NR 255.13 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.14NR 255.14 Pretreatment standards for existing sources. NR 255.14(1)(1) Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources: NR 255.14(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 27 to 34. NR 255.14 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688. NR 255.15NR 255.15 Pretreatment standards for new sources. NR 255.15(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: NR 255.15(2)(2) There may be no discharge allowance for process waste-water pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 35 to 42. NR 255.15 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.20NR 255.20 Applicability; description of the calcium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing calcium anode batteries. NR 255.20 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.23NR 255.23 New source performance standards. There may be no discharge allowance for process wastewater pollutants from any battery manufacturing new source subject to this subchapter. NR 255.23 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.25NR 255.25 Pretreatment standards for new sources. There may be no discharge allowance for process wastewater pollutants into a POTW from any battery manufacturing new source subject to this subchapter. NR 255.25 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.30NR 255.30 Applicability; description of the lead subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing lead anode batteries. NR 255.30 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.31NR 255.31 Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available. NR 255.31(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BPT: 1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.31(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 43 to 53. NR 255.31 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688. NR 255.32NR 255.32 Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable. NR 255.32(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BAT: NR 255.32(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 54 to 62. NR 255.32 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688. NR 255.33NR 255.33 New source performance standards. NR 255.33(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: 1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.33(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 63 to 71. NR 255.33 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.34NR 255.34 Pretreatment standards for existing sources. NR 255.34(1)(1) Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources: NR 255.34(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 72 to 80. NR 255.34(3)(3) In cases where battery employe shower wastewater containing concentrations of lead exceeding 0.20 mg/l is combined with process wastewaters prior to treatment, the control authority may, under and notwithstanding the provisions of s. NR 211.12, exercise its discretion and classify battery employe shower wastewater as an unregulated rather than a dilute (FD) wastestream, for the purpose of applying the combined wastestream formula. Before the control authority may exercise its discretion to classify such a stream as an unregulated stream, the battery manufacturer must provide engineering, production, and sampling and analysis information sufficient to allow a determination by the control authority on how the stream should be classified. NR 255.34 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688. NR 255.35NR 255.35 Pretreatment standards for new sources. NR 255.35(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: NR 255.35(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 81 to 89. NR 255.35 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.40NR 255.40 Applicability; description of the Leclanche subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing Leclanche type batteries. NR 255.40 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.43NR 255.43 New source performance standards. NR 255.43(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: NR 255.43(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than the battery manufacturing operation listed in table 90. NR 255.43 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.44NR 255.44 Pretreatment standards for existing sources. NR 255.44(1)(1) Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources: NR 255.44(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than the battery manufacturing operation listed in table 91 NR 255.44 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688. NR 255.45NR 255.45 Pretreatment standards for new sources. NR 255.45(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: NR 255.45(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than the battery manufacturing operation listed in table 92. NR 255.45 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.50NR 255.50 Applicability; description of the lithium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing lithium anode batteries. NR 255.50 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.53NR 255.53 New source performance standards. NR 255.53(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: 1 Within the range of 7.5 to 10.0 at all times.
1Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times.
NR 255.53(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 93 to 96. NR 255.53 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87. NR 255.55NR 255.55 Pretreatment standards for new sources. NR 255.55(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: NR 255.55(2)(2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 97 to 99. NR 255.55 HistoryHistory: Cr. Register, November, 1987, No. 383, eff. 12-1-87.