This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 162.04(1)(a)7.d.d. Acquiring, consuming, or expending materials.
NR 162.04(1)(a)7.e.e. Obtaining products that comply with federal requirements to use products made in the United States in CWFP projects.
NR 162.04(1)(a)7.f.f. Other capital costs incurred solely for purposes of the scored project.
NR 162.04(1)(a)8.8. ‘Demolition.’ Demolishing existing structures if the demolition is part of a scored project and any of the following applies:
NR 162.04(1)(a)8.a.a. The existing structure is part of the wastewater treatment works.
NR 162.04(1)(a)8.b.b. The demolition is necessary for site preparation.
NR 162.04(1)(a)8.c.c. The demolition is included in abandonment procedures as approved in the plans and specifications of the scored project or when otherwise approved by department staff.
NR 162.04(1)(a)8.d.d. The demolition entails removal of equipment or materials, or both, from inside an existing building or other structure that is part of the treatment works being modified or repurposed as part of the scored project.
NR 162.04(1)(a)9.9. ‘Discharge monitoring.’ The cost of equipment owned or to be owned by the municipality for monitoring, sampling, and analyzing industrial discharges to a municipal wastewater treatment works.
NR 162.04(1)(a)10.10. ‘Easements and rights-of-way.’ Acquisition of easements and rights–of–way, including purchase cost and administrative and legal expenses.
NR 162.04(1)(a)11.11. ‘Equipment.’ Equipment related to the scored project, the costs of which the department may prorate if the municipality intends to use the equipment for multiple purposes rather than solely for the treatment works. Eligible equipment includes any of the following:
NR 162.04(1)(a)11.a.a. Mobile equipment, such as portable stand-by generators, portable emergency pumps, and grounds and maintenance equipment for mowing and snow removal, for the treatment works.
NR 162.04(1)(a)11.b.b. Spare parts if included in the plans and specifications or otherwise approved by the department.
NR 162.04(1)(a)11.c.c. Machinery for manufacturing or repairing necessary tools or equipment for the treatment works.
NR 162.04(1)(a)11.d.d. Computers, tablets, and related equipment, including purchasing, installing, programming, or upgrading computers, printers, control systems, and other computer-related equipment necessary for operating and maintaining the treatment works. Equipment and systems for accounting, billing, public notification, testing, monitoring, reporting, emergency alerts, communications, geographic information, and supervisory control and data acquisition are included under this subd. 11. d.
NR 162.04(1)(a)12.12. ‘Fees.’ Fees paid by the municipality for any of the following:
NR 162.04(1)(a)12.a.a. Permits obtained for construction, including building, electrical, and plumbing permits, pit or trench dewatering permits, construction site storm water permits, and railroad crossing permits.
NR 162.04 NoteNote: Permit fees are not required by the department for waterway projects authorized under ch. 30, Stats., that are funded in whole or in part by any federal or state agency. Therefore, if a municipality at the time of purchase of a permit under ch. 30, Stats., pays a fee for the permit due to not identifying the project as being funded with state or federal funds, the fee is not eligible for reimbursement by the CWFP.
NR 162.04(1)(a)12.b.b. Legal fees of an attorney that is not an on-staff municipal attorney, including costs of legal reviews of architectural, engineering, or construction contracts, user charge systems and sewer use ordinances, management plans, intermunicipal agreements, and legal work necessary for securing eligible permits.
NR 162.04(1)(a)12.c.c. Service fees paid to a state or federal agency, except administrative fees paid annually along with principal and interest payments on a CWFP loan.
NR 162.04(1)(a)13.13. ‘Groundwater monitoring.’ Installing groundwater monitoring equipment or facilities.
NR 162.04(1)(a)14.14. ‘Insurance.’ Purchasing insurance necessary during construction of the scored project, including property, liability, builder’s risk, and construction insurance.
NR 162.04(1)(a)15.15. ‘Interim debt.’ Costs associated with interim debt for the scored project as delineated in sub. (3).
NR 162.04(1)(a)16.16. ‘Laboratories.’ Laboratory equipment related to initial setup or a significant upgrade or expansion of an on-site laboratory if requested in the financial assistance application.
NR 162.04(1)(a)17.17. ‘Land acquisition.’ Acquiring land, including purchase cost and administrative and legal expenses if any of the following applies:
NR 162.04(1)(a)17.a.a. The land will be used for storage of treated wastewater in land treatment systems before land application.
NR 162.04(1)(a)17.b.b. The land will be used for composting or temporary storage of compost residues that result from wastewater treatment if the department has approved a program for use of the compost.
NR 162.04(1)(a)17.c.c. The land is property on which the wastewater treatment works, biosolids facility, or lift stations will be located.
NR 162.04(1)(a)17.d.d. The land will serve to isolate a treatment facility as required under s. NR 110.15 (3) (d).
NR 162.04(1)(a)17.e.e. The land will be used for sludge spreading.
NR 162.04(1)(a)17.f.f. The land is the property on which individual systems are or will be located if the systems are publicly owned and maintained.
NR 162.04(1)(a)18.18. ‘Lines to public sewer mains.’ Pumping units and pressurized lines from the pumping units to the public sanitary sewer main, or holding and septic tanks and their sewer lines to the public sanitary sewer main, that are included in a sewage collection system, are cost–effective, and are owned and maintained by the applicant municipality.
NR 162.04(1)(a)19.19. ‘Management plans.’ Developing a detailed management plan related to a scored project.
NR 162.04(1)(a)20.20. ‘Municipal staff, equipment, and materials.’ Municipal expenses incurred solely for the scored project and documented by the municipality as force account work, including any of the following:
NR 162.04(1)(a)20.a.a. Salary and benefits of municipal employees, except elected officials or on-staff attorneys, for time spent working directly on the scored project.
NR 162.04(1)(a)20.b.b. Expendable material costs incurred by the municipality.
NR 162.04(1)(a)20.c.c. Estimated costs incurred using equipment owned by the municipality.
NR 162.04(1)(a)21.21. ‘Municipally owned facilities on private property.’ Grinder pumps, sewer laterals, service connections, service branches, risers, and riser pipes if located on private property and municipally owned and municipally maintained or if located on municipally owned land.
NR 162.04(1)(a)22.22. ‘Pretreatment or toxicity reduction.’ Developing a municipal pretreatment or toxicity reduction program and constructing facilities to be used by the municipal treatment works in the program, including monitoring equipment.
NR 162.04(1)(a)23.23. ‘Professional services.’ Engineering, architectural, legal, and other professional services and fees, including any of the following:
NR 162.04(1)(a)23.a.a. Conducting value engineering studies or analyses during the design phase.
NR 162.04(1)(a)23.b.b. Conducting system evaluations and studies.
NR 162.04(1)(a)23.c.c. Developing facilities plans and engineering reports.
NR 162.04(1)(a)23.d.d. Developing, preparing, and submitting plans and specifications.
NR 162.04(1)(a)23.e.e. Preparing, printing, and distributing bidding documents.
NR 162.04(1)(a)23.f.f. Gathering documents and information for, completing, and submitting CWFP financial assistance applications or interest rate subsidy applications and other forms required for financial assistance.
NR 162.04(1)(a)23.g.g. Developing or revising an operations and maintenance manual.
NR 162.04(1)(a)23.h.h. Preparing a plan of operation for the project.
NR 162.04(1)(a)23.i.i. Advertising for and conducting bid lettings.
NR 162.04(1)(a)23.j.j. Analyzing bids, preparing award recommendations, and preparing contracts.
NR 162.04(1)(a)23.k.k. Providing construction management, observation, and inspection.
NR 162.04(1)(a)23.L.L. Preparing for and facilitating public education and participation opportunities.
NR 162.04(1)(a)23.m.m. Travel, indirect costs, and labor for services provided for the scored project.
NR 162.04(1)(a)23.n.n. Developing or updating a user charge system or a sewer use ordinance for wastewater treatment and the sewerage system in the municipality.
NR 162.04(1)(a)23.o.o. Preparing environmental assessment reports and evaluations.
NR 162.04(1)(a)23.p.p. Conducting archaeological surveys and gathering historical site information.
NR 162.04(1)(a)23.q.q. Providing municipal advisor or bond counsel services related to loan closing or the issuance of bonds.
NR 162.04(1)(a)23.r.r. Preparing a water conservation plan.
NR 162.04(1)(a)23.s.s. Producing record drawings.
NR 162.04(1)(a)23.t.t. Updating or upgrading treatment works maps of the areas impacted by the scored project.
NR 162.04(1)(a)23.u.u. Monitoring required use of American-made products.
NR 162.04(1)(a)23.v.v. Providing administration of activities related to the federal Davis-Bacon and Related Acts or other wage requirements.
NR 162.04 NoteNote: Links to the Davis-Bacon and Related Acts can be found on the U.S. department of labor’s website at https://www.dol.gov/agencies/whd/government-contracts/construction/laws. The Davis-Bacon Act is found in 40 USC 3141 et seq. with procedures and rules in 29 CFR Parts 1 to 7.
NR 162.04(1)(a)23.w.w. Conducting research or energy audits for incorporation of energy and water efficiency and conservation into the planning and design of a project.
NR 162.04 NoteNote: When 10 percent or more of the project’s construction and equipment costs are deemed ineligible for CWFP financial assistance, the costs associated with engineering for those ineligible construction and equipment costs are also ineligible under sub. (2) (h).
NR 162.04(1)(a)24.24. ‘Project site.’ Construction-related work activities at the project site of a scored project, including any of the following:
NR 162.04(1)(a)24.a.a. Landscaping areas impacted by construction of the scored project.
NR 162.04(1)(a)24.b.b. Reconnecting laterals due to the rehabilitation of a publicly-owned treatment works.
NR 162.04(1)(a)24.c.c. Relocating watermains or storm sewers if necessary for construction, and replacing pipes with the same size or required minimum size pipe if breakage from construction occurs.
NR 162.04(1)(a)24.d.d. Erecting project and treatment works identification signs.
NR 162.04(1)(a)24.e.e. Preparing a site for construction, including surveying, staking, and grading.
NR 162.04(1)(a)24.f.f. Restoring the construction site to original condition or, when necessary, upgrading the site to meet state and local requirements.
NR 162.04(1)(a)24.g.g. Removing, relocating, or replacing utilities, providing temporary utilities, installing new utility equipment, or upgrading utilities if necessary for construction of the scored project and the recipient is legally obligated to pay these costs. This subd. 24. g. does not apply to storm water pipes.
NR 162.04(1)(a)25.25. ‘Safety.’ Purchasing and installing safety equipment related to the scored project.
NR 162.04(1)(a)26.26. ‘Sanitary sewers.’ Evaluation, new installation, replacement, and lining and other rehabilitation of sanitary sewer pipes.
NR 162.04(1)(a)27.27. ‘Security.’ Purchasing and installing security equipment and appurtenances for the treatment works, including surveillance cameras, fencing, security alarms, and motion detectors, and conducting a vulnerability assessment if necessary for determining security needs.
NR 162.04(1)(a)28.28. ‘Septage facilities.’ Facilities for receiving, storing, or treating septage.
NR 162.04(1)(a)29.29. ‘Sludge removal.’ Removing sludge when necessary as part of a scored project, including treatment plant upgrades, lagoon abandonment, conversion of a lagoon into an equalization basin, or other capital improvements.
NR 162.04(1)(a)30.30. ‘Special assessment fees.’ Financial and legal costs associated with the process of preparing and implementing special assessments when the municipality is pledging special assessments toward repayment of its CWFP loan.
NR 162.04(1)(a)31.31. ‘Staffing evaluations.’ Conducting an evaluation of staffing needs to determine appropriate changes to staffing levels as a result of the scored project.
NR 162.04(1)(a)32.32. ‘Startup.’ Startup expenses for a treatment works incurred solely because of the scored project, including costs for any of the following:
NR 162.04(1)(a)32.a.a. Preparing a startup curriculum and training materials.
NR 162.04(1)(a)32.b.b. Initial training of operating personnel on new or modified equipment, laboratory procedures, computers, controls, records management, and treatment processes.
NR 162.04(1)(a)32.c.c. Obtaining expert operational assistance for adjustments to the treatment process.
NR 162.04(1)(a)32.d.d. Implementing a maintenance management system.
NR 162.04(1)(a)32.e.e. Trucking seed sludge for startup of the activated sludge process.
NR 162.04(1)(a)32.f.f. Attending off-site formal training programs if necessary for the initial operation of the constructed treatment works.
NR 162.04(1)(a)32.g.g. Purchasing the first fuel fill-up for new equipment, such as generators.
NR 162.04(1)(a)32.h.h. Obtaining necessary computers, upgrades, and software.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.