NR 254.005(1)(1) Any existing source subject to this chapter which discharges to waters of the state shall achieve: NR 254.005(1)(a)(a) the effluent limitations representing BPT by July 1, 1977; and NR 254.005(2)(2) Any new source subject to this chapter which discharges to waters of the state shall achieve NSPS at the commencement of discharge. NR 254.005(3)(3) Any existing source subject to this chapter which introduces process wastewater pollutants into a POTW shall achieve PSES by July 10, 1985. NR 254.005(4)(4) Any new source subject to this chapter which introduces process wastewater pollutants into a POTW shall achieve PSNS at the commencement of discharge. NR 254.005 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.006NR 254.006 Removal credits for phenols (4AAP). Removal allowances pursuant to s. NR 211.13 may be granted for phenols (4AAP) limited by this chapter when phenols (4AAP) are used as an indicator or surrogate pollutant. NR 254.006 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.01NR 254.01 Applicability; description of the cokemaking subcategory. This subcategory applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from byproduct and beehive cokemaking operations. NR 254.01 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.011NR 254.011 Specialized definitions. The following definitions are applicable to the terms used in cokemaking subcategory: NR 254.011(1)(1) “Beehive cokemaking” means operations in which coal is heated with the admission of air in controlled amounts for the purpose of producing coke and which do not recover byproducts. NR 254.011(2)(2) “Byproduct cokemaking” means operations in which coal is heated in the absence of air to produce coke. Byproducts may be recovered from the gases and liquids driven from the coal. NR 254.011(3)(3) “Merchant byproduct cokemaking” means byproduct cokemaking operations which provide more than 50% of the produced coke to operations, industries, or processes other than iron making blast furnaces associated with steel production. NR 254.011(4)(4) “Iron and steel byproduct cokemaking” means byproduct cokemaking operations other than merchant cokemaking operations. NR 254.011(5)(5) “Wet desulfurization system” means systems which remove sulfur compounds from coke oven gases and produce contaminated process wastewater. NR 254.011(6)(6) “Indirect ammonia recovery system” means systems which recover ammonium hydroxide as a byproduct from coke oven gases and waste ammonia liquors. NR 254.011(7)(7) “Physical chemical treatment system” means full scale coke plant wastewater treatment systems incorporating full scale granular activated carbon adsorption units which were in operation prior to January 7, 1981. NR 254.011 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.012NR 254.012 Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available. NR 254.012(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the effluent limitations set forth in sub. (2), (3), or (4) representing the degree of effluent reduction attainable by the application of BPT. NR 254.012 Note(1) Within the range of 6.0 to 9.0
NR 254.012(2)(b)(b) Increased loadings, not to exceed 11% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.012(2)(c)(c) Increased loadings, not to exceed 27% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.012 Note(1) Within the range of 6.0 to 9.0
NR 254.012(3)(b)(b) Increased loadings, not to exceed 10% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.012(3)(c)(c) Increased loadings, not to exceed 25% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.012(4)(4) Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state. NR 254.012 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.013NR 254.013 Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable. NR 254.013(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the effluent limitations in sub. (2), (3), or (4) representing the degree of effluent reduction attainable by the application of BAT. NR 254.013(2)(b)(b) Increased loadings, not to exceed 16% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.013(2)(c)(c) Increased loadings, not to exceed 39% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.013(2)(d)(d) The following BAT effluent limitations shall be applicable to plants with physical chemical treatment systems: NR 254.013(2)(e)(e) Increased loadings, not to exceed 24% above the limitations in par. (d), are allowed for plants with physical chemical pretreatment systems which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.013(3)(b)(b) Increased loadings, not to exceed 15% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.013(3)(c)(c) Increased loadings, not to exceed 35% of the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.013(3)(d)(d) The following BAT effluent limitations shall be applicable to plants with physical chemical treatment systems: NR 254.013(3)(e)(e) Increased loadings, not to exceed 21% above the limitations in par. (d), are allowed for plants with physical chemical pretreatment systems which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.013(4)(4) Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state. NR 254.013 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.014NR 254.014 New source performance standards. NR 254.014(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the NSPS in sub. (2), (3), or (4). NR 254.014 Note(1) Within the range of 6.0 to 9.0
NR 254.014(2)(b)(b) Increased loadings, not to exceed 16% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.014(2)(c)(c) Increased loadings, not to exceed 39% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.014 Note(1) Within the range of 6.0 to 9.0
NR 254.014(3)(b)(b) Increased loadings, not to exceed 15% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.014(3)(c)(c) Increased loadings, not to exceed 35% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.014(4)(4) Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state. NR 254.014 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.015NR 254.015 Pretreatment standards for existing sources. NR 254.015(1)(1) Except as provided in ss. NR 211.13 and 211.14, any existing source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the PSES in sub. (2) or (3). NR 254.015(2)(b)(b) Increased loadings, not to exceed 24% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.015(2)(c)(c) Increased loadings, not to exceed 58% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.015(3)(b)(b) Increased loadings, not to exceed 21% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.015(3)(c)(c) Increased loadings, not to exceed 50% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.015 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.016NR 254.016 Pretreatment standards for new sources. NR 254.016(1)(1) Except as provided in s. NR 211.13, any existing [new] source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the PSNS in sub. (2) or (3). NR 254.016(2)(b)(b) Increased loadings, not to exceed 24% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.016(2)(c)(c) Increased loadings, not to exceed 58% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.016(3)(b)(b) Increased loadings, not to exceed 21% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume. NR 254.016(3)(c)(c) Increased loadings, not to exceed 50% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume. NR 254.016 HistoryHistory: Cr. Register, May, 1989, No. 401, eff. 6-1-89. NR 254.017NR 254.017 Effluent limitations representing the degree of effluent reduction attainable by the application of the best conventional pollutant control technology.
/exec_review/admin_code/nr/200/254
true
administrativecode
/exec_review/admin_code/nr/200/254/i/012/3
Department of Natural Resources (NR)
Chs. NR 200-299; Environmental Protection – Wisconsin Pollutant Discharge Elimination System
administrativecode/NR 254.012(3)
administrativecode/NR 254.012(3)
section
true