SPS 302.34(1)(1) Uniform building permit seal. A fee of $30.00 shall be remitted to the department at the time of application for a Wisconsin Uniform Building Permit Seal. Municipalities or UDC inspection agencies administering the Uniform Dwelling Code shall purchase one $30.00 permit seal for each new dwelling. SPS 302.34(2)(2) Departmental inspections. Where an employee of the department performs an on-site inspection related to the enforcement of the Uniform Dwelling Code as a result of a consumer complaint or a request by an individual in a municipality where permits are not issued and inspections are not performed, a fee may be assessed to the individual requesting the inspection determined in accordance with s. SPS 302.04 (2), with a minimum fee of $160.00 per inspection, payable in advance to the department. SPS 302.34(3)(3) Multifamily dwellings. Fees related to plan examination and field inspections for multifamily dwellings shall be determined in accordance with s. SPS 302.31. SPS 302.34(4)(a)(a) Except as provided in pars. (b) and (c), where employees of the department perform plan reviews, plant evaluations, consumer complaint investigations or any other type of enforcement-related activity for modular homes, the manufacturer shall be assessed at the rates determined in accordance with s. SPS 302.04. SPS 302.34(4)(c)(c) The minimum fee for inspections shall be $160.00 per inspection. SPS 302.34(5)(a)(a) Fees related to plan examination and field inspections for manufactured multifamily dwellings shall be determined in accordance with s. SPS 302.31. SPS 302.34(5)(b)(b) Fees related to in-plant inspections for manufactured multifamily dwellings performed by the department shall be assessed and determined in accordance with s. SPS 302.04 (2). SPS 302.34(6)(6) Wisconsin insignias. Fees for Wisconsin insignias shall be assessed and computed on the basis of $25.00 for each dwelling unit or camping unit. SPS 302.34(7)(7) Miscellaneous fees. When the department provides goods or services not specifically covered by the fees in subs. (1) to (6), fees may be charged to persons or organizations requesting the goods and services based upon actual cost. SPS 302.35(1)(1) General. Fees for all permits issued and inspection services provided under s. SPS 316.011 (2) (a) shall be determined in accordance with this section. SPS 302.35(2)(a)(a) Except as provided under sub. (3), the permit and inspection fee for an electrical wiring installation described under s. SPS 316.012 (1) (a) or (b) shall be the greater of the sum of the fees determined in accordance with Table 302.35 or $160. SPS 302.35(2)(b)(b) The fee under par. (a) includes the fees for a minimum of one rough-in inspection and one final inspection. SPS 302.35(2)(c)(c) Any of the fees under Table 302.35 may, at the discretion of the department, be doubled for projects where the installation, erection, or construction of an installation component is initiated without the required permit. Table 302.35
Commercial Electrical System Permit and Inspection Fees
SPS 302.35(3)(3) Inspection agency permit and inspection fee. The permit and inspection fee assessed by an inspection agency for an electrical wiring installation described under s. SPS 316.012 (1) (a) or (b) may be determined by contract between the inspection agency and the department. In this subsection, “inspection agency” means an inspection agency registered under s. SPS 305.629. SPS 302.35(4)(4) Plan review fee. A fee of $160 shall be assessed for each electrical system plan review that is required or is requested by the permit applicant. SPS 302.35(5)(5) Reinspection fee. A fee of $160 shall be assessed for a department reinspection conducted to gain compliance after an order has been issued by the department. SPS 302.35(6)(a)(a) The department may refund all or a portion of a fee assessed under sub. (2) for a project if installation of the electrical wiring has not commenced within 12 months after the date the permit is issued. SPS 302.35(6)(b)(b) The permit holder may request from the department a refund of a fee assessed under sub. (2) for a component that at the conclusion of the project has not been installed. SPS 302.35(7)(7) Fee for an incomplete or incorrect permit. An additional fee of $80 may be assessed if a permit application is submitted with incomplete or incorrect information. SPS 302.35 HistoryHistory: Cr. Register, June, 1992, No. 438, eff. 7-1-92; renum. (4) to (7) to be (5) to (8), cr. (4), Register, March, 1995, No. 471, eff. 4-1-95; CR 00-159: am. (1), r. and recr. (2), r. (3), Register September 2001 No. 549 eff. 12-1-01; CR 05-038: am. (3) and (5) Register October 2005 No. 598, eff. 11-1-05; CR 08-039: am. (1), (2), (4) (title), (a) and (c) Register November 2008 No. 635, eff. 12-1-08; correction in (2), (3), (4) (a), (5) (a), (b) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; EmR1703: emerg. am. (6), eff. 2-6-17; CR 17-017: am. (title), (6) Register March 2018 No. 747, eff. 4-1-18; CR 19-099: cr. Register June 2020 No. 774, eff. 7-1-20. Subch. IV of ch. SPS 302 NoteNote: Section SPS 302.43 was renumbered s. ATCP 93.1605 under s. 13.92 (4) 1., Stats. under authority of 2013 Wis. Act 20, section 9138 (3) (fm) and (4) (f). SPS 302.44SPS 302.44 Gas system equipment. Fees for examination of plans and site inspections under ch. SPS 340 for the storage or vehicle-fuel dispensing of liquefied petroleum gas, liquefied natural gas, compressed natural gas, gaseous hydrogen or liquefied hydrogen shall be determined in accordance with Table 302.44. SPS 302.51(1)(1) The fee for department review of an application for the approval of a material, equipment or product, other than a plumbing product, or for approval of an alternate standard, shall be determined in accordance with Table 302.51. SPS 302.51(2)(2) The fee for a special inspection of an installation of a material, equipment or product for which an experimental approval has been issued in accordance with s. SPS 320.18 or 361.50 shall be determined in accordance with s. SPS 302.04 (2). SPS 302.51 HistoryHistory: Cr. Register, June, 1992, No. 438, eff. 7-1-92; am. Register, July, 2000, No. 535, eff. 9-1-00; CR 01-139: am. (2) Register June 2002 No. 558, eff. 7-1-02; CR 05-038: am. Table 2.51 Register October 2005 No. 598, eff. 11-1-05; CR 08-039: am. (2) and Table 2.51 Register November 2008 No. 635, eff. 12-1-08; correction in (1), (2), Table 302.51 made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672. SPS 302.52(1)(1) General. The department shall consider and may grant a variance from an administrative rule upon receipt of a fee, a completed petition for variance form from the owner, and a position statement from the fire department where applicable, provided an equivalency is established which meets the intent of the rule being petitioned. SPS 302.52(2)(2) Petitions for variance on rules under chs. SPS 320 to 325, uniform dwelling code, and ch. SPS 327, camping units. The fee for reviewing petitions for variance on rules under chs. SPS 320 to 325, and 327 shall be $175.00 per petition. SPS 302.52(3)(3) Petitions for variance on rules under chs. SPS 361 to 366, commercial building code. SPS 302.52(3)(a)(a) Except as provided under sub. (4), the fee for reviewing petitions for variance on rules under chs. SPS 361 to 366 shall be $550.00 per petition. SPS 302.52(3)(b)(b) Except as provided in par. (d), a separate petition shall be submitted for each building, even if the buildings are similar. If, after review, it is determined that some or all of the petitions may be processed using a precedent, a portion of the variance fee may be refunded in accordance with sub. (10) (b). SPS 302.52(3)(c)(c) Where identical petitions are submitted for identical buildings with a common owner on a single piece of property, the fee for the first building shall be $550.00 and the fee for each subsequent building shall be submitted in accordance with sub. (10) (b) for precedent petitions. SPS 302.52(3)(d)(d) Where an identical variance is sought for identical buildings with a common owner in a single municipality, and all of the buildings are listed on one submitted petition, the fee for the first building shall be $550.00, and the fee for each subsequent building shall be $50. SPS 302.52(4)(4) Petitions for variance on historic buildings. The fee for reviewing petitions for variance on rules for historic buildings shall be $300.00 per petition. SPS 302.52(5)(5) Petitions for variance on rules under chs. SPS 381 to 387, uniform plumbing code. The fee per petition for processing petitions for variance to rules under chs. SPS 381 to 387 shall be $300.00. SPS 302.52(6)(6) Petitions for variance under s. 101.055 (4), stats. The fee for reviewing petitions for temporary, experimental and permanent variances under s. 101.055 (4), Stats., shall be $300.00 per petition. SPS 302.52(7)(7) Petitions for variance, other rules. Except as provided in ch. SPS 305, the fee for reviewing petitions for variance on rules of the department, administered by the division of industry services and not specifically mentioned under this section, shall be $300.00 per petition. SPS 302.52(8)(a)(a) Upon request, the department will process petitions for variance on a priority basis. Except as specified in par. (b), the fees for processing these petitions shall be double the amounts specified in subs. (2), (3), (5) to (7) and (9). SPS 302.52(8)(b)(b) The fees for processing petitions for variance on rules for historic buildings, pursuant to s. 101.121 (3) (b), Stats., shall be as specified in sub. (4). SPS 302.52(9)(a)(a) Statements or conditions in a petition for variance may be revised within one year of the date of the written decision. The fee per petition for revisions to previously determined petitions for variance shall be as follows: SPS 302.52(9)(b)(b) For revisions requested after one year from the date of the written decision, a new petition for variance shall be submitted. SPS 302.52(10)(a)(a) For complex petitions for variance which require more than 8 hours to review and process, an additional fee may be charged at the rate of $80.00 per hour for each hour in excess of 8 hours. For precedent petitions for variance which require more than 3 hours to review and process, an additional fee may be charged at the rate of $80.00 per hour for each hour in excess of 3 hours. SPS 302.52(10)(b)(b) For petitions processed under sub. (3) or (4), a refund may be returned. The minimum fee per petition charged by the department shall be based on the following schedule: SPS 302.52(10)(b)1.1. The minimum fee for a petition for variance that is returned without decision before assignment for staff review shall be 25% of the required fee. SPS 302.52(10)(b)2.2. The minimum fee for a petition for variance that is returned without decision after staff review shall be 25% of the required fee plus $80.00 per hour of review and processing time. SPS 302.52(10)(b)3.3. The minimum fee for a non-priority petition for variance based on precedence shall be 50% of the required fee. SPS 302.52(10)(b)4.4. The minimum fee for a priority petition for variance based on precedence shall be 75% of the required fee. SPS 302.52 HistoryHistory: Cr. Register, June, 1992, No. 438, eff. 7-1-92; emerg. cr. (6m), eff. 10-1-93; cr. (6m), Register, March, 1994, No. 459, eff. 4-1-94; am. (3) (a), Register, March, 1995, No. 471, eff. 4-1-95; correction in (2) made under s. 13.93 (2m) (b) 7., Stats., Register, November, 1999, No. 527; r. and recr. (5), Register, April, 2000, No. 532, eff. 7-1-00; am. (3) (a), (c), (6), (7), (10) (a) and (b) 2., r. (6m), Register, July, 2000, No. 535, eff. 9-1-00; am. (3) (b), cr. (3) (d), Register, September, 2000, No. 537, eff. 10-1-00; CR 01-139: am. (3) (a) Register June 2002 No. 558, eff. 7-1-02; CR 05-038: am. (3) (d), (5) and (7) Register October 2005 No. 598, eff. 11-1-05; CR 06-120: am. (3) (title) and (a), (4) and (8) (b), Register February 2008 No. 626, eff. 3-1-08; CR 08-039: am. (2), (3) (a), (c), (d), (5), (7), (10) (a), (b) 2. Register November 2008 No. 635, eff. 12-1-08; CR 10-103: am. (3) (title) and (a) Register August 2011 No. 668, eff. 9-1-11; correction in (2), (3) (title), (a), (5), (7) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; correction in (7) made under s. 13.92 (4) (b) 6., Stats., Register October 2013 No. 694; EmR1703: emerg. am. (2), eff. 2-6-17; CR 17-017: am. (2) Register March 2018 No. 747, eff. 4-1-18; correction in (2) made under s. 35.17, Stats., Register March 2018 No. 747; CR 18-056: am. (2) Register November 2018 No. 755, eff. 12-1-18. SPS 302.61SPS 302.61 Miscellaneous inspections, reviews and services. SPS 302.61(1)(a)(a) The fees for plumbing inspections for sanitary districts or other special purpose districts shall be determined in accordance with s. SPS 302.04 (2). SPS 302.61(1)(b)(b) The department may assess a fee determined in accordance with s. SPS 302.04 (2) for a field inspection for a department representative to conduct a soil evaluation. SPS 302.61(2)(2) Revisions. The fee for revisions to previously approved plumbing and private sewage plans shall be $85.00 for the first hour and $80.00 per hour thereafter per plan. This fee shall apply when plans are revised for reasons other than those which were requested by the department. SPS 302.61(3)(3) Miscellaneous services. When the department provides goods or services not specifically covered in this section, fees may be charged to organizations requesting such goods and services. SPS 302.61 HistoryHistory: Cr. Register, June, 1992, No. 438, eff. 7-1-92; r. and recr. (3), Register, April, 2000, No. 532, eff. 7-1-00; am. (1) and (2), Register, July, 2000, No. 535, eff. 9-1-00; CR 05-038: am. (1) (a), r. (3) and (4) Register October 2005 No. 598, eff. 11-1-05; CR 08-039: am. (2), renum. (5) to be (3) Register November 2008 No. 635, eff. 12-1-08; correction in (1) (a), (b) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 23-006: am. (2) Register September 2023 No. 813, eff. 10-1-23. SPS 302.635SPS 302.635 Lot restriction waivers. The fee for any lot restriction waiver issued by the department shall be $100.00 per lot. SPS 302.635 HistoryHistory: Cr. Register, July, 2000, No. 535, eff. 9-1-00; CR 08-039: am. Register November 2008 No. 635, eff. 12-1-08. SPS 302.64(1)(1) General. Plan examination fees for preliminary or complete plans shall accompany the plans and specifications when submitted. If the department determines, upon review of the plans, that inadequate fees were provided, the necessary additional fees shall be provided prior to departmental approval. SPS 302.64(2)(2) Examination fees. The plan examination fee shall be determined in accordance with Table 302.64-1. The minimum fee shall be $85.00 per plan. SPS 302.64 Note* For table entries 5. to 11., no additional fee would be required if submitted with the respective drain and vent system.
SPS 302.64 Note** This fee is in addition to building stormwater and clearwater plumbing systems.
SPS 302.64(3)(3) Examination fees for additions and remodeling. When new or relocated fixtures or both are connected to the existing piping inside a building, the fee shall be determined in accordance with the following procedures: SPS 302.64(3)(a)1.1. Total all of the drainage fixture units which are being added or relocated. SPS 302.64(3)(a)2.2. Refer to s. SPS 382.30 Table 382.30-2, and determine the horizontal drain size which would be required if all new or relocated fixtures discharged through one pipe. SPS 302.64 NoteNote: Disregard the asterisk limitation regarding water closets. This pipe size is used for determining the fee only and does not necessarily mean this pipe size is used in actual design or installation.
/exec_review/admin_code/sps/safety_and_buildings_and_environment/301_319/302
true
administrativecode
/exec_review/admin_code/sps/safety_and_buildings_and_environment/301_319/302/iv
Department of Safety and Professional Services (SPS)
Chs. SPS 301-399 ; Safety, Buildings, and Environment
administrativecode/subch. IV of ch. SPS 302
administrativecode/subch. IV of ch. SPS 302
section
true