NR 407.025(2)(b)(b) For any trade allowed in an operation permit pursuant to par. (a), the owner or operator of the stationary source shall provide the department and, for part 70 sources, the administrator, with written notification a minimum of 7 days in advance of the date on which the proposed trade is to occur. The written notification shall state when the change is proposed to occur and shall describe the changes in emissions that will result and how these changes in emissions will comply with the terms and conditions of the permit. NR 407.025(2)(c)(c) The permit shield described in s. 285.62 (10) (b), Stats., may extend to terms and conditions that allow the increases and decreases in emissions allowed under this subsection. NR 407.025 HistoryHistory: Cr. Register, December, 1993, No. 456, eff. 1-1-94; am. (1) (a) (intro.), 3., (b) 1., 2., (c), (2) (a) and (b), Register, December, 1997, No. 504, eff. 1-1-98; corrections in (1) (d) and (2) (c) made under s. 13.93 (2m) (b) 7., Stats., Register, October, 1999, No. 526. NR 407.03NR 407.03 Exemptions from operation permit requirements. NR 407.03(1)(1) Specific categories of exempt sources. Any direct stationary source that is not an affected source and is not required to obtain a permit under 40 CFR part 70 and that consists solely of one of the following categories of stationary sources or consists of a combination of the categories of stationary sources listed under sub. (1) (t) is exempt from the requirement to obtain an operation permit provided the requirements under sub. (4) are met: NR 407.03(1)(a)(a) External combustion furnaces which do not burn any hazardous waste identified under ch. NR 661, or which have been issued a license under ch. NR 670, and which are designed at combined total capacity to burn the following fuels at the maximum rates indicated: NR 407.03(1)(a)1.1. Coal, coke or other solid fuels, except wood, at a heat input rate of not more than 1.0 million Btu per hour. NR 407.03(1)(a)2.2. Wood alone or wood in combination with gaseous or liquid fuels at a heat input rate of not more than 5.0 million Btu per hour. NR 407.03(1)(a)3.3. Residual or crude oil at a heat input rate of not more than 5.0 million Btu per hour. NR 407.03(1)(a)4.4. Distillate oil at a heat input rate of not more than 10 million Btu per hour. NR 407.03(1)(a)4m.4m. Distillate oil with a maximum sulfur content of 15 ppm at a heat input rate of not more than 25 million Btu per hour. NR 407.03(1)(a)5.5. Gaseous fuel at a heat input rate of not more than 25 million Btu per hour. NR 407.03(1)(b)(b) Equipment designed to incinerate solid wastes, which are not pathological wastes, infectious wastes, municipal wastes or hazardous wastes under ch. NR 661, at a rate of not more than 500 pounds per hour. NR 407.03(1)(bm)(bm) Equipment owned or operated by a government agency, such as police or sheriff’s department, that is used to incinerate only drugs confiscated by federal, state, or local law enforcement agencies, provided the equipment meets all of the following design requirements: NR 407.03(1)(bm)1.1. The equipment shall be a dual-chamber incinerator that complies with all of the following: NR 407.03(1)(bm)1.a.a. The equipment is designed to incinerate not more than 500 pounds of material per hour. NR 407.03(1)(bm)1.b.b. The equipment has a secondary chamber that operates at all times with a minimum temperature of 1,400 degrees Fahrenheit and a minimum gas retention time of 0.5 seconds. NR 407.03(1)(bm)2.a.a. Each stack shall have a height at least 1.5 times higher than the peak of the highest structure within 150 feet. NR 407.03(1)(bm)2.c.c. Each stack shall have unobstructed vertical discharge when the incinerator is operated. Properly installed and maintained spark arresters are not considered obstructions. NR 407.03(1)(bm)3.a.a. The unit shall reach a minimum operating temperature of 1,400 degrees Fahrenheit prior to introducing the materials to be incinerated. NR 407.03(1)(bm)3.b.b. The quantity of material incinerated, including packaging, is limited to no more than 25 pounds in any 24-hour period, with the exception of marijuana. Marijuana may be incinerated in quantities up to the design capacity of the incinerator. NR 407.03(1)(bm)3.c.c. Fuel for the incinerator shall be limited to natural gas, liquid petroleum gas, distillate fuel oil with less than 0.0015% sulfur by weight, or the equipment shall use electric power. NR 407.03(1)(bm)3.d.d. The manufacturer’s recommended operating instructions shall be posted at the incinerator and the unit shall be operated in accordance with these instructions. The incinerator shall be operated in accordance with the manufacturer’s specifications and maintained in good working order. NR 407.03(1)(bm)4.4. The owner or operator shall install, calibrate, maintain, and operate a monitoring device that continuously measures and records the temperature of the secondary chamber of the incinerator. NR 407.03(1)(bm)5.5. The owner or operator shall maintain records sufficient to demonstrate that each of the requirements listed in this paragraph are met. The records shall be retained for a minimum of 5 years, and shall include all of the following: NR 407.03(1)(ce)(ce) Grain storage facilities, including facilities with column dryers or rack dryers, with an average tonnage of grain received of less than 5500 tons per month, which are not subject to s. NR 440.47, and which are not part 70 sources. The average monthly tonnage of grain received shall be calculated by dividing the cumulative tonnage of grain received since January 1 of each year by 12. The average monthly tonnage of grain received does not include product that the facility sells, acting as a broker, which is never actually received or dried at the grain storage facility. NR 407.03(1)(cm)(cm) Grain processing facilities, including facilities with column dryers or rack dryers, with an average tonnage of grain received of less than 4500 tons per month, which are not subject to s. NR 440.47, and which are not part 70 sources. The average monthly tonnage of grain received shall be calculated by dividing the cumulative tonnage of grain received since January 1 of each year by 12. The average monthly tonnage of grain received does not include product that the facility receives that is packaged when received and remains packaged. NR 407.03(1)(d)(d) Portland concrete batch plants which produce less than 20,000 cubic yards of concrete per month averaged over any 12 consecutive month period. NR 407.03(1)(e)(e) Storage tanks containing organic compounds with a true vapor pressure in pounds per square inch absolute at 70°F of less than 1.52 with a combined total tankage capacity of not more than 40,000 gallons. NR 407.03(1)(f)(f) VOC storage tanks with a combined total tankage capacity of not more than 10,000 gallons of volatile organic compounds. NR 407.03(1)(g)(g) Painting or coating operations, including associated quality assurance laboratories and cleaning operations, which emit or will emit not more than 1,666 pounds of volatile organic compounds per month, which are measured prior to entering any emission control devices, unless the emissions of any single hazardous air pollutant listed under section 112 (b) of the Act (42 USC 7412 (b)) equal or exceed 10 tons per year or the cumulative emissions of hazardous air pollutants listed under section 112 (b) of the Act equal or exceed 25 tons per year. NR 407.03(1)(gm)(gm) Automobile refinishing operations, including associated quality assurance laboratories and cleaning operations, which emit or will emit not more than 1,666 pounds of volatile organic compounds per month, which are measured prior to entering any emission control devices, unless the emissions of any single hazardous air pollutant listed under section 112(b) of the Act (42 USC 7412(b)) equal or exceed 10 tons per year or the cumulative emissions of hazardous air pollutants listed under section 112(b) of the Act equal or exceed 25 tons per year. NR 407.03(1)(h)(h) Graphic arts operations, including associated quality assurance laboratories and cleaning operations, which emit or will emit not more than 1,666 pounds of volatile organic compounds per month, which are measured prior to entering any emission control devices, unless the emissions of any single hazardous air pollutant listed under section 112 (b) of the Act equal or exceed 10 tons per year or the cumulative emissions of hazardous air pollutants listed under section 112 (b) of the Act equal or exceed 25 tons per year. NR 407.03(1)(i)(i) Cold cleaning equipment which meets both of the following requirements: NR 407.03(1)(i)1.1. The equipment has a total air to solvent interface of 1.0 square meters or less during operation. NR 407.03(1)(i)2.2. The equipment does not use any halogenated HAP solvent as a cleaning or drying agent. NR 407.03(1)(j)(j) Open top vapor degreasing equipment which meets both of the following requirements: NR 407.03(1)(j)1.1. The equipment has a total air to vapor interface of 1.0 square meters or less during operation. NR 407.03(1)(j)2.2. The equipment does not use any halogenated HAP solvent as a cleaning or drying agent. NR 407.03(1)(km)(km) Chromium electroplating and chromium anodizing operations which are not major sources or located at major sources and which are any of the following: NR 407.03(1)(km)1.1. Any decorative chromium electroplating operation or chromium anodizing operation that uses fume suppressants as an emission reduction technology. NR 407.03(1)(km)2.2. Any decorative chromium electroplating operation that uses a trivalent chromium bath that incorporates a wetting agent as a bath ingredient. NR 407.03(1)(n)(n) Indirect malt dryers which are designed to burn fuels specified in par. (a) at a heat input rate less than the rates specified in par. (a). NR 407.03(1)(o)(o) A laboratory which emits volatile organic compounds, sulfur dioxide, carbon monoxide, nitrogen oxides or particulate matter or a combination thereof at a rate of less than 5.7 pounds per hour unless the emissions of any single hazardous air pollutant listed under section 112 (b) of the Act (42 USC 7412 (b)) equal or exceed 10 tons per year or the cumulative emissions of all such hazardous air pollutants listed under section 112 (b) of the Act equal or exceed 25 tons per year. Hourly emissions shall be determined, based on the quantitative estimate of air contaminants before they enter any emission control devices, by dividing the total uncontrolled emissions which would have occurred during a calendar month by the total hours of operation of the laboratory during that calendar month. A laboratory is in operation if laboratory apparatus or equipment is in use. NR 407.03(1)(p)(p) Equipment the primary purpose of which is to transport or sort paper. NR 407.03(1)(q)(q) Facilities for chlorination of municipal drinking water, the intake of once through industrial process or cooling water, or water for swimming pools, spas or other recreational establishments. NR 407.03(1)(r)(r) Gasoline dispensing facilities which dispense gasoline or other petroleum products. NR 407.03(1)(s)(s) Bulk gasoline plants which distribute gasoline or other petroleum products and which have an average daily gasoline throughput of less than 15,000 liters (4,000 gallons), based on a 30-day rolling average. NR 407.03(1)(sm)(sm) The following procedures for the remediation or disposal of soil or water contaminated with organic compounds, provided the potential to emit, considering emission control devices, for any hazardous air contaminant listed in Table A to Table C of s. NR 445.07 is not greater than the emission rate listed in Table A to Table C of s. NR 445.07 for the air contaminant at the respective stack height, the procedure is not a major source and the procedure is not subject to any standard or regulation under section 111 or 112 of the Act (42 USC 7411 or 7412): NR 407.03(1)(sm)1.1. Landspreading of contaminated soil, including the agricultural landspreading of soil contaminated with pesticide or fertilizer. NR 407.03(1)(sm)2.2. Negative pressure venting of contaminated soil or bioremediation, provided the remediation is completed within 18 months or the potential to emit organic compounds from the remediation site is at a rate of not more than 5.7 pounds per hour, considering emission control devices. NR 407.03(1)(sm)3.3. Pilot testing of a negative pressure venting system provided the testing is limited to a total withdrawal of not more than 150,000 standard cubic feet (scf) of air. NR 407.03 NoteNote: The total withdrawal may be determined by the equation: Total withdrawal (scf) = hours of operation of pilot test (hr) × average flow rate in cubic feet per minute at standard conditions (scfm) × 60 min/hr. An example is: 10 hours of operation × 250 scfm × 60 min/hr = 150,000 scf. When testing at multiple flow rates, determine the withdrawal for each flow rate and sum the withdrawals for a total withdrawal.
NR 407.03(1)(sm)5.5. Installation and use of devices which remove organic compounds from a private or municipal potable water supply. NR 407.03(1)(sm)6.6. Installation and use of crop irrigation systems or dewatering wells to remediate contaminated water. NR 407.03(1)(sm)7.7. Installation and use of air strippers for treatment of contaminated water, provided the remediation is completed within 18 months or the potential to emit organic compounds from the remediation site is at a rate of not more than 5.7 pounds per hour, considering emission control devices. NR 407.03(1)(sm)8.8. Installation and use of any devices or techniques not listed in this paragraph which are used to remediate soil or water contaminated with organic compounds, if the device or technique is not portable and is not a thermal evaporation unit, and the remediation is completed within 18 months. NR 407.03(1)(sm)9.9. Installation and use of any technique or device to remediate soil or water contaminated with organic compounds as part of actions taken by EPA under the authority of the comprehensive environmental response compensation and liability act of 1980 (42 USC 9601 to 9675), by the department under the authority of s. 292.11 or 292.31, Stats., or by a responsible party in compliance with the requirements of an administrative order, consent decree or contract issued pursuant to the comprehensive environmental response compensation and liability act of 1980 or s. 292.11 or 292.31, Stats. NR 407.03(1)(sq)(sq) Renovation or demolition operations involving regulated asbestos-containing material. NR 407.03(1)(t)(t) A combination of emission units which consists of not more than one each of the following specific categories of sources unless the combination of units is a major source: NR 407.03(1)(t)3.3. Storage tanks of organic compounds with a combined total tankage capacity of not more than 40,000 gallons if not more than 10,000 gallons of the storage tanks’ capacity is used for storage of volatile organic compounds. NR 407.03(1)(u)(u) Restricted use reciprocating internal combustion engines which are fueled by gaseous fuels, gasoline, or a clean fuel as defined in s. NR 406.02 (1) and which have a combined total electrical output of less than 3,000 kilowatts, or the equivalent in brake horsepower. An owner or operator claiming exemption under this paragraph shall maintain records of all of the following: NR 407.03(1)(u)1.1. The electrical output in kilowatts, or the equivalent in brake horsepower, of each engine. NR 407.03(1)(v)(v) Any quarry, mine or other facility where nonmetallic minerals are extracted that is not a ledge rock quarry or industrial sand mine. NR 407.03(1)(w)(w) Ledge rock quarries with actual production of less than 25,000 tons per month on a rolling 12 month average, or with actual operation of less than 365 days per 5 year period. NR 407.03(1)(x)(x) Industrial sand mines with actual production of less than 2,000 tons per month on a rolling 12 month average. NR 407.03(1)(y)(y) Fixed sand and gravel plants and fixed crushed stone plants with capacities of 25 tons per hour or less. NR 407.03(1)(z)(z) Portable sand and gravel plants and portable crushed stone plants with capacities of 150 tons per hour or less.
/exec_review/admin_code/nr/400/407
true
administrativecode
/exec_review/admin_code/nr/400/407/03/1/bm/5/a
Department of Natural Resources (NR)
Chs. NR 400-499; Environmental Protection – Air Pollution Control
administrativecode/NR 407.03(1)(bm)5.a.
administrativecode/NR 407.03(1)(bm)5.a.
section
true