NR 255.31(1)(1)Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BPT:
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.31(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 43 to 53. 
NR 255.31 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.32NR 255.32Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.32(1)(1)Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BAT:
NR 255.32(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 54 to 62.
NR 255.32 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.33NR 255.33New source performance standards.
NR 255.33(1)(1)The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards:
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.33(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 63 to 71.
NR 255.33 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.34NR 255.34Pretreatment standards for existing sources.
NR 255.34(1)(1)Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources:
NR 255.34(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 72 to 80. 
NR 255.34(3)(3)In cases where battery employe shower wastewater containing concentrations of lead exceeding 0.20 mg/l is combined with process wastewaters prior to treatment, the control authority may, under and notwithstanding the provisions of s. NR 211.12, exercise its discretion and classify battery employe shower wastewater as an unregulated rather than a dilute (FD) wastestream, for the purpose of applying the combined wastestream formula. Before the control authority may exercise its discretion to classify such a stream as an unregulated stream, the battery manufacturer must provide engineering, production, and sampling and analysis information sufficient to allow a determination by the control authority on how the stream should be classified.
NR 255.34 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.35NR 255.35Pretreatment standards for new sources.
NR 255.35(1)(1)Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources:
NR 255.35(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 81 to 89. 
NR 255.35 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. V of ch. NR 255Subchapter V — Leclanche Subcategory
NR 255.40NR 255.40Applicability; description of the Leclanche subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing Leclanche type batteries.
NR 255.40 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.43NR 255.43New source performance standards.
NR 255.43(1)(1)The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards:
NR 255.43(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than the battery manufacturing operation listed in table 90.
NR 255.43 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.44NR 255.44Pretreatment standards for existing sources.
NR 255.44(1)(1)Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources:
NR 255.44(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than the battery manufacturing operation listed in table 91
NR 255.44 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.45NR 255.45Pretreatment standards for new sources.
NR 255.45(1)(1)Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources:
NR 255.45(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than the battery manufacturing operation listed in table 92. 
NR 255.45 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. VI of ch. NR 255Subchapter VI — Lithium Subcategory
NR 255.50NR 255.50Applicability; description of the lithium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing lithium anode batteries.
NR 255.50 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.53NR 255.53New source performance standards.
NR 255.53(1)(1)The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards:
1 Within the range of 7.5 to 10.0 at all times.
1Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.53(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 93 to 96.
NR 255.53 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.55NR 255.55Pretreatment standards for new sources.
NR 255.55(1)(1)Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources:
NR 255.55(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 97 to 99. 
NR 255.55 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. VII of ch. NR 255Subchapter VII — Magnesium Subcategory
NR 255.60NR 255.60Applicability; description of the magnesium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing magnesium anode batteries.
NR 255.60 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.63NR 255.63New source performance standards.
NR 255.63(1)(1)The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards:
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.63(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 100 to 104.
NR 255.63 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.64NR 255.64Pretreatment standards for existing sources.
NR 255.64(1)(1)Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources:
NR 255.64(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 105 to 108.
NR 255.64 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.65NR 255.65Pretreatment standards for new sources.
NR 255.65(1)(1)Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources:
NR 255.65(2)(2)There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 109 to 112. 
NR 255.65 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.