisconsin Department of Transportation or its assigns. Contact the Wisconsin Department of Transportation for more information. The phone number may be obtained by contacting the County Highway Department.”
If on a CSM there is limited space for the above restriction on the same sheet that shows the setback line, then the following abbreviated restriction may be used with the standard restriction placed on a subsequent page: “Caution - Highway Setback Restrictions Prohibit Improvements. See sheet ______.”
Trans 233.08 HistoryHistory: Cr. Register, January, 1999, No. 517, eff. 2-1-99; cr. (2) (c), (d) and (3n), Register, January, 2001, No. 541, eff. 2-1-01. Trans 233.105(1)(1) Noise. When noise barriers are warranted under the criteria specified in ch. Trans 405, the department is not responsible for any noise barriers for noise abatement from existing state trunk highways or connecting highways. Noise resulting from geographic expansion of the through-lane capacity of a highway is not the responsibility of the owner, user or land divider. In addition, the following notation shall be placed on the land division map: “The lots of this land division may experience noise at levels exceeding the levels in s. Trans 405.04, Table I. These levels are based on federal standards. The department of transportation is not responsible for abating noise from existing state trunk highways or connecting highways, in the absence of any increase by the department to the highway’s through-lane capacity.” Trans 233.105 NoteNote: Some land divisions will result in facilities located in proximity to highways where the existing noise levels will exceed recommended federal standards. Noise barriers are designed to provide noise protection only to the ground floor of abutting buildings and not other parts of the building. Noise levels may increase over time. Therefore, it is important to have the caution placed on the land division map to warn owners that the department is not responsible for further noise abatement for traffic and traffic increases on the existing highway, in the absence of any increase by the department to the highway’s through-lane capacity.
Trans 233.105(2)(2) Vision corners. The department may require the owner to dedicate land or grant an easement for vision corners at the intersection of a highway with a state trunk highway or connecting highway to provide for the unobstructed view of the intersection by approaching vehicles. The owner shall have the choice of providing the vision corner by permanent easement or by dedication. If the department requires such a dedication or grant, the owner shall include the following notation on the land division map: “No structure or improvement of any kind is permitted within the vision corner. No vegetation within the vision corner may exceed 30 inches in height.”
Trans 233.105 NoteNote: Guide dimensions for vision corners are formally adopted in the Department’s Facilities Development Manual, Chapter 11, pursuant to s. 227.01 (13) (e), Stats. Trans 233.105(3)(3) Drainage. The owner of land that directly or indirectly discharges stormwater upon a state trunk highway or connecting highway shall submit to the department a drainage analysis and drainage plan that assures to a reasonable degree, appropriate to the circumstances, that the anticipated discharge of stormwater upon a state trunk highway or connecting highway following the development of the land is less than or equal to the discharge preceding the development and that the anticipated discharge will not endanger or harm the traveling public, downstream properties or transportation facilities. Various methods of hydrologic and hydraulic analysis consistent with sound engineering judgment and experience and suitably tailored to the extent of the possible drainage problem are acceptable. Land dividers are not required by this subsection to accept legal responsibility for unforeseen acts of nature or forces beyond their control. Nothing in this subsection relieves owners or users of land from their obligations under s. 88.87 (3) (b), Stats. Trans 233.105 NoteNote: In sec. 88.87 (1), Stats., the Legislature has recognized that development of private land adjacent to highways frequently changes the direction and volume of flow of surface waters. The Legislature found that it is necessary to control and regulate the construction and drainage of all highways in order to protect property owners from damage to lands caused by unreasonable diversion or retention of surface waters caused by a highway and to impose correlative duties upon owners and users of land for the purpose of protecting highways from flooding or water damage. Wisconsin law, sec. 88.87 (3), Stats., imposes duties on every owner or user of land to provide and maintain a sufficient drainage system to protect downstream and upstream highways. Wisconsin law, sec. 88.87 (3) (b), Stats., provides that whoever fails or neglects to comply with this duty is liable for all damages to the highway caused by such failure or neglect. The authority in charge of maintenance of the highway may bring an action to recover such damages, but must commence the action within 90 days after the alleged damage occurred. Section 893.59, Stats. Additional guidance regarding drainage may be found in Chapter 13 and Procedure 13-1-1 of the Department’s Facilities Development Manual. Trans 233.105 HistoryHistory: Cr. Register, January, 1999, No. 517, eff. 2-1-99; am. (1), (2) (intro.) and (3), Register, January, 2001, No. 541, eff. 2-1-01. Trans 233.11(1)(1) Department consent. No municipality or county may issue a variance or special exception from this chapter without the prior written consent of the department. Trans 233.11(3)(a)(a) Special exceptions for setbacks allowed. The department, district office or, if authorized by a delegation agreement under sub. (7), reviewing municipality may authorize special exceptions from this chapter only in appropriate cases when warranted by specific analysis of the setback needs, as determined by the department, district office or reviewing municipality. A special exception may not be contrary to the public interest and shall be in harmony with the general purposes and intent of ch. 236, Stats., and of this chapter. The department, district office or reviewing municipality may grant a special exception that adjusts the setback area or authorizes the erection or installation of any structure or improvement within a setback area only as provided in this subsection. The department, district office or reviewing municipality may require such conditions and safeguards as will, in its judgment, secure substantially the purposes of this chapter. Trans 233.11 NoteNote: The phrase “practical difficulty or unnecessary hardship” has been eliminated from the rule that was effective February 1, 1999, to avoid the adverse legal consequences that could result from the existing use of the word “variance.” The Wisconsin Supreme Court has interpreted “variance” and this phrase to make it extremely difficult to grant “variances” and in so doing has eased the way for third party legal challenges to many “variances” reasonably granted. See State v. Kenosha County Bd. of Adjust., 218 Wis. 2d 396, 577 N.W.2d 813 (1998). The Supreme Court defined “unnecessary hardship” in this context as an owner having “no reasonable use of the property without a variance.” Id. at 413. The “special exception” provision in this rule is not intended to be so restrictive and has not been administered in so restrictive a fashion. In the first year following revisions of ch. Trans 233, effective February 1, 1999, the Department granted the vast majority of “variances” requested, using a site and neighborhood-sensitive context based on specific analysis. Trans 233.11(3)(b)(b) Specific analysis for special exceptions for setbacks. Upon request for a special exception from a setback requirement of this chapter, the department, district office or reviewing municipality shall specifically analyze the setback needs. The analysis may consider all of the following: Trans 233.11(3)(b)2.2. The vicinity of the proposed land division and its existing development pattern. Trans 233.11(3)(b)3.3. Land use and transportation plans and the effect on orderly overall development plans of local units of government. Trans 233.11(3)(b)4.4. Whether the current and forecasted congestion of the abutting highway is projected to be worse than level of service “C,” as determined under s. Trans 210.05 (1), within the following 20 years. Trans 233.11(3)(b)6.6. The effect of the proposed structure or improvement on other property or improvements in the area. Trans 233.11(3)(b)7.7. The impact of potential highway or other transportation improvements on the continued existence of the proposed structure or improvement. Trans 233.11(3)(b)8.8. The impact of removal of all or part of the structure or improvement on the continuing viability or conforming use of the business, activity, or use associated with the proposed structure or improvement. Trans 233.11(3)(b)11.11. Other criteria to promote public purposes consistent with local ordinances or plans for provision for light and air, providing fire protection, solving drainage problems, protecting the appearance and character of a neighborhood, conserving property values, and, in particular cases, to promote aesthetic and psychological values as well as ecological and environmental interests. Trans 233.11(3)(c)(c) Adjust setback. If the department, district office or reviewing municipality grants a special exception by adjusting the setback area, the department shall pay just compensation for any subsequent department-required removal of any structure or improvement that the department has allowed outside of the approved, reduced setback area on land that the department acquires for a transportation improvement. The department may not decrease the 15 foot setback distance established under s. Trans 233.08 (3n), except in conformity with a comprehensive local setback ordinance, generally applicable to the vicinity of the land division, that expressly establishes a closer setback line. Trans 233.11(3)(d)(d) Allow in setback – removal does not affect viability. The department, district office or reviewing municipality may authorize the erection of a structure or improvement within a setback area only if the department, district office or reviewing municipality determines that any required removal of the structure or improvement, in whole or in part, will not affect the continuing viability or conforming use of the business, activity, or use associated with the proposed structure or improvement, and will not adversely affect the community in which it is located. Any owner or user who erects a structure or improvement under a special exception granted under this paragraph assumes the risk of future department-required removal of the structure or improvement and waives any right to compensation, relocation assistance or damages associated with the department’s acquisition of that land for a transportation improvement, including any damage to property outside the setback caused by removal of the structure or improvement in the setback that was allowed by special exception. The department, district office or reviewing municipality may not grant a special exception within an existing setback area, unless the owner executes an agreement or other appropriate document required by the department, binding on successors and assigns of the property, providing that, should the department need to acquire lands within the setback area, the department is not required to pay compensation, relocation costs or damages relating to any structure or improvement authorized by the special exception. The department, district office or reviewing municipality may require such conditions and safeguards as will, in its judgment, secure substantially the purposes of this chapter. The department, district office or reviewing municipality shall require the executed agreement or other appropriate document to be recorded with the register of deeds under sub. (7) as part of the special exception. Trans 233.11(3)(e)(e) Blanket or area special exceptions for setbacks. Based on its experience granting special exceptions on similar land divisions, similar structures or improvements, or the same area and development pattern, the department may grant blanket or area special exceptions from setback requirements of this chapter that are generally applicable. The department shall record blanket or area special exceptions with the register of deeds in the areas affected or shall provide public notice of the blanket or area special exceptions by other means that the department determines to be appropriate to inform the public. Trans 233.11(3)(f)(f) Horizon of setback analysis. For purposes of its specific analysis, the department, district office or reviewing municipality shall consider the period 20 years after the date of analysis. Trans 233.11 NoteNote: Federal law requires a minimum 20-year forecast period for transportation planning for all areas of the State. 23 USC 134 (g) (2)(A) and 135 (e) (1). Trans 233.11(4)(4) Special exceptions for provisions of this chapter other than setbacks. Except as provided in sub. (3), the department may not authorize special exceptions from this chapter, except in appropriate cases in which the literal application of this chapter would result in practical difficulty or unnecessary hardship, or would defeat an orderly overall development plan of a local unit of government. A special exception may not be contrary to the public interest and shall be in harmony with the general purposes and intent of ch. 236, Stats., and of this chapter. The department may require such conditions and safeguards as will, in its judgment, secure substantially the purposes of this chapter. Trans 233.11 NoteNote: This subsection uses the phrase “practical difficulty or unnecessary hardship to indicate a higher standard for special exceptions from provisions of this chapter other than setbacks. However, the phrase “special exception” has been used rather than the word “variance.” The Supreme Court defined “unnecessary hardship” in a variance context as an owner having “no reasonable use of the property without a variance.” See State v. Kenosha County Bd. of Adjust., 218 Wis. 2d 396, 413, 577 N.W.2d 813 (1998). The department intends the “special exception” provision in this rule to be administered in a somewhat less restrictive fashion than “no reasonable use of the property” without a “variance.” Trans 233.11(5)(5) Municipal special exceptions. A delegation agreement under s. Trans 233.03 (8) may authorize a reviewing municipality to grant special exceptions. No municipality may grant special exceptions to any requirement of this chapter, except in conformity with a delegation agreement under this subsection. Any decision of a reviewing municipality relating to a special exception is subject to the appeal procedure applicable to such decisions made by the department or a district office, except that the department may unilaterally review any such decision of a reviewing municipality only for the purposes of ensuring conformity with the delegation agreement and this chapter. Trans 233.11(6)(6) Time limit for review. Not more than 60 calendar days after receiving a completed request for a special exception under s. Trans 233.11, the department, district office or reviewing municipality shall provide to the land divider written notice of its decision granting or denying a special exception. The 60-day time limit may be extended only by written consent of the land divider. Trans 233.11 NoteNote: The Department intends that decisions concerning special exceptions be made in the shortest practicable period of time. The Department intends the 60-day time limit applicable to special exceptions to allow sufficient time for a land divider and the Department, district office or municipality to explore alternative locations or plans to avoid and minimize conflicts and to facilitate mutually acceptable resolutions to conflicts.