ATCP 93.830(2)(e)2.2. The name and other information needed for contacting appropriate parties if a leak, spill, release, or alarm occurs. ATCP 93.830(2)(f)1.1. A Class C operator is present during all operating hours of the underground storage tank system, except as provided in subd. 2. ATCP 93.830(2)(f)2.a.a. For fueling facilities which are attended as specified in s. ATCP 93.605 (5) (a) and which include hours of operation when no attendant is on duty, a sign shall be posted in a conspicuous place, stating the emergency shutoff procedures and the name and telephone number of the Class B operator, along with the name and telephone number of the local emergency responders, including 911 personnel. ATCP 93.830 NoteNote: Section ATCP 93.605 (5) (a) reads as follows: To be considered as being an attended fueling facility, there shall be at least one attendant regularly on duty on a daily basis, but not necessarily during all hours of operation, to supervise, observe, and control the actual dispensing of fuel. ATCP 93.830(2)(f)2.c.c. For facilities which are not addressed in subd. 2. a. or b. and which typically are unmanned, such as emergency generators, signage shall be posted in accordance with the location and information requirements in subd. 2. a. ATCP 93.830(3)(3) Class C operators. Responsibilities of a Class C operator include all of the following: ATCP 93.830(3)(b)(b) Notifying the Class B or Class A operator and appropriate emergency responders, including 911 personnel, when necessary. ATCP 93.830(3)(c)(c) Controlling or monitoring the dispensing or sale of regulated substances. ATCP 93.830 HistoryHistory: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19. ATCP 93.840ATCP 93.840 Training elements for Class A operators. Each Class A operator shall attend department-approved training in all of the following: ATCP 93.840(1)(1) Basic underground storage tank system requirements, so that the operator can make informed decisions regarding compliance and ensure appropriate individuals are fulfilling operation, maintenance, and record keeping requirements and standards of this chapter regarding all of the following: ATCP 93.840(2)(2) Financial responsibility documentation requirements. ATCP 93.840(4)(4) Requirements for reporting obvious and suspected releases. ATCP 93.840(5)(5) Requirements for permanently closing a tank system and for placing a tank system temporarily out of service. ATCP 93.840 HistoryHistory: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19. ATCP 93.841ATCP 93.841 Training elements for Class B operators. Each Class B operator shall attend department-approved training in all of the following: ATCP 93.841(1)(1) Compared with training for a Class A operator, training for a Class B operator shall provide a more in-depth understanding of operation and maintenance aspects but may cover a more narrow breadth of applicable regulatory requirements. At a minimum, the department-approved training program shall teach the Class B operator, as applicable, about the purposes, methods, and function of: ATCP 93.841(1)(c)(c) Methods of leak and release detection, and leak and release prevention applied to underground storage tank system components. ATCP 93.841(1)(d)(d) Operation and maintenance requirements of this chapter which apply to underground storage tank systems and which address each of the following: ATCP 93.841(2)(2) Each Class B operator shall receive either of the following: ATCP 93.841(2)(a)(a) Site-specific operator training that is focused only on regulatory requirements and equipment specific to the operator’s underground storage tank system facility. ATCP 93.841(2)(b)(b) General training that encompasses all regulatory requirements and typical equipment used at UST facilities. ATCP 93.841 HistoryHistory: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19. ATCP 93.842ATCP 93.842 Training elements for Class C operators. Each Class C operator shall be trained by a Class A or Class B operator or complete department-approved training in all of the following: ATCP 93.842(1)(1) Each Class C operator shall be trained to take appropriate action in response to both of the following: ATCP 93.842(1)(a)(a) Emergencies, including situations which pose an immediate danger or threat to the public or to the environment and which require immediate action. ATCP 93.842(1)(b)(b) Alarms caused by spills, leaks or releases from an underground storage tank system. ATCP 93.842 HistoryHistory: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19. ATCP 93.850ATCP 93.850 Acceptable training and certification processes. ATCP 93.850(1)(1) Operator training shall include evaluation and accreditation of the operator’s knowledge of the applicable requirements in ss. ATCP 93.840 to 93.842. Thirty days after November 1, 2019: ATCP 93.850(1)(a)2.2. Requests for training approval shall be submitted on a form, TR-WM-159, supplied by the department. ATCP 93.850(1)(a)3.3. Requests for approval shall include sufficient information to determine if the training complies with this subsection. ATCP 93.850(1)(a)4.4. The department shall review and make a determination on a request for approval within 21 calendar days of receipt of the request and information necessary to complete the review. ATCP 93.850(1)(a)7.7. The department may revoke the approval for any false statements, misrepresentation of facts, or violation of the conditions on which the approval was based. ATCP 93.850(1)(b)1.1. The person who obtained approval shall maintain an attendance record for at least 3 years from the date of training. ATCP 93.850(1)(c)(c) Certificate requirements. Classroom or field training programs shall issue certificates signed by the trainer to each operator trained that identifies name of trainee, date trained, and operator training class completed, and lists the name of the trainer or examiner and the training company name, address, telephone number, except as noted in par. (b) 2. ATCP 93.850(1)(d)(d) Modifications. Modifications to approved training programs shall be submitted for approval in accordance with par. (a). ATCP 93.850(1)(e)(e) Discontinuation. The person who obtained approval shall notify the department if the training program is discontinued before the end of its approval period. ATCP 93.850(2)(a)(a) Class A and Class B operators. Class A and Class B operators shall obtain a certificate from a department-approved training program. ATCP 93.850(2)(b)(b) Class C operators. Class C operators shall obtain a certificate issued by an accredited Class A or Class B operator or a department-approved training program showing that the Class C operator has successfully completed training conducted or authorized by an accredited Class A or Class B operator for the facility where the Class C operator is employed. ATCP 93.850(4)(a)(a) To address Class A and Class B operators who are responsible for underground storage tank systems in multiple states, the department may accept operator training verification from other states if equivalency can be established. ATCP 93.850(4)(b)(b) Class A and Class B operators who choose to proceed under this subsection shall obtain written proof of their training verification and the state’s equivalent operator training requirements and submit for department approval. ATCP 93.850(4)(c)(c) Class A and Class B operators who choose to proceed under this subsection shall retain a copy of the department’s letter of approval at the facility. ATCP 93.850 HistoryHistory: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19; correction in (1) (a) 6. made under s. 13.92 (4) (b) 7., Stats., and correction in (1) (c) made under s. 35.17, Stats., Register October 2019 No. 766; correction in (1) (a) 2. made under s. 13.92 (4) (b) 6., Stats., Register February 2022 No. 794. ATCP 93.860(1)(1) Class A, class B, and class C operators. All Class A, Class B, and Class C operators shall obtain the documentation specified in s. ATCP 93.850 (1) (c) before assuming their responsibilities under this subchapter, except as provided in sub. (2). ATCP 93.860(2)(a)(a) An incoming Class A or Class B operator for a facility that was complying with s. ATCP 93.820 immediately before that personnel change may obtain the documentation specified in s. ATCP 93.850 (1) (c) no later than 30 days after assuming the responsibilities under this subchapter. ATCP 93.860(2)(b)(b) An incoming Class A or Class B operator for a facility that was complying with s. ATCP 93.820 immediately before that personnel change shall notify the department of the Class A or Class B operator change within 15 days of completion of the training program. ATCP 93.860 HistoryHistory: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19. ATCP 93.870(1)(1) The owner or operator shall maintain the documentation specified in s. ATCP 93.850 (1) (c) at the underground storage tank system site and have it immediately available for inspection by the authorized agent or the department, except as provided in sub. (2).
/exec_review/admin_code/atcp/090/93
true
administrativecode
/exec_review/admin_code/atcp/090/93/viii/841
Department of Agriculture, Trade and Consumer Protection (ATCP)
Chs. ATCP 90-139; Trade and Consumer Protection
administrativecode/ATCP 93.841
administrativecode/ATCP 93.841
section
true