(2) Within the range of 7.0 to 10.0 at all times.
(1) Within the range of 7.0 to 10.0 at all times.
(1) Within the range of 7.0 to 10.0 at all times.
(1) Within the range of 7.0 to 10.0 at all times.
(1) Within the range of 7.0 to 10.0 at all times.
(1) Within the range of 7.0 to 10.0 at all times.
NR 274.034 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.035NR 274.035Pretreatment standards for existing sources. Except as provided in ss. NR 211.13 and 211.14, any new [existing] source subject to the secondary aluminum smelting subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the following PSES:
(1) At or before the commingling of delacquering scrubber liquor blowdown with other process or nonprocess waters.
NR 274.035 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.036NR 274.036Pretreatment standards for new sources. Except as provided in s. NR 211.13, any new source subject to the secondary aluminum smelting subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the following PSNS:
(1) At or before the commingling of delacquering scrubber liquor blowdown with other process or nonprocess waters.
NR 274.036 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
subch. IV of ch. NR 274Subchapter IV — Primary Copper Smelting
NR 274.04NR 274.04Applicability; description of the primary copper smelting subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from the primary smelting of copper from ore or ore concentrates by processes such as roasting, converting, leaching if preceded by a pyrometallurgical step, slag granulation and dumping, and fire refining and from the casting of products from these operations.
NR 274.04 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.041NR 274.041Specialized definitions. The following definitions apply to the terms used in this subchapter:
NR 274.041(1)(1)“Within the impoundment,” for purposes of calculating the volume of process wastewater which may be discharged, has the following meanings:
NR 274.041(1)(a)(a) If the impoundment was constructed prior to February 27, 1975, “within the impoundment” means the surface area within the impoundment at the maximum capacity plus the surface area of the inside and outside slopes of the impoundment dam and the surface area between the outside edge of the impoundment dam and any seepage ditch adjacent to the dam upon which rain falls and is returned to the impoundment, but the surface area allowance for external appurtenances to the impoundment may not be more than 30% of the water surface area within the impoundment dam at maximum capacity.
NR 274.041(1)(b)(b) If the impoundment was constructed on or after February 27, 1975, “within the impoundment” means the water surface area within the impoundment at maximum capacity.
NR 274.041 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.0415NR 274.0415Combining waste streams. If the waste streams subject to this subchapter are combined for treatment or discharge with waste streams subject to the primary electrolytic copper refining subchapter or the metallurgical acid plant subchapter, the quantity of each pollutant or pollutant property discharged may not exceed the quantity of each pollutant or pollutant property which could be discharged if each waste stream was discharged separately.
NR 274.0415 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.042NR 274.042Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 274.042(1)(1)Except as provided in 40 CFR 125.30 to 125.32 and sub. (2), any existing point source subject to this primary copper smelting subchapter may not discharge process wastewater pollutants to waters of the state.
NR 274.042(2)(2)A process wastewater impoundment which is designed, constructed, and operated to contain the precipitation from the 10-year, 24-hour rainfall event as established for the impoundment’s location by the national climatic center, national oceanic and atmospheric administration, may discharge a volume of process wastewater equivalent to the volume of precipitation which falls within the impoundment in excess of the precipitation attributable to the 10-year, 24-hour rainfall event, when such an event occurs.
NR 274.042 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.043NR 274.043Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 274.043(1)(1)Except as provided in 40 CFR 125.30 to 125.32 and sub. (2), any existing point source subject to this subchapter may not discharge process wastewater pollutants into waters of the state.
NR 274.043(2)(2)A process wastewater impoundment which is designed, constructed, and operated to contain the precipitation from the 25-year, 24-hour rainfall event as established for the impoundment’s location by the national climatic center, national oceanic and atmospheric administration, may discharge a volume of process wastewater equivalent to the volume of precipitation which falls within the impoundment in excess of the precipitation attributable to the 25-year, 24-hour rainfall event, when such an event occurs.
NR 274.043 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.044NR 274.044New source performance standards. Any new source subject to this subchapter may not discharge process wastewater pollutants into waters of the state.
NR 274.044 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.046NR 274.046Pretreatment standards for new sources. Except as provided in s. NR 211.13, any new source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and may not discharge process wastewater pollutants to a POTW.
NR 274.046 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
subch. V of ch. NR 274Subchapter V — Primary Electrolytic Copper Refining
NR 274.05NR 274.05Applicability; description of the primary electrolytic copper refining subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from the electrolytic refining of primary copper, such as anode casting performed at refineries which are not located on-site with a smelter, product casting, and byproduct recovery.
NR 274.05 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.052NR 274.052Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available. Except as provided in 40 CFR 125.30 to 125.32, any existing point source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by application of BPT:
(1) Within the range of 6.0 to 9.0.
NR 274.052 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.053NR 274.053Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable. Except as provided in 40 CFR 125.30 to 125.32, any existing point source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by application of BAT:
NR 274.053 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.054NR 274.054New source performance standards. Any new source subject to this subchapter shall achieve the following standards:
(1) Within the range of 7.5 to 10.0 at all times.
(1) Within the range of 7.5 to 10.0 at all times.
(1) Within the range of 7.5 to 10.0 at all times.
(1) Within the range of 7.5 to 10.0 at all times.
(1) Within the range of 7.5 to 10.0 at all times.
NR 274.054 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.056NR 274.056Pretreatment standards for new sources. Except as provided in s. NR 211.13, any new source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the following PSNS:
NR 274.056 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
subch. VI of ch. NR 274Subchapter VI — Secondary Copper
NR 274.06NR 274.06Applicability; description of the secondary copper subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from the recovery, processing and remelting of new and used copper scrap and residues to produce copper metal and copper alloys, except for continuous rod casting.
NR 274.06 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.061NR 274.061Specialized definitions. The following definitions apply to the terms used in this subchapter:
NR 274.061(2)(2)“Within the impoundment,” for purposes of calculating the volume of process wastewater which may be discharged, means the following:
NR 274.061(2)(a)(a) For all impoundments constructed prior to April 23, 1984, “within the impoundment” means the water surface area within the impoundment at the maximum capacity plus the surface area of the inside and outside slopes of the impoundment dam and the surface area between the outside edge of the impoundment dam and any seepage ditch immediately adjacent to the dam upon which rain falls and is returned to the impoundment, but the surface area allowance for external appurtenances to the impoundment shall not be more than 30% of the water surface area within the impoundment dam at maximum capacity.
NR 274.061(2)(b)(b) For all impoundments constructed on or after April 23, 1984, “within the impoundment” means the water surface area within the impoundment at the maximum capacity.
NR 274.061(3)(3)“Pond water surface area,” for the purpose of calculating the volume of wastewater which may be discharged, means the water surface area of the pond created by the impoundment for storage of process wastewater at normal operating level, but not less than one third of the surface area of the maximum amount of water which could be contained by the impoundment.
NR 274.061(4)(4)“Normal operating level” means the average level of the pond during the preceding calendar month.
NR 274.061 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.062NR 274.062Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 274.062(1)(1)Except as provided in 40 CFR 125.30 to 125.32 and subs. (2) and (3), any existing point source subject to this subchapter may not discharge process wastewater pollutants to waters of the state.
NR 274.062(2)(2)A process wastewater impoundment which is designed, constructed and operated to contain the precipitation from the 10-year, 24-hour rainfall event as established for the impoundment’s location by the national climatic center, national oceanic and atmospheric administration, may discharge a volume of process wastewater equivalent to the volume of precipitation which falls within the impoundment in excess of the precipitation attributable to the 10-year, 24-hour rainfall event, when such an event occurs.
NR 274.062(3)(3)During any calendar month, a process wastewater impoundment may discharge from the overflow a volume equivalent to whatever is the greatest of the following:
NR 274.062(3)(a)(a) The difference between the precipitation for that month which falls within the impoundment and the evaporation from the impoundment for that month; or
NR 274.062(3)(b)(b) The difference between the mean precipitation for that month which falls within the impoundment and the mean evaporation for that month as established for the impoundment’s location by the national climatic center, national oceanic and atmospheric administration or as otherwise established if no monthly evaporation has been determined by the national climatic center.
NR 274.062(3)(c)(c) Any process wastewater discharge according to this subsection shall comply with the following limitations:
(1) Within the range of 6.0 to 9.0.
NR 274.062 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.063NR 274.063Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 274.063(1)(1)Except as provided in 40 CFR 125.30 to 125.32 and sub. (2), any existing point source subject to this subchapter may not discharge process wastewater pollutants into waters of the state.
NR 274.063(2)(2)A process wastewater impoundment which is designed, constructed and operated to contain the precipitation from the 25-year, 24-hour rainfall event as established for the impoundment’s location by the national climatic center, national oceanic and atmospheric administration, may discharge a volume of process wastewater equivalent to the volume of precipitation which falls within the impoundment in excess of the precipitation attributable to the 25-year, 24-hour rainfall event, when such an event occurs.
NR 274.063 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.064NR 274.064New source performance standards. Any new source subject to this subchapter may not discharge process wastewater pollutants into waters of the state.
NR 274.064 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.065NR 274.065Pretreatment standards for existing sources.
NR 274.065(1)(1)Except as provided in ss. NR 211.13 and 211.14 and sub. (2), any existing source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and may not discharge process wastewater pollutants into a POTW.
NR 274.065(2)(2)A process wastewater impoundment which is designed, constructed, and operated to contain the precipitation from the 25-year, 24-hour rainfall event as established for the impoundment’s location by the national climatic center, national oceanic and atmospheric administration, may discharge a volume of process wastewater equivalent to the volume of precipitation which falls within the impoundment in excess of the precipitation attributable to the 25-year, 24-hour rainfall event, when such an event occurs.
NR 274.065 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.066NR 274.066Pretreatment standards for new sources. Except as provided in s. NR 211.13, any new source subject to the secondary copper subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and may not discharge process wastewater pollutants into a POTW.
NR 274.066 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
subch. VII of ch. NR 274Subchapter VII — Primary Lead
NR 274.07NR 274.07Applicability; description of the primary lead subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from the production of lead at primary lead smelters and refineries.
NR 274.07 HistoryHistory: Cr. Register, March, 1991, No. 423, eff. 4-1-91.
NR 274.072NR 274.072Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available. Except as provided in 40 CFR 125.30 to 125.32, any existing point source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by application of BPT:
(1) Within the range of 7.5 to 10.0 at all times.
(1) Within the range of 7.5 to 10.0 at all times.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.