This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
Chapter NR 216
STORM WATER DISCHARGE PERMITS
NR 216.001   Purpose.
NR 216.002   Definitions.
NR 216.003   General permits.
NR 216.004   Noncompliance.
NR 216.005   Long-term storm water maintenance requirements.
NR 216.006   Electronic reporting of information.
NR 216.007   Water quality standards.
Subchapter I — Municipal Storm Water Discharge Permits
NR 216.01   Purpose.
NR 216.02   Permit coverage required.
NR 216.023   Urbanized area exemption.
NR 216.024   Non-urbanized area exemption.
NR 216.025   Designation criteria.
NR 216.026   Petition for permit coverage.
NR 216.03   Application for permit coverage.
NR 216.031   General permit application requirements.
NR 216.032   Individual permit application requirements.
NR 216.04   Issuance of permits.
NR 216.065   Permittee responsibility and permit conditions.
NR 216.07   Permit requirements.
NR 216.075   Reliance on another entity.
NR 216.08   Permit fees.
NR 216.09   Individual permit reapplication.
NR 216.10   Authorized local program.
Subchapter II — Industrial Storm Water Discharge Permits
NR 216.20   Purpose.
NR 216.21   Applicability and exclusions.
NR 216.22   Application requirements.
NR 216.23   Permit coverage.
NR 216.24   Industry-specific general permits.
NR 216.25   Individual permit.
NR 216.27   Storm water pollution prevention plan.
NR 216.28   Monitoring requirements.
NR 216.29   Compliance and reporting requirements.
NR 216.30   Permit fees.
NR 216.31   Permit coverage transfers.
NR 216.32   Permit termination.
Subchapter III — Construction Site Storm Water Discharge Permits
NR 216.41   Purpose.
NR 216.42   Applicability.
NR 216.43   Notice of intent requirements.
NR 216.44   Notice of intent deadline.
NR 216.45   Incomplete notice of intent and time limit for department decision.
NR 216.455   Proof of permit coverage.
NR 216.456   Responsible parties.
NR 216.46   Erosion control plan requirements.
NR 216.47   Storm water management plan requirements.
NR 216.48   Reporting and monitoring requirements.
NR 216.49   Conformance with other applicable regulations.
NR 216.50   Amendments.
NR 216.51   Department actions.
NR 216.52   Use of information.
NR 216.54   Transfers.
NR 216.55   Notice of termination.
Ch. NR 216 NoteNote: Corrections made under s. 13.93 (2m) (b) 7., Stats., Register, August, 1997, No. 500. Chapter NR 216 as it existed on July 31, 2004 was repealed and a new chapter NR 216 was created Register July 2004 No. 583, effective August 1, 2004.
NR 216.001NR 216.001Purpose. The purpose of this chapter is to establish criteria defining those storm water discharges needing WPDES storm water permits, as required by s. 283.33, Stats., and to implement the appropriate performance standards of subchs. III and IV of ch. NR 151. The goal of this chapter is to minimize the discharge of pollutants carried by storm water runoff from certain industrial facilities, construction sites and municipal separate storm sewer systems as identified in this chapter.
NR 216.001 HistoryHistory: CR 03-028: cr. Register July 2004 No. 583, eff. 8-1-04.
NR 216.002NR 216.002Definitions. For the purposes of this chapter the following definitions are applicable:
NR 216.002 NoteNote: Additional definitions may be found in s. NR 205.03.
NR 216.002(1m)(1m)“Benchmark” means a minimum numeric or narrative level of pollution control required to demonstrate progress toward a required level of pollution control.
NR 216.002(1r)(1r)“Best management practices” or “BMPs” means structural or non-structural measures, practices, techniques or devices employed to avoid or minimize soil, sediment or pollutants carried in runoff to waters of the state.
NR 216.002(2)(2)“Construction site” means an area upon which one or more land disturbing construction activities occur that in total will disturb one acre or more of land, including areas that are part of a larger common plan of development or sale where multiple separate and distinct land disturbing construction activities may be taking place at different times on different schedules but under one plan such that the total disturbed area is one acre or more. A long-range planning document that describes separate construction projects, such as a 20-year transportation improvement plan, is not a common plan of development.
NR 216.002(3)(3)“Contaminated storm water” means storm water that comes into contact with material handling equipment or activities, raw materials, intermediate products, final products, waste materials, byproducts or industrial machinery in the source areas listed in s. NR 216.27 (3) (e).
NR 216.002(4)(4)“Department” means the department of natural resources.
NR 216.002(5)(5)“Discharge” has the meaning given it in s. 283.01 (4), Stats.
NR 216.002(6)(6)“Discharge of pollutant” or “discharge of pollutants” has the meaning given it in s. 283.01 (5), Stats.
NR 216.002(7)(7)“Erosion” means the process by which the land’s surface is worn away by the action of wind, water, ice or gravity.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.