This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
ATCP 93.240(14)(a)1.1. A registration issued by the department as a registered tank specialty firm.
ATCP 93.240(14)(a)2.2. Insurance liability coverage, including pollution impairment liability, of no less than $1,000,000 per claim and $1,000,000 annual aggregate and with a deductible of no more than $100,000 per claim.
ATCP 93.240(14)(b)(b) Application for registration. An entity applying for a tank specialty firm registration shall submit all of the following:
ATCP 93.240(14)(b)1.1. An application in accordance with sub. (2).
ATCP 93.240(14)(b)2.2. An application fee and a registration fee in accordance with Table 93.240.
ATCP 93.240(14)(b)3.3. Proof of the liability coverage specified in par. (a) 2.
ATCP 93.240(14)(b)4.4. A list of technicians certified under subs. (15) to (21) including the areas of certification for each technician.
ATCP 93.240(14)(c)(c) Qualifications for registration. The person applying for a tank specialty firm registration shall be the owner of the business, a partner in the business applying on behalf of a partnership, or the chairman of the board or chief executive officer applying on behalf of the corporation.
ATCP 93.240(14)(d)(d) Responsibilities. An entity that provides storage tank system installation, removal, testing, lining, cleaning or site assessments as a registered tank specialty firm shall utilize the appropriate credentialed persons to install, remove, test, line, or clean storage tanks; to design or install a cathodic protection system for a tank system; or to provide tank-system site assessments.
ATCP 93.240(14)(e)(e) Renewal.
ATCP 93.240(14)(e)1.1. A person may renew a registration as a tank specialty firm.
ATCP 93.240(14)(e)2.2. A tank specialty firm registration shall be renewed in accordance with sub. (7).
ATCP 93.240(14)(e)3.3. An application for a renewal under this paragraph shall include proof of the liability coverage specified in par. (a) 2.
ATCP 93.240(14)(e)4.4. A list of technicians certified under subs. (15) to (21) including the areas of certification for each technician.
ATCP 93.240(15)(15)Tank system site assessors.
ATCP 93.240(15)(a)(a) General.
ATCP 93.240(15)(a)1.1. No person may conduct a tank-system site assessment required under this chapter unless the person holds a certification issued by the department as a certified tank-system site assessor.
ATCP 93.240(15)(a)2.2. Each tank-system site assessment shall be performed by a person who has no personal or monetary interest in the facility and whose employer has no personal or monetary interest in the facility.
ATCP 93.240(15)(b)(b) Application for examination. A person applying to take a tank-system site assessor certification examination shall submit all of the following:
ATCP 93.240(15)(b)1.1. An application in accordance with sub. (2).
ATCP 93.240(15)(b)2.2. An application fee and examination fee in accordance with Table 93.240.
ATCP 93.240(15)(c)(c) Examination. A person seeking to obtain a tank-system site assessor certification shall take and pass an examination in accordance with sub. (9).
ATCP 93.240(15)(d)(d) Application for certification. Upon notification of successfully passing the examination for a tank-system site assessor certification, a person may obtain the certification by submitting an application and the certification fee in accordance with subs. (2) and (9) (g) 3.
ATCP 93.240(15)(e)(e) Renewal.
ATCP 93.240(15)(e)1.1. A person may renew a certification as a tank-system site assessor.
ATCP 93.240(15)(e)2.2. A tank-system site assessor certification shall be renewed in accordance with sub. (7).
ATCP 93.240(16)(16)Aboveground tank system installers.
ATCP 93.240(16)(a)(a) General. Except as provided in par. (g), no person may install an aboveground tank system that is regulated under this chapter unless the person complies with one of the following:
ATCP 93.240(16)(a)1.1. The person holds a certification issued by the department as a certified aboveground tank system installer.
ATCP 93.240(16)(a)2.2. The person holds a Wisconsin registration as a professional engineer and is competent in the engineering methods and requirements in Wisconsin for designing and installing storage tank systems for flammable, combustible or hazardous liquids.
ATCP 93.240(16)(a)3.3. The person is under the direct supervision of another person who holds a certification or registration under subd. 1. or 2. and who is responsible for the installation.
ATCP 93.240(16)(b)(b) Application for examination. A person applying to take an aboveground tank system installer certification examination shall submit all of the following:
ATCP 93.240(16)(b)1.1. An application in accordance with sub. (2)
ATCP 93.240(16)(b)2.2. An application fee and examination fee in accordance with Table 93.240.
ATCP 93.240(16)(c)(c) Examination. A person seeking to obtain an aboveground tank system installer certification shall take and pass an examination in accordance with sub. (9).
ATCP 93.240(16)(d)(d) Application for certification. Upon notification of successfully passing the examination for an aboveground tank system installer certification, a person may obtain the certification by submitting an application and the certification fee in accordance with sub. (2).
ATCP 93.240(16)(e)(e) Responsibilities. A person who installs or supervises the installation of tank systems as a certified aboveground tank system installer shall be present at the job site for at least all of the following activities:
ATCP 93.240(16)(e)1.1. Preinstallation tank system testing.
ATCP 93.240(16)(e)2.2. Inspection and repair of coatings.
ATCP 93.240(16)(e)3.3. Placement of tanks.
ATCP 93.240(16)(e)4.4. Installation and testing of all connections and tank-related piping including vapor recovery, vents and supply pipes.
ATCP 93.240(16)(e)5.5. Installation of monitoring or leak detection devices.
ATCP 93.240(16)(e)6.6. Installation of pumps.
ATCP 93.240(16)(e)7.7. Installation of any underground piping.
ATCP 93.240(16)(f)(f) Renewal.
ATCP 93.240(16)(f)1.a.a. A person may renew a certification as an aboveground tank system installer.
ATCP 93.240(16)(f)1.b.b. An aboveground tank system installer certification shall be renewed in accordance with sub. (7).
ATCP 93.240(16)(f)2.a.a. The renewal of a certification as an aboveground tank system installer shall be contingent upon the installer obtaining at least 12 hours of acceptable continuing education prior to the expiration date of the certification as specified in sub. (8) and Table 93.240, except as provided in subd. 2. b.
ATCP 93.240(16)(f)2.b.b. A person who holds a certification as an aboveground tank system installer may apply to the department for waiver of the continuing education requirements under subd. 2. a. on the grounds of prolonged illness or disability or similar circumstances. Each application for waiver shall be considered individually on its merits by the department.
ATCP 93.240(16)(g)(g) Exclusion. This subsection does not apply to field-constructed aboveground tanks.
ATCP 93.240(17)(17)Underground tank system installers.
ATCP 93.240(17)(a)(a) General. No person may install an underground tank system that is regulated under this chapter unless the person complies with one of the following:
ATCP 93.240(17)(a)1.1. The person holds a certification issued by the department as a certified underground tank system installer.
ATCP 93.240(17)(a)2.2. The person holds a registration as a Wisconsin professional engineer and is competent in the engineering methods and requirements in Wisconsin for designing and installing storage tank systems for flammable, combustible, or hazardous liquids.
ATCP 93.240(17)(a)3.3. The person is under the direct supervision of another person who holds a certification or registration under subd. 1. or 2. and who is responsible for the installation.
ATCP 93.240(17)(b)(b) Application for examination. A person applying to take an underground tank system installer certification examination shall submit all of the following:
ATCP 93.240(17)(b)1.1. An application in accordance with sub. (2).
ATCP 93.240(17)(b)2.2. An application fee and examination fee in accordance with subs. (2) and (3) and Table 93.240.
ATCP 93.240(17)(c)(c) Examination. A person seeking to obtain an underground tank system installer certification shall take and pass an examination in accordance with sub. (9).
ATCP 93.240(17)(d)(d) Application for certification. Upon notification of successfully passing the examination for an underground tank system installer certification, a person may obtain the certification by submitting an application and the certification fee in accordance with subs. (2) and (3).
ATCP 93.240(17)(e)(e) Responsibilities. A person who installs or supervises the installation of tanks as a certified underground tank system installer shall be present at the job site for at least all of the following activities:
ATCP 93.240(17)(e)1.1. Preinstallation tank system testing.
ATCP 93.240(17)(e)2.2. Inspection and repair of coatings.
ATCP 93.240(17)(e)3.3. Placing of bedding material and the setting and bedding of tanks.
ATCP 93.240(17)(e)4.4. Backfilling operations and compacting of backfill around tanks and piping.
ATCP 93.240(17)(e)5.5. Installation or activation of department-accepted, factory-supplied cathodic protection systems.
ATCP 93.240 NoteNote: The department of agriculture, trade and consumer protection has accepted factory-supplied cathodic protection systems that comply with the sti-P3Ò specifications from the Steel Tank Institute, and may accept other systems of this type.
ATCP 93.240(17)(e)6.6. Installation and testing of all connections and tank-related piping including vapor recovery, vents and supply pipes.
ATCP 93.240(17)(e)7.7. Installation of leak detection devices and any monitoring wells.
ATCP 93.240(17)(e)8.8. Testing of tanks and piping both prior to and after backfilling.
ATCP 93.240(17)(e)9.9. Installation of pumps.
ATCP 93.240(17)(f)(f) Renewal.
ATCP 93.240(17)(f)1.a.a. A person may renew a certification as an underground tank system installer.
ATCP 93.240(17)(f)1.b.b. An underground tank system installer certification shall be renewed in accordance with sub. (7).
ATCP 93.240(17)(f)2.a.a. The renewal of a certification as an underground tank system installer shall be contingent upon the installer obtaining at least 12 hours of acceptable continuing education prior to the expiration date of the certification as specified in sub. (8) and Table 93.240 except as provided in subd. 2. b.
ATCP 93.240(17)(f)2.b.b. A person who holds a certification as an underground tank system installer may apply to the department for waiver of the continuing education requirements under subd. 2. a. on the grounds of prolonged illness or disability or similar circumstances. Each application for waiver shall be considered individually on its merits by the department.
ATCP 93.240(18)(18)Underground tank system liners.
ATCP 93.240(18)(a)(a) General. No person may line, reline, or perform the lining inspection of an underground tank system that has held or will hold flammable or combustible liquids which are regulated under this chapter unless the person complies with one of the following:
ATCP 93.240(18)(a)1.1. The person holds a certification issued by the department as a certified tank system liner.
ATCP 93.240(18)(a)2.2. The person is under the direct supervision of another person who holds a certification issued by the department as a certified tank system liner.
ATCP 93.240(18)(b)(b) Application for examination. A person applying to take a tank system liner certification examination shall submit all of the following:
ATCP 93.240(18)(b)1.1. An application in accordance with sub. (2).
ATCP 93.240(18)(b)2.2. An application fee and examination fee in accordance with Table 93.240.
ATCP 93.240(18)(c)(c) Examination. A person seeking to obtain a tank system liner certification shall take and pass an examination in accordance with sub. (9).
ATCP 93.240(18)(d)(d) Application for certification. Upon notification of successfully passing the examination for a tank system liner certification, a person may obtain the certification by submitting an application and the certification fee in accordance with sub. (2).
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.