NR 464.07(3)(3) Each owner or operator shall calculate HAP emissions on a kilogram per megagram of ODP basis and measure HAP emissions according to the appropriate procedures contained in 40 CFR 63.457, incorporated by reference in s. NR 484.03 (6). NR 464.07(4)(4) Each owner or operator shall determine the baseline HAP emissions for each equipment system and the total of all equipment systems in the clean condensate alternative affected source based on the following: NR 464.07(4)(a)(a) Process and air pollution control equipment installed and operating on December 17, 1993. NR 464.07(4)(b)(b) Compliance with the all following requirements that affect the level of HAP emissions from the clean condensate alternative affected source: NR 464.07(4)(b)3.3. All other applicable requirements of local, state or federal agencies or statutes. NR 464.07(5)(5) Each owner or operator shall determine the following HAP emission reductions from the baseline HAP emissions determined in sub. (4) for each equipment system and the total of all equipment systems in the clean condensate alternative affected source: NR 464.07(5)(b)(b) The HAP emissions reduction occurring by complying with the clean condensate alternative technology. NR 464.07(6)(6) For the purposes of all requirements in this section, each owner or operator may use as an alternative, individual equipment systems, instead of total of all equipment systems, within the clean condensate alternative affected source to determine emissions and reductions to demonstrate achievement of equal or greater than the reductions that would have been achieved by compliance with of s. NR 464.03 (1) (a) 2. to 5. NR 464.07(7)(7) The initial and updates to the control strategy report specified in s. NR 464.11 shall include to the extent possible the following information: NR 464.07(7)(a)1.1. The equipment systems and emission points that comprise the clean condensate alternative affected source. NR 464.07(7)(b)(b) Estimates and basis for the estimates of total HAP emissions and emissions reductions to fulfill the requirements subs. (4), (5) and (6). NR 464.07(8)(8) Each owner or operator shall report to the department by the applicable compliance date specified in s. NR 464.01 (1) (d), (e) or (f) the rationale, calculations, test procedures and data documentation used to demonstrate compliance with all the requirements of this section. NR 464.07 HistoryHistory: CR 00-175: cr. Register March 2002 No. 555, eff. 4-1-02. NR 464.08NR 464.08 Standards for enclosures and closed-vent systems. NR 464.08(2)(2) Each enclosure shall maintain negative pressure at each enclosure or hood opening as demonstrated by the procedures specified in 40 CFR 63.457(e), incorporated by reference in s. NR 484.03 (6). Each enclosure or hood opening closed during the initial performance test specified in 40 CFR 63.457(a) shall be maintained in the same closed and sealed position as during the performance test at all times except when necessary to use the opening for sampling, inspection, maintenance or repairs. NR 464.08(3)(3) Each component of the closed-vent system used to comply with ss. NR 464.03 (3), 464.04 (2) and 464.05 (2) that is operated at positive pressure and located prior to a control device shall be designed for and operated with no detectable leaks as indicated by an instrument reading of less than 500 parts per million by volume above background, as measured by the procedures specified in 40 CFR 63.457(d), incorporated by reference in s. NR 484.03 (6). NR 464.08(4)(4) Each bypass line in the closed-vent system that could divert vent streams containing HAP to the atmosphere without meeting the emission limitations in ss. NR 464.03 to 464.05 shall comply with either of the following requirements: NR 464.08(4)(a)(a) On each bypass line, the owner or operator shall install, calibrate, maintain and operate according to manufacturer’s specifications a flow indicator that provides a record of the presence of gas stream flow in the bypass line at least once every 15 minutes. The flow indicator shall be installed in the bypass line in such a way as to indicate flow in the bypass line. NR 464.08(4)(b)(b) For bypass line valves that are not computer controlled, the owner or operator shall maintain the bypass line valve in the closed position with a car seal or a seal placed on the valve or closure mechanism in such a way that valve or closure mechanism cannot be opened without breaking the seal. NR 464.08 HistoryHistory: CR 00-175: cr. Register March 2002 No. 555, eff. 4-1-02. NR 464.09(1)(1) Each owner or operator subject to the standards specified in s. NR 464.03 (3) and (4), 464.04 (2) and (3), 464.05 (2) and (3), 464.06 (3), (4) and (5), 464.07 (2) or 464.08 (4), shall install, calibrate, certify, operate and maintain according to the manufacturer’s specifications, a continuous monitoring system (CMS), as defined in s. NR 460.02 (12), as specified in subs. (2) to (13), except as allowed in sub. (13). The CMS shall include a continuous recorder. NR 464.09(2)(2) A CMS shall be operated to measure the temperature in the firebox or in the ductwork immediately downstream of the firebox and before any substantial heat exchange occurs for each thermal oxidizer used to comply with the requirements of s. NR 464.03 (4) (a) to (c). Owners and operators complying with the HAP concentration requirements in s. NR 464.03 (4) (b) may install a CMS to monitor the thermal oxidizer outlet total HAP or methanol concentration, as an alternative to monitoring thermal oxidizer operating temperature. NR 464.09(3)(3) A CMS shall be operated to measure all the following parameters for each gas scrubber used to comply with the bleaching system requirements of s. NR 464.05 (3) or the sulfite pulping system requirements of s. NR 464.04 (3): NR 464.09(3)(a)(a) The pH or the oxidation/reduction potential of the gas scrubber effluent. NR 464.09(4)(4) As an option to the requirements specified in sub. (3), a CMS shall be operated to measure the chlorine outlet concentration of each gas scrubber used to comply with the bleaching system outlet concentration requirement specified in s. NR 464.05 (3) (b). NR 464.09(5)(5) The owner or operator of a bleaching system complying with 40 CFR 430.24 shall monitor the chlorine and hypochlorite application rates, in kg of bleaching agent per megagram of ODP, of the bleaching system during the extended compliance period specified in s. NR 464.01 (1) (e). NR 464.09(6)(6) A CMS shall be operated to measure the gas scrubber parameters specified in sub. (3) (a) to (c) or those site specific parameters determined according to the procedures specified in sub. (14) to comply with the sulfite pulping system requirements specified in s. NR 464.04 (3). NR 464.09(7)(7) A CMS shall be operated to measure all the following parameters for each steam stripper used to comply with the treatment requirements in s. NR 464.06 (5) (c), (d) or (e): NR 464.09(8)(8) As an option to the requirements specified in sub. (7), a CMS shall be operated to measure the methanol outlet concentration to comply with the steam stripper outlet concentration requirement specified in s. NR 464.06 (5) (d) or (e). NR 464.09(9)(9) A CMS shall be operated to measure the appropriate parameters determined according to the procedures specified in sub. (14) to comply with the condensate applicability requirements specified in s. NR 464.06 (3). NR 464.09(10)(10) Each owner or operator using an open biological treatment system to comply with s. NR 464.06 (5) (b) shall perform the monitoring procedures specified in either pars. (a) and (b) or par. (c) and shall conduct a performance test each quarter using the procedures specified in par. (d): NR 464.09(10)(a)(a) On a daily basis, monitor all the following parameters for each biological treatment unit: NR 464.09(10)(a)1.1. Composite daily sample of outlet soluble BOD5 concentration to monitor for maximum daily and maximum monthly average. NR 464.09(10)(b)(b) If the Inlet and Outlet Concentration Measurements procedure (Procedure 3) in Appendix C of 40 CFR part 63, incorporated by reference in s. NR 484.04 (25g), is used to determine the fraction of HAP compounds degraded in the biological treatment system as specified in 40 CFR 63.457(l), carry out the sampling and archival requirements specified in subds. 1. and 2.: NR 464.09(10)(b)1.1. Obtain daily inlet and outlet liquid grab samples from each biological treatment unit to have HAP data available to perform quarterly performance tests specified in par. (d) and the compliance tests specified in sub. (16). NR 464.09(10)(b)2.2. Store the samples as specified in 40 CFR 63.457(n) until after the results of the soluble BOD5 test required in par. (a) 1. are obtained. The storage requirement is needed since the soluble BOD5 test requires 5 days or more to obtain results. If the results of the soluble BOD5 test are outside of the range established during the initial performance test, then the archive sample shall be used to perform the mass removal or percent reduction determinations. NR 464.09(10)(c)(c) As an alternative to the monitoring requirements of pars. (a) and (b), conduct daily monitoring of the site-specific parameters established according to the procedures specified in sub. (14). NR 464.09(10)(d)2.2. The remaining quarterly performance tests shall be performed as specified in subd. 1. except owners or operators may use the applicable methanol procedure in 40 CFR 63.457(l)(1) or (2) and the value of r determined during the first quarter test instead of measuring the additional HAP to determine a new value of r. NR 464.09(11)(a)(a) For each enclosure opening, a visual inspection of the closure mechanism specified in s. NR 464.08 (2) shall be performed at least once every 30 days to ensure the opening is maintained in the closed position and sealed. NR 464.09(11)(b)(b) Each closed-vent system required by s. NR 464.08 (1) shall be visually inspected every 30 days and at other times as requested by the department. The visual inspection shall include inspection of ductwork, piping, enclosures and connections to covers for visible evidence of defects. NR 464.09(11)(c)(c) For positive pressure closed-vent systems or portions of closed-vent systems, demonstrate no detectable leaks as specified in s. NR 464.08 (3), measured initially and annually by the procedures in 40 CFR 63.457(d), incorporated by reference in s. NR 484.03 (6). NR 464.09(11)(e)(e) The valve or closure mechanism specified in s. NR 464.08 (4) (b) shall be inspected at least once every 30 days to ensure that the valve is maintained in the closed position and the emission point gas stream is not diverted through the bypass line. NR 464.09(11)(f)(f) If an inspection required by pars. (a) to (e) identifies visible defects in ductwork, piping, enclosures or connections to covers required by s. NR 464.08, or if an instrument reading of 500 parts per million by volume or greater above background is measured, or if enclosure openings are not maintained at negative pressure, then the following corrective actions shall be taken as soon as practicable: NR 464.09(11)(f)1.1. A first effort to repair or correct the closed-vent system shall be made as soon as practicable but no later than 5 calendar days after the problem is identified. NR 464.09(11)(f)2.2. The repair or corrective action shall be completed no later than 15 calendar days after the problem is identified. Delay of repair or corrective action is allowed if the repair or corrective action is technically infeasible without a process unit shutdown or if the owner or operator determines that the emissions resulting from immediate repair would be greater than the emission likely to result from delay. Repair of the equipment shall be completed by the end of the next process shutdown. NR 464.09(12)(12) Each pulping process condensate closed collection system used to comply with s. NR 464.06 (4) shall comply with the requirements of pars. (a) to (c): NR 464.09(12)(a)(a) Each pulping process condensate closed collection system shall be visually inspected every 30 days and shall comply with the inspection and monitoring requirements specified in 40 CFR 63.964 of subpart RR, except: NR 464.09(12)(c)(c) If an inspection required by this section identifies visible defects in the closed collection system, or if an instrument reading of 500 ppm or greater above background is measured, then corrective actions specified in 40 CFR 63.964(b) of subpart RR shall be taken. NR 464.09(13)(13) Each owner or operator using a control device, technique or an alternative parameter other than those specified in subs. (2) to (12) shall install a CMS and establish appropriate operating parameters to be monitored that demonstrate, to the administrator’s satisfaction, continuous compliance with the applicable control requirements. NR 464.09 NoteNote: Under 40 CFR 458(b)(2), implementation of sub. (13) requires approval by EPA. NR 464.09(14)(14) To establish or reestablish the value for each operating parameter required to be monitored under subs. (2) to (10), (12) and (13) or to establish appropriate parameters for subs. (6), (9), (10) (c) and (13), each owner or operator shall use the following procedures: NR 464.09(14)(a)(a) During the initial performance test required in 40 CFR 63.457(a), incorporated by reference in s. NR 484.03 (6), or any subsequent performance test, continuously record the operating parameter. NR 464.09(14)(b)(b) Determinations shall be based on the control performance and parameter data monitored during the performance test, supplemented if necessary by engineering assessments and the manufacturer’s recommendations. NR 464.09(14)(c)(c) The owner or operator shall provide for the department’s approval the rationale for selecting the monitoring parameters necessary to comply with subs. (6) and (9) and shall provide for the administrator’s approval the rationale for selecting the monitoring parameters necessary to comply with sub. (13). NR 464.09(14)(d)(d) Provide for the department’s approval the rationale for the selected operating parameter value, and monitoring frequency, and averaging time. Include all data and calculations used to develop the value and a description of why the value, monitoring frequency and averaging time demonstrate continuous compliance with the applicable emission standard. NR 464.09(15)(15) Each owner or operator of a control device subject to the monitoring provisions of this section shall operate the control device in a manner consistent with the minimum or maximum, as appropriate, operating parameter value or procedure required to be monitored under subs. (1) to (14) and established under this chapter. Except as provided in sub. (16), s. NR 464.03 (5) or 464.06 (7), operation of the control device below minimum operating parameter values or above maximum operating parameter values established under this chapter or failure to perform procedures required by this chapter shall constitute a violation of the applicable emission standard of this chapter and be reported as a period of excess emissions. NR 464.09(16)(16) The procedures of this paragraph apply to each owner or operator of an open biological treatment system complying with sub. (10) whenever a monitoring parameter excursion occurs, and the owner or operator chooses to conduct a performance test to demonstrate compliance with the applicable emission limit. A monitoring parameter excursion occurs whenever the monitoring parameters specified in sub. (10) (a) 1. to 3. or any of the monitoring parameters specified in sub. (10) (c) are below minimum operating parameter values or above maximum operating parameter values established in sub. (14). NR 464.09(16)(a)(a) As soon as practical after the beginning of the monitoring parameter excursion, the following requirements shall be met: NR 464.09(16)(a)1.1. Before the steps in subd. 2. or 3. are performed, all sampling and measurements necessary to meet the requirements in par. (b) shall be conducted. NR 464.09(16)(a)2.2. Steps shall be taken to repair or adjust the operation of the process to end the parameter excursion period. NR 464.09(16)(a)3.3. Steps shall be taken to minimize total HAP emissions to the atmosphere during the parameter excursion period. NR 464.09(16)(b)(b) A parameter excursion is not a violation of the applicable emission standard if the results of the performance test conducted using the procedures in this paragraph demonstrate compliance with the applicable emission limit in s. NR 464.06 (5) (b). NR 464.09(16)(b)1.1. Conduct a performance test as specified in 40 CFR 63.457 using the monitoring data specified in sub. (10) (a) to (c) that coincides with the time of the parameter excursion. No maintenance or changes shall be made to the open biological treatment system after the beginning of a parameter excursion that would influence the results of the performance test. NR 464.09(16)(b)2.2. If the results of the performance test specified in subd. 1. demonstrate compliance with the applicable emission limit in s. NR 464.06 (5) (b), then the parameter excursion is not a violation of the applicable emission limit. NR 464.09(16)(b)3.3. If the results of the performance test specified in subd. 1. do not demonstrate compliance with the applicable emission limit in s. NR 464.06 (5) (b) because the total HAP mass entering the open biological treatment system is below the level needed to demonstrate compliance with the applicable emission limit in s. NR 464.06 (5) (b), then the owner or operator shall perform the following comparisons:
/exec_review/admin_code/nr/400/464
true
administrativecode
/exec_review/admin_code/nr/400/464/09/2
Department of Natural Resources (NR)
Chs. NR 400-499; Environmental Protection – Air Pollution Control
administrativecode/NR 464.09(2)
administrativecode/NR 464.09(2)
section
true