Chapter PSC 118
RENEWABLE RESOURCE CREDIT TRACKING PROGRAM
PSC 118.025 Renewable resource designation. PSC 118.03 Facilities eligible for the minimum percentage requirement and for creating renewable resource credits. PSC 118.04 Creation and transfer of renewable energy certificates and renewable resource credits. PSC 118.05 Certification of renewable facilities. PSC 118.055 Certification of displacement facilities. PSC 118.06 Renewable energy tracking system program administrator. PSC 118.07 Aggregation and allocation by wholesale suppliers. PSC 118.08 Double-counting prohibited. PSC 118.09 Calculation of displaced conventional electricity. Ch. PSC 118 NoteNote: Chapter PSC 118 was created as an emergency rule effective April 7, 2001. PSC 118.01(1)(1) This chapter applies to each Wisconsin electric provider that is subject to s. 196.378 (2) (a), Stats., and to any member or customer of an electric provider. PSC 118.01(2)(2) The commission may consider exceptional or unusual situations and may, by order, apply different requirements to an individual facility than those provided in this chapter. PSC 118.01(3)(3) This chapter should be construed liberally in favor of the creation of RRCs. PSC 118.01 HistoryHistory: CR 00-065: cr. Register July 2001, No. 547 eff. 8-1-00; CR 06-112: am. Register May 2007 No. 617, eff. 6-1-07; CR 10-147: renum. 118.01 to be 118.01 (1) and am., cr. (2) Register March 2012 No. 675, eff. 4-1-12; CR 13-040: am. (1), cr. (3) Register April 2014 No. 700, eff. 5-1-14. PSC 118.02PSC 118.02 Definitions. The definitions specified in s. 196.378, Stats., apply to this chapter. In addition, in this chapter: PSC 118.02(1e)(1e) “Biogas” means a gas created by the anaerobic digestion or fermentation of biomass, food processing waste or discarded food. PSC 118.02(1m)(1m) “Certified displacement facility” means a displacement facility that the commission certifies under s. PSC 118.055. PSC 118.02(1s)(1s) “Certified renewable facility” means an electric generating facility that the commission certifies under s. PSC 118.05. PSC 118.02(2)(2) “Compliance period” means a calendar year, beginning January 1, during which an electric provider is required to achieve a renewable energy percentage under s. 196.378 (2) (a), Stats. PSC 118.02(3)(3) “Commission” means the public service commission. PSC 118.02(3m)(3m) “Densified fuel pellets” means pellets made from waste material that does not include garbage, as defined in s. 289.01 (9), Stats., and that contains no more than 30 percent fixed carbon. PSC 118.02(4)(4) “Designated representative” means the person authorized by the electric provider to register a renewable facility or non-electric facility with the program administrator, or to purchase or sell renewable energy certificates or RRCs. PSC 118.02(5)(5) “Displaced conventional electricity” means electricity derived from conventional resources that an electric provider, or a customer or member of the electric provider, would have used except that the person used instead a certified displacement facility. PSC 118.02(5g)(5g) “Displacement facility” means any of the following when used by an electric provider, or by a customer or member of the electric provider: PSC 118.02(5g)(d)(d) An installation generating thermal output from biomass, biogas, synthetic gas, densified fuel pellets, or fuel produced by pyrolysis. PSC 118.02(5g)(dm)(dm) An installation that recovers heat that is a byproduct of a manufacturing process. PSC 118.02(5m)(5m) “Division administrator” means the administrator of the commission’s division responsible for energy regulation. PSC 118.02(6r)(6r) “Plasma gasification” means the process of using an electric arc gasifier at a high temperature to break down waste material into gases and solids. PSC 118.02(7)(7) “Program administrator” means the person who carries out the administrative responsibilities related to the renewable energy tracking system. PSC 118.02(7g)(7g) “Pyrolysis” means an industrial process that heats organic or waste material under pressure in an oxygen-starved environment to break the material down into gases, liquid and solid residues. PSC 118.02(7r)(7r) “Renewable energy certificate” means an electronic certificate representing one MWh of total renewable energy from a certified renewable facility that meets all of the following requirements: PSC 118.02(7r)(a)(a) The MWh is physically metered with the net generation measured at the certified renewable facility’s bus bar. PSC 118.02(7r)(b)(b) The MWh represents renewable energy that is delivered to a retail customer with the retail sale measured at the customer’s meter, ignoring the transmission and distribution losses between the bus bar and the customer’s meter. PSC 118.02(9)(9) “Renewable energy tracking system” means a program that tracks the selling, transferring, purchasing, and retiring of renewable energy certificates and RRCs under s. 196.378 (3) (a), Stats., and meets the criteria in s. PSC 118.06. PSC 118.02(10)(10) “Renewable resource credit” means either of the following: PSC 118.02(10)(b)(b) An electronic certificate representing one MWh of displaced conventional electricity, as calculated under s. PSC 118.09. PSC 118.02(11)(11) “Retail customer” means a customer that receives retail electricity in Wisconsin. PSC 118.02(14)(14) “Solar light pipe” means a device that concentrates and transmits sunlight through a roof to an interior space, employing highly-reflective material inside the device to focus and direct the maximum available sunlight to the interior space. PSC 118.02(15)(15) “Solar water heater” means a device that concentrates and collects solar radiation to heat water for domestic use, pool heating, space heating, or ventilation air heating. PSC 118.02(16)(16) “Synthetic gas” means gas created by plasma gasification or pyrolysis. PSC 118.02(17)(17) “Tracking system account” means the account that the program administrator maintains in order to track the creation, sale, transfer, purchase, and retirement of a renewable energy certificate or an RRC by a renewable energy tracking system participant. PSC 118.02 HistoryHistory: CR 00-065: cr. Register July 2001, No. 547 eff. 8-1-01; CR 06-112: r. (5) and (9), am. (7), (10) and (11), r. and recr. (13) Register May 2007 No. 617, eff. 6-1-07; CR 10-147: renum. (1) to be (1s) and am., cr. (1e), (1m), am. (2), cr. (3m), am. (4), cr. (5), (5m), am. (6), cr. (6g), (6r), am. (7), cr. (7g), (7r), (9), renum. (10) to be (10) (intro.) and am., cr. (10) (a), (b), renum. (12) to be (17) and am., r. (13), cr. (14) to (16) Register March 2012 No. 675, eff. 4-1-12; republished to insert text inadvertently excluded from (4) Register January 2014 No. 697; CR 13-040: am. (1m), (5), renum. (6g) (intro.) to (5g) (intro.) and am., renum. (6g) (a) to (e) to (5g) (a) to (e) Register April 2014 No. 700, eff. 5-1-14; correction in (17) made under s. 35.17, Stats., Register April 2014 No. 700; CR 14-053: am. (17) Register April 2015 No. 712, eff. 5-1-15; CR 20-083: cr. (5g) (dm) Register October 2021 No. 790, eff. 11-1-21. PSC 118.025 HistoryHistory: CR 10-147: cr. Register March 2012 No. 675, eff. 4-1-12. PSC 118.03PSC 118.03 Facilities eligible for the minimum percentage requirement and for creating renewable resource credits. PSC 118.03(1)(1) An electric provider may use the output of a renewable facility to meet a minimum percentage requirement under s. 196.378 (2) (a), Stats., or to create an RRC for renewable energy only if the renewable facility that is the source of the electric provider’s renewable energy meets all of the following requirements: PSC 118.03(1)(a)(a) The energy output of the renewable facility is physically metered and the accuracy of the metering is subject to verification by the program administrator or the commission. PSC 118.03(1)(c)(c) The renewable facility is owned or operated by the electric provider, which sells the renewable energy to its retail customers or members, or the renewable facility supplies or allocates its energy under an executed wholesale purchase contract to the electric provider, which sells the renewable energy to its retail customers or members. PSC 118.03(2)(2) An electric provider or customer or member of an electric provider may create an RRC for conventional electricity displaced by the use of a displacement facility only if the displacement facility meets all of the following requirements: PSC 118.03(2)(c)(c) Will replace or reduce the use of an electric device or electric service used for the same purpose at the same location as the displacement facility. PSC 118.03(3)(a)(a) An electric provider may only use the renewable portion of the production from a facility using both a renewable and conventional fuel, based on the relative energy content of the fuels, to meet a minimum percentage requirement under s. 196.378 (2) (a), Stats. PSC 118.03(3)(b)(b) An electric provider or customer or member of an electric provider may only use the renewable portion of the production from a facility using both a renewable and conventional fuel, based on the relative energy content of the fuels, to create RRCs. PSC 118.03(3m)(3m) An electric provider or customer or member of an electric provider may use biogas or synthetic gas it creates under sub. (1) or (2), or may use biogas or synthetic gas provided by another entity under sub. (4). PSC 118.03(4)(a)(a) An electric provider may under par. (b) or a customer or member of an electric provider may under par. (c) use the production of a facility that has contracted with a producer of biogas or synthetic gas for ownership of the gas and that has sufficient contracts to deliver the gas to the facility, according to the resulting number of MWh that the facility generates or the amount of conventional electricity that the facility displaces. PSC 118.03(4)(b)(b) An electric provider may use the production of a facility that satisfies par. (a) to meet a minimum percentage requirement under s. 196.378 (2) (a), Stats., or to create an RRC if the electric provider demonstrates all of the following: PSC 118.03(4)(b)2.2. The gas producer measures the heat content of the gas at least monthly. PSC 118.03(4)(c)(c) A customer or member of an electric provider may use the production of a facility that satisfies par. (a) to create a RRC if the electric provider demonstrates all of the following:
/exec_review/admin_code/psc/118
true
administrativecode
/exec_review/admin_code/psc/118/02
Public Service Commission (PSC)
administrativecode/PSC 118.02
administrativecode/PSC 118.02
section
true