This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 756.07(1)(c)3.c.c. Degree of contamination.
NR 756.07(1)(c)3.d.d. Cap complexity, including use of geosynthetics, armoring, and amendments.
NR 756.07(1)(c)3.e.e. Hydrologic and hydraulic characteristics.
NR 756.07(1)(c)3.f.f. Presence of outstanding resource waters or exceptional resource waters.
NR 756.07(1)(c)3.g.g. Design factor of safety.
NR 756.07(1)(c)3.h.h. Dissolved phase contaminants and chemical characteristics.
NR 756.07(1)(c)3.i.i. Fish advisories issued.
NR 756.07(1)(c)3.j.j. Navigation.
NR 756.07(1)(c)3.k.k. Drinking water sources.
NR 756.07(2)(2)Extensions and adjustments.
NR 756.07(2)(a)(a) Prior to submitting a new cost estimate under par. (b), the person required to submit proof shall request in writing that the department review the length of the plan and compliance schedule and the length of the proof period for each applicable financial responsibility requirement. The department shall respond within 60 days of the request and shall provide any extensions in writing.
NR 756.07(2)(b)(b) The person required to submit proof shall prepare and submit to the department a new cost estimate during the proof period at all of the following times:
NR 756.07(2)(b)1.1. Once every 5 years, unless the costs are revised within the 5-year period as required under subd. 2. The new cost estimate shall use current dollars.
NR 756.07(2)(b)2.2. When any change in site design or operation is approved by the department in writing.
NR 756.07(3)(3)Costs for engineering control maintenance. Cost estimates for engineering control maintenance shall include all of the following, as applicable:
NR 756.07(3)(a)(a) Sampling, surveying, and monitoring, including bathymetry survey, core sampling, pore water measurements, poling, surface water sampling, event-based monitoring, regular monitoring, and comparison with previous monitoring occurrences. For the purposes of preparing cost estimates, all regular monitoring requirements specified in the plan and compliance schedule shall apply over the entire proof period.
NR 756.07(3)(b)(b) Modeling, including transport modeling and conceptual site modeling.
NR 756.07(3)(c)(c) Chemical and physical analysis.
NR 756.07(3)(d)(d) Repair and replacement of engineering controls. The expected operating life of all engineering controls shall be specified in the plan and compliance schedule. As each of these features reach the end of their anticipated operating life, the cost of their replacement shall be added to the estimate for the appropriate year of the proof period.
NR 756.07(4)(4)Costs for site investigation and remediation following structural impediment removal. Costs estimates for inspection, the investigation of the extent of residual contamination, and performance of any necessary response actions that are needed following the removal of a structural impediment shall include all of the following, as applicable:
NR 756.07(4)(a)(a) Site investigation.
NR 756.07(4)(b)(b) Remedial action, including remedial action planning, design, and permitting. The length of time necessary to complete the remedial action to address the contamination shall be estimated and the cost of remedial actions for each year shall be presented.
NR 756.07(4)(c)(c) Full dredge including disposal.
NR 756.07(4)(d)(d) Annual monitoring and event monitoring.
NR 756.07(4)(e)(e) The expected life of any structural impediments, which shall be specified in the plan and compliance schedule, when practicable. As each structural impediment reaches the end of its anticipated life, the cost of the investigation and remediation following the removal of the structural impediment shall be added to the estimate for the appropriate year of the proof period. If the expected life of a structural impediment cannot be determined at the time of the plan and compliance schedule, the investigation and remediation following removal shall be planned to occur in the last year of the proof period and the costs shall be added to the estimate for the last year of the proof period.
NR 756.07 NoteNote: Under par. (e), the costs of inspection and response actions following a structural impediment removal may be based on the actual estimated date of inspection and response actions or based on a hypothetical date of inspection and response actions. The option for using a hypothetical date is intended to apply in situations when a person required to submit proof is unable to determine a removal date based on currently available data.
NR 756.07(5)(5)Additional costs of events and third-party actions. If an assessment of the vulnerability of any engineering controls and structural impediments to any events or third-party actions that may occur indicates that events or third-party actions may affect the protectiveness of the contaminated sediment engineering control and the attainment of the goals established in the plan and compliance schedule, cost estimates shall include damage, destruction, deterioration, and failure of any engineering controls and structural impediments following an event, including all of the following, as applicable:
NR 756.07(5)(a)(a) The costs of repair, replacement, or removal of any engineering controls used to address contaminated sediment.
NR 756.07(5)(b)(b) The costs of site investigation and remedial action plan and design, including permitting, following the removal of any structural impediment.
NR 756.07(5)(c)(c) Dredging and disposal of contaminated sediment in the area that may be affected by the unplanned event.
NR 756.07(5)(d)(d) The costs of post-event inspection, monitoring, maintenance, and repair.
NR 756.07(6)(6)Duplicative costs. The department shall not impose financial responsibility costs under sub. (5) that are duplicative of those required under subs. (3) and (4).
NR 756.07 NoteNote: For example, if financial assurance is required for the cost of replacement of an engineering control under sub. (3), then the costs of replacement of an engineering control may only be required under sub. (5) to the extent that additional funding would be needed due to the nature or timing of the event or third-party action.
NR 756.07(7)(7)Inflation rate. The rates of inflation applied to cost estimates approved by the department in previous years shall be derived from the most recent implicit price deflator for gross domestic product published by the U.S. department of commerce in its Survey of Current Business. The inflation rate is the result of dividing the latest published annual deflator by the deflator for the previous year. The projected rate of inflation to be applied in proof of financial responsibility calculations for all future years shall be equal to the rate of inflation for the last full calendar year.
NR 756.07 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21.
NR 756.08NR 756.08Calculating the amount of the proof of financial responsibility.
NR 756.08(1)(1)A person required to submit proof shall, as part of the initial request for approval of the plan and compliance schedule, calculate the necessary amounts of proof of financial responsibility based on the methods of providing proof of financial responsibility under s. NR 756.06 that have been chosen by the person required to submit proof.
NR 756.08(2)(2)For the planned costs under s. NR 756.04 (2) (b) 1. and 3., all of the following procedures for calculating the amount of proof of financial responsibility shall be used, as applicable:
NR 756.08(2)(a)(a) If proof of financial responsibility is submitted as escrow, trust or department accounts, the amount of proof of financial responsibility shall, at minimum, be equal to the sum of all estimated planned action expenditures for the entire proof period when the expenditure for each year has first been expressed in future dollars and then brought to present value using a discount rate based on future earnings. Future earnings shall be calculated based on a projected rate of return equal to the projected rate of inflation plus one percent, or the department may require that, when estimating future earnings on these accounts, the weighted average rate of return of the investments held in the account be used for a period of time not to exceed the weighted average maturity of the investments held in the account rounded to the nearest whole year. Earnings for years beyond the weighted average maturity of the investments in the account shall be calculated based on a projected rate of return equal to the projected rate of inflation plus one percent.
NR 756.08(2)(b)(b) If proof of financial responsibility is submitted as bonds, letters of credit, or insurance, the amount of proof of financial responsibility shall be equal to the sum of the costs in current dollars of performing the requirements for each year of the proof period.
NR 756.08(3)(3)For the additional costs under s. NR 756.04 (2) (b) 2. and 4., the amount of proof of financial responsibility shall be equal to the sum of the costs in current dollars for completion of the requirements.
NR 756.08 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21.
NR 756.09NR 756.09Changing methods of proof of financial responsibility. A person required to submit proof may change from one method authorized under s. NR 756.06 to another with written approval from the department, but not more than once per year. A change may only be made on the anniversary of the first submittal of proof of financial responsibility under s. NR 756.06, unless otherwise approved by the department. The amount of funds secured by the new method of providing proof of financial responsibility shall be in the amount that is equal to the amount that would have accumulated had the new method been used as the original method.
NR 756.09 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21.
NR 756.10NR 756.10Adjustment of financial responsibility.
NR 756.10(1)(1)A person required to submit proof shall submit to the department verification of the adjustment of the amount of funds secured by a method of proof of financial responsibility on a form supplied by the department.
NR 756.10(2)(2)The amounts of funds secured by methods of proof of financial responsibility shall be adjusted according to all of the following requirements:
NR 756.10(2)(a)(a) The amounts of funds for all proof methods shall be adjusted annually under s. NR 756.07 (7) to account for increases in cost estimates based on adjustments for inflation. The annual proof method adjustments shall be submitted to the department by December 31.
NR 756.10(2)(b)(b) Adjusted proof methods shall be submitted within 60 days after a new cost estimate submitted in accordance with s. NR 756.07 is approved by the department. The adjusted proof methods shall be in an amount adequate to cover the most recently approved cost estimate.
NR 756.10(3)(3)For a person using trust accounts, escrow accounts, or deposits with the department to meet the requirements of this chapter, revised proof of financial responsibility calculations shall be performed under s. NR 756.08 and submitted to the department by March 1 of the year succeeding the calendar year in which the weighted average annual rate of return of any trust or escrow account has fallen by one percent or more.
NR 756.10 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21; correction in (3) made under s. 35.17, Stats., Register September 2021 No. 789.
NR 756.11NR 756.11Access and default. If the department determines that a person required to submit proof is in violation of any of the requirements specified in the plan and compliance schedule or this chapter, the department and its designees may enter upon the site or facility and carry out the approved actions or plan and compliance schedule requirements. The department may use part or all of the funds deposited with it, or the funds deposited in escrow or trust accounts, or performance or forfeiture bonds, or letters of credit, insurance, or funds accumulated under other approved methods to carry out the approved actions or plan and compliance schedule requirements.
NR 756.11 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21.
NR 756.12NR 756.12Authorization to release funds.
NR 756.12(1)(1)Planned actions. Subject to sub. (3), for costs under s. NR 756.04 (2) (b) 1. and 3., one year after the issuance of the interim action, remedial action, or closure approval that is the subject of the financial responsibility requirement, and annually thereafter for the proof period, the person required to submit proof who has carried out all required actions and response actions under the approved plan and compliance schedule during the preceding year may apply to the department for reimbursement of funds from an escrow account, trust account, deposit with the department, or other approved methods, or for reduction of the bond, insurance, or letter of credit equal to the estimated costs for that year. The application shall be accompanied by an itemized list of costs incurred. Upon determination that the expenditures incurred are in accordance with the requirements anticipated in the approved plan and compliance schedule, the department may authorize in writing the release of the funds or approve a reduction in the bond, insurance, or letter of credit. Prior to authorizing a release of the funds or a reduction of the amount of funds secured by the bond, insurance, or letter of credit, the department shall determine that adequate funds exist to complete the required actions under the plan and compliance schedule for the remaining proof period. The department shall make determinations within 90 days after the application is received. For persons using escrow accounts, trust accounts, or deposits with the department, the department may authorize the release and return of up to 75 percent of the expected cost of planned actions for the current year. Any funds remaining in an escrow account, trust account, or on deposit with the department at the termination of the proof period shall be released to the person required to submit proof.
NR 756.12(2)(2)Events and third-party actions. Subject to sub. (3), for costs under s. NR 756.04 (2) (b) 2. and 4., when a person required to submit proof has completed all of the requirements under the plan and compliance schedule, the person required to submit proof may apply to the department for release of the bond, insurance, or the letter of credit or return of the money held on deposit, in escrow, or in trust. Upon determination by the department that requirements under the plan and compliance schedule have been fulfilled and financial responsibility for costs under s. NR 756.04 (2) (b) 2. and 4. is no longer necessary to protect human health and the environment, the department shall authorize in writing the release and return of all funds accumulated in such accounts or give written permission for cancellation of the bond, insurance, or letter of credit. The department shall make a determination within 90 days after the application is received.
NR 756.12(3)(3)Evaluation of proof period. Prior to submitting an application for the release of funds under sub. (1) or (2), the person required to submit financial assurances under s. NR 756.04 (1) shall request in writing that the department review the length of the plan and compliance schedule and the length of the proof period for each applicable financial responsibility requirement. The department shall respond within 60 days of the request and shall provide the length of any extension or reduction in writing.
NR 756.12 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21; correction in (1) made under s. 35.17, Stats., Register September 2021 No. 789.
NR 756.13NR 756.13Bankruptcy or receivership notification.
NR 756.13(1)(1)A person required to submit proof shall notify the department by certified mail of the commencement of a voluntary or involuntary proceeding under the bankruptcy code, 11 USC 101 to 1532, naming the person required to submit proof as debtor, within 10 days after commencement of the proceeding.
NR 756.13(2)(2)A person required to submit proof shall notify the department by certified mail of the commencement of a voluntary or involuntary proceeding within a state circuit court under ch. 128, Stats., naming the person required to submit proof as debtor, within 10 days after commencement of the proceeding.
NR 756.13 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21.
NR 756.14NR 756.14Compliance.
NR 756.14(1)(1)If a person required to submit proof fails to comply with any requirements in the approved plan and compliance schedule, the department may take any of the following actions:
NR 756.14(1)(a)(a) The department may require the forfeiture or conversion of any standard method of establishing proof of financial responsibility. All funds received from the forfeiture or conversion of any standard method of establishing proof of financial responsibility shall be credited to the department and managed specifically for the site in the same manner as a settlement to the environmental fund.
NR 756.14(1)(b)(b) The department may request the department of justice to initiate court action against the person required to submit proof to recover funds sufficient to pay the cost of complying with the plan and compliance schedule. Any funds recovered in an action under this paragraph or as a settlement in anticipation of an action under this paragraph shall be credited to the department and managed specifically for the site in the same manner as a settlement to the environmental fund.
NR 756.14(2)(2)If a person required to submit proof fails to comply with any requirements in the approved plan and compliance schedule, the department may take action or contract with a person to take action to comply with these requirements from funds obtained for that purpose under sub. (1) (a).
NR 756.14 HistoryHistory: EmR2032: emerg. cr., eff. 9-8-20; CR 20-038: cr. Register September 2021 No. 789, eff. 10-1-21.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.