This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 811.10   Owner approval requirement.
NR 811.11   Resident project representative.
Subchapter II — Source Development — Groundwater
NR 811.12   Wells.
NR 811.13   Well filling and sealing.
NR 811.14   Special requirements for wells developed in unconsolidated formations.
NR 811.15   Special requirements for collector wells.
NR 811.16   Special requirements for dug wells and springs.
NR 811.17   Special requirements for infiltration lines.
NR 811.18   Special requirements for sandstone wells.
NR 811.19   Special requirements for limestone or dolomite wells.
NR 811.20   Special requirements for granite wells.
Subchapter III — Source Development — Surface Water
NR 811.21   General requirements.
NR 811.22   Intakes.
NR 811.23   Shore wells.
NR 811.231   Off-Stream raw water storage.
NR 811.232   Intake chemical treatment.
Subchapter IV — Pumping Stations, Pumphouses, and Water Treatment Plant Buildings
NR 811.24   General requirements.
NR 811.25   Buildings.
NR 811.26   Number of pumping units.
NR 811.27   Auxiliary power.
NR 811.28   Additional requirements.
Subchapter V — Pumping Equipment and Appurtenances
NR 811.29   Pumping capacity requirements.
NR 811.30   General pump, motor and wiring installation requirements.
NR 811.31   Line-shaft vertical turbine pumps.
NR 811.32   Submersible vertical turbine pumps.
NR 811.33   Motor protection.
NR 811.34   Pump variable output control devices.
NR 811.35   Pitless units.
NR 811.36   Well appurtenances.
NR 811.37   Pump discharge lines.
Subchapter VI — Chemical Addition
NR 811.38   General.
NR 811.39   Feed equipment.
NR 811.40   Storage and handling.
Subchapter VII — Treatment
NR 811.41   General treatment design.
NR 811.42   Treatment of water from surface water sources.
NR 811.43   Treatment of water from groundwater sources.
NR 811.44   Pilot testing.
NR 811.45   Aeration.
NR 811.46   Arsenic removal.
NR 811.47   Clarification.
NR 811.48   Chlorination.
NR 811.49   Filtration — gravity.
NR 811.495   Filtration — pressure.
NR 811.50   Filtration — membrane.
NR 811.51   Fluoridation.
NR 811.52   Iron and manganese control.
NR 811.53   Organics removal.
NR 811.54   Ozonation.
NR 811.55   Radionuclide removal.
NR 811.56   Sequestration.
NR 811.57   Softening.
NR 811.575   Anion exchange.
NR 811.58   Stabilization.
NR 811.59   Taste and odor control.
NR 811.60   Ultraviolet (UV) Light.
NR 811.605   Treatment for other contaminants.
Subchapter VIII — Hydro-Pneumatic Tanks
NR 811.61   General.
Subchapter IX — Storage Facilities
NR 811.62   Volume and pressure.
NR 811.63   Location.
NR 811.64   Construction details.
NR 811.65   Plant storage.
NR 811.66   Distribution system storage.
Subchapter X — Distribution Systems
NR 811.67   Applicability.
NR 811.68   Ownership of municipal water distribution systems.
NR 811.685   Interconnections with other water sources.
NR 811.69   Materials.
NR 811.70   Water main design.
NR 811.71   Hydrants.
NR 811.72   Air-relief facilities and valve and meter chambers.
NR 811.73   Installation of mains.
NR 811.74   Separation of water mains and sanitary or storm sewer mains.
NR 811.75   Separation of water mains and other contamination sources.
NR 811.76   Surface water crossings.
NR 811.77   Common casing crossings.
NR 811.78   Water loading stations.
Subchapter XI — Water Pressure Booster Stations
NR 811.79   General.
NR 811.80   Location.
NR 811.81   Pumps and pressures.
NR 811.82   Storage requirements.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.