This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
295.66   Cessation of mining or reclamation.
295.67   Determination of abandonment of mining.
295.68   Certificates of completion and release of security.
295.69   Termination of proof of financial responsibility for long-term care of mining waste site.
295.695   Inspections by the department.
295.73   Fees.
295.75   Effect of other laws.
295.77   Review.
295.78   Mining and reclamation; orders.
295.79   Enforcement; penalties.
NONMETALLIC MINING RECLAMATION
Subch. I of ch. 295 Cross-referenceCross-reference: See also ch. NR 135, Wis. adm. code.
295.11295.11Definitions. In this subchapter:
295.11(1)(1)“Department” means the department of natural resources.
295.11(2)(2)“Environmental pollution” means the contaminating or rendering unclean or impure the air, land or waters of the state, or making the same injurious to public health, harmful for commercial or recreational use, or deleterious to fish, bird, animal or plant life.
295.11(3)(3)“Nonmetallic mining” means all of the following:
295.11(3)(a)(a) Operations or activities for the extraction from the earth for sale or use by the operator of mineral aggregates or nonmetallic minerals such as stone, sand, gravel, asbestos, beryl, clay, feldspar, peat, talc and topsoil, including such operations or activities as excavation, grading and dredging.
295.11(3)(b)(b) On-site processes that are related to the extraction of mineral aggregates or nonmetallic minerals, such as stockpiling of materials, blending mineral aggregates or nonmetallic minerals with other mineral aggregates or nonmetallic minerals, crushing, screening, scalping and dewatering.
295.11(4)(4)“Nonmetallic mining reclamation” means the rehabilitation of a nonmetallic mining site to achieve a land use specified in an approved nonmetallic mining reclamation plan, including removal or reuse of nonmetallic mining refuse, grading of the nonmetallic mining site, removal, storage and replacement of topsoil, stabilization of soil conditions, reestablishment of vegetative cover, control of surface water and groundwater, prevention of environmental pollution and, if practical, restoration of plant, fish and wildlife habitat.
295.11(5)(5)“Nonmetallic mining refuse” means waste soil, rock, mineral and other natural material resulting from nonmetallic mining. This term does not include marketable by-products resulting directly from or displaced by the nonmetallic mining.
295.11(6)(6)
295.11(6)(a)(a) “Nonmetallic mining site” means all of the following, except as provided in par. (b):
295.11(6)(a)1.1. The location where nonmetallic mining is proposed or conducted.
295.11(6)(a)2.2. Storage and processing areas that are in or contiguous to areas excavated for nonmetallic mining.
295.11(6)(a)3.3. Areas where nonmetallic mining refuse is deposited.
295.11(6)(a)4.4. Areas disturbed by activities such as the construction or improvement of private roads or haulageways for nonmetallic mining.
295.11(6)(a)5.5. Areas where grading or regrading is necessary to conduct nonmetallic mining or to achieve a land use specified in an approved nonmetallic mining reclamation plan.
295.11(6)(b)(b) “Nonmetallic mining site” does not include any area described in par. (a) 1. to 5. that is not used for nonmetallic mining or for purposes related to nonmetallic mining on or after October 14, 1997.
295.11(7)(7)“Operator” means any person who is engaged in, or who has applied for a permit to engage in, nonmetallic mining, whether individually, jointly or through subsidiaries, agents, employees, contractors or subcontractors.
295.11(8)(8)“Person” means an individual, owner, operator, corporation, limited liability company, partnership, association, municipality, interstate agency, state agency or federal agency.
295.11(9)(9)“Replacement of topsoil” means the replacement of the topsoil that was removed or disturbed by nonmetallic mining, or the provision of material to substitute for the topsoil that was removed or disturbed, for the purposes of providing adequate vegetative cover and stabilization of soil conditions to achieve a land use specified in an approved nonmetallic mining reclamation plan.
295.11(10)(10)“Solid waste” means any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant or air pollution control facility and other discarded or salvageable materials, including solid, liquid, semisolid, or contained gaseous materials resulting from industrial, commercial, mining and agricultural operations, and from community activities, but does not include solids or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return flows or industrial discharges which are point sources subject to permits under ch. 283, or source material, as defined in s. 254.31 (10), special nuclear material, as defined in s. 254.31 (11), or by-product material, as defined in s. 254.31 (1).
295.11 HistoryHistory: 1995 a. 227 s. 801, 995; 1997 a. 27; 1999 a. 9.
295.11 Cross-referenceCross-reference: See also s. NR 135.03, Wis. adm. code.
295.12295.12Nonmetallic mining reclamation rules.
295.12(1)(1)Rules. The department shall establish all of the following by rule:
295.12(1)(a)(a) Uniform statewide standards for nonmetallic mining reclamation.
295.12(1)(b)(b) Provisions for the administration of this subchapter by the department.
295.12(1)(c)(c) Uniform statewide requirements and procedures for the administration of a nonmetallic mining reclamation program by any county, city, village or town.
295.12(2)(2)Standards.
295.12(2)(a)(a) The department shall establish nonmetallic mining reclamation standards under sub. (1) (a) that are applicable to activities related to nonmetallic mining reclamation both during nonmetallic mining and after the termination of nonmetallic mining.
295.12(2)(d)(d) Nonmetallic mining reclamation standards under sub. (1) (a) shall be designed to encourage the development and reclamation of nonmetallic mining sites in existence on October 14, 1997, and shall include requirements necessary to achieve a land use specified in an approved nonmetallic mining reclamation plan, including requirements related to the removal or reuse of nonmetallic mining refuse, removal of roads no longer in use, stabilization of soil conditions, grading the nonmetallic mining site, replacement of topsoil, establishment of vegetative cover, control of surface water flow and groundwater withdrawal, prevention of environmental pollution and, if practical, protection or restoration of plant, fish and wildlife habitat.
295.12(3)(3)Program requirements. The rules required by sub. (1) (c) shall include all of the following:
295.12(3)(c)(c) A requirement for the operator to submit a nonmetallic mining reclamation plan including maps, information about the nonmetallic mining site, a proposed land use for which the nonmetallic mining site will be rehabilitated after the nonmetallic mining is completed, a description of the proposed nonmetallic mining reclamation including methods and procedures to be used and a proposed timetable for completion of various stages of the nonmetallic mining reclamation. The reclamation plan shall be designed to ensure successful nonmetallic mining reclamation consistent with the standards under sub. (1) (a), to minimize the costs of nonmetallic mining reclamation and, to the extent practicable, to minimize the area disturbed by nonmetallic mining at one time and provide for nonmetallic mining reclamation of portions of the nonmetallic mining site while nonmetallic mining continues on other portions of the nonmetallic mining site.
295.12(3)(d)(d) A requirement for the operator to obtain a nonmetallic mining reclamation permit in order to engage in nonmetallic mining or in nonmetallic mining reclamation; a requirement for a permit term equal to the period during which nonmetallic mining is conducted; procedures for the issuance, modification, suspension or revocation of the reclamation permit; a requirement for public notice and an opportunity for a public informational hearing before issuance or modification of a reclamation permit for a nonmetallic mine that is not in operation before the date specified under par. (dm); notwithstanding ss. 68.001, 68.03 (8) and (9), 68.06 and 68.10 (1) (b), a right for any person who meets the requirements of s. 227.42 (1) to a contested case hearing under s. 68.11 on the issuance, modification or denial of a reclamation permit and for a person holding a reclamation permit to a contested case hearing under s. 68.11 to contest an order issued under s. 295.19 (1); a requirement for cooperative issuance of a single reclamation permit if more than one county or municipality has jurisdiction over the nonmetallic mining site; and a requirement that action approving, denying or conditionally approving a reclamation permit be taken within 90 days after receipt of the reclamation plan or, if a public informational hearing is held, within 60 days after the close of the public hearing.
295.12(3)(de)(de) Except as provided in par. (dm), a prohibition on issuance of a reclamation permit before approval of the nonmetallic mining reclamation plan under par. (c) by the county, city, village or town operating the program.
295.12(3)(dm)(dm) A requirement that, when an operator submits an application for a reclamation permit for a nonmetallic mine that is operating before a date specified by the department in the rule, the county, city, village or town issue the permit on the condition that the operator submit a nonmetallic mining reclamation plan under par. (c) that complies with the rules under par. (c) by a deadline established by the county, city, village or town. The deadline shall be from 1 to 3 years after the date of application.
295.12(3)(ds)(ds) A requirement that the county, city, village or town issue a reclamation permit on the condition that the operator submit proof of financial responsibility in accordance with par. (c) within a time specified by the rule.
295.12(3)(e)1.1. A provision imposing annual fees as determined by the department for the administration of s. 295.18 and imposing annual fees as determined by the county, city, village or town that shall, as closely as possible, equal the cost of all of the following:
295.12(3)(e)1.a.a. The examination and approval of nonmetallic mining reclamation plans.
295.12(3)(e)1.b.b. The inspection of nonmetallic mining reclamation.
295.12(3)(e)2.2. A prohibition on basing the fees under subd. 1. on any portion of a nonmetallic mining site that has been reclaimed when the fees are imposed.
295.12(3)(f)(f) A requirement for an expedited review process if the applicant pays an additional fee as determined by the county, city, village or town under par. (e) or if the applicant requires a permit under this subchapter to perform services under contract with a city, village, town, county or other governmental unit.
295.12(3)(g)(g) A requirement for the operator to provide a bond, deposit of funds, established escrow account, letter of credit, demonstration of financial responsibility by meeting net worth requirements or other form of financial assurance conditioned on the faithful performance of all of the requirements of rules promulgated under this section. The rules shall authorize a county, city, village or town to reduce the amount of financial assurance that an operator is required to provide based on nonmetallic mining reclamation that the operator performs while the nonmetallic mine continues to operate.
295.12(3)(h)(h) Provisions to restrict, regulate or require certain activities in connection with nonmetallic mining reclamation in order to ensure compliance with nonmetallic mining reclamation standards, nonmetallic mining reclamation plans, financial assurance requirements and other requirements of the rules promulgated under this section.
295.12(3)(i)(i) A prohibition on nonmetallic mining if a proposed nonmetallic mining site cannot be reclaimed in compliance with the nonmetallic mining reclamation standards under sub. (1) (a).
295.12(3)(k)(k) A provision for orders and penalties consistent with s. 295.19.
295.12(3)(L)(L) Criteria and procedures for approving alternatives to the requirements of the nonmetallic mining reclamation standards under sub. (1) (a).
295.12 HistoryHistory: 1995 a. 227 s. 802; 1997 a. 27.
295.12 Cross-referenceCross-reference: See also ch. NR 135, Wis. adm. code.
295.13295.13Mandatory enactment and administration of ordinance by counties.
295.13(1)(1)Mandatory enactment and administration of ordinance.
295.13(1)(a)(a) Requirement to enact and administer ordinance. Within 6 months after the effective date of the rules under s. 295.12 (1), each county shall enact and begin to administer a nonmetallic mining reclamation ordinance that complies with those rules, except as provided in subs. (2) and (2m). This ordinance may be enacted separately from an ordinance enacted under s. 59.69.
295.13(2)(2)Preexisting county ordinances. Any county with a nonmetallic mining reclamation ordinance in effect on June 1, 1993, may maintain and administer that ordinance if the department reviews the existing ordinance and determines that it is at least as restrictive as the rules under s. 295.12 (1). If the department determines that any part of the existing ordinance is not as restrictive as the rules under s. 295.12 (1), the county may amend the ordinance and submit the amended ordinance to the department for a determination of whether the amended ordinance is as restrictive as those rules. After obtaining the determination of the department that an ordinance is as restrictive as the rules under s. 295.12 (1), the county may not amend the ordinance to make it more restrictive. A county may not amend a nonmetallic mining reclamation ordinance to make it less restrictive than the requirements in the rules under s. 295.12 (1).
295.13(2m)(2m)Option for certain counties. In a county with a population of 700,000 or more, if every city, village and town that contains a nonmetallic mining site has enacted an ordinance under s. 295.14 by the first day of the 4th month beginning after the effective date of the rules promulgated under s. 295.12 (1), the county is not required to enact an ordinance under this section.
295.13(3)(3)Applicability of county ordinance. An ordinance under sub. (1) or (2) applies to the entire area of the county, except for cities, villages and towns that enact and administer a nonmetallic mining reclamation ordinance under s. 295.14.
295.13(4)(4)Crediting of financial assurance. If a nonmetallic mining site is subject to a county ordinance under sub. (1) or (2) and the city, village, or town in which a nonmetallic mining site is located required the operator of the mining site to provide financial assurance for nonmetallic mining reclamation of the nonmetallic mining site, the county shall credit the value of the financial assurance provided to the city, village, or town against the amount of financial assurance that the operator is required to provide under the county ordinance.
295.13 HistoryHistory: 1995 a. 227 s. 803; 1997 a. 27, 35; 2003 a. 308.
295.14295.14Authority to enact and administer ordinance.
295.14(1)(1)Authority to enact and administer ordinance. A city, village or town may enact and administer a nonmetallic mining reclamation ordinance, that complies with the rules under s. 295.12 (1). Except as provided in sub. (2), a city, village or town may not administer a nonmetallic mining reclamation ordinance that does not comply with the rules under s. 295.12 (1).
295.14(2)(2)Preexisting municipal ordinances. A city, village or town with a nonmetallic mining reclamation ordinance in effect on June 1, 1993, may maintain and administer that ordinance if the department reviews the existing ordinance and determines that it is at least as restrictive as the rules under s. 295.12 (1). If the department determines that any part of the existing ordinance is not as restrictive as the rules under s. 295.12 (1), the city, village or town may amend the ordinance and submit the amended ordinance to the department for a determination of whether the amended ordinance is as restrictive as those rules. After obtaining the determination of the department that an ordinance is as restrictive as the rules under s. 295.12 (1), the city, village or town may not amend the ordinance to make it more restrictive. A city, village or town may not amend a nonmetallic mining reclamation ordinance to make it less restrictive than the rules under s. 295.12 (1).
295.14 HistoryHistory: 1995 a. 227 s. 804; 1997 a. 27.
295.15295.15Fees. A county or a city, village or town with a nonmetallic mining reclamation ordinance shall collect the fee established under s. 295.12 (3) (e) and shall forward the state’s portion of the fee to the department within 90 days after collecting the fee. A county or a city, village or town with a nonmetallic mining reclamation ordinance shall use the revenues from its portion of the fees only for the administration of the nonmetallic mining reclamation ordinance.
295.15 HistoryHistory: 1995 a. 227 s. 805.
295.16295.16Applicability of nonmetallic mining reclamation requirements.
295.16(1)(1)Nonmetallic mining for transportation purposes.
295.16(1)(a)(a) Notwithstanding par. (b), any requirements of the department of transportation concerning the restoration of a nonmetallic mining site shall be consistent with the nonmetallic mining reclamation standards established under s. 295.12 (1) (a).
295.16(1)(b)(b) A nonmetallic mining ordinance and the rules promulgated under s. 295.12 (1) do not apply to nonmetallic mining to obtain stone, soil, sand or gravel for the construction, maintenance or repair of a highway, railroad, airport facility or any other transportation facility, if the nonmetallic mining is subject to the requirements of the department of transportation concerning the restoration of the nonmetallic mining site.
295.16(1)(c)(c) The requirements for a nonmetallic mining reclamation plan under s. 295.12 (3) (c), for public notice and an opportunity for a public informational hearing under s. 295.12 (3) (d) and for proof of financial responsibility under s. 295.12 (3) (ds) do not apply to nonmetallic mining to obtain stone, soil, sand or gravel for the construction, maintenance or repair of a highway, railroad, airport facility, or any other transportation facility, conducted under contract with a municipality, as defined in s. 299.01 (8), if the contract requires the nonmetallic mining site to be reclaimed in accordance with the requirements of the department of transportation concerning the restoration of nonmetallic mining sites.
295.16(2)(2)Nonmetallic mining in or near navigable waterways. A nonmetallic mining reclamation ordinance, and requirements of this subchapter other than the standards established under s. 295.12 (1) (a), do not apply to any nonmetallic mining site or portion of a nonmetallic mining site that is subject to permit and reclamation requirements of the department under ss. 30.19, 30.195, 30.20, 30.30 and 30.31. The nonmetallic mining standards established under s. 295.12 (1) (a) do apply to a nonmetallic mining site that is subject to permit and reclamation requirements of the department under ss. 30.19, 30.195, 30.20, 30.30 and 30.31.
295.16(3)(3)Public nonmetallic mining.
295.16(3)(a)(a) The standards established under s. 295.12 (1) (a) and, except as provided in par. (b), a nonmetallic mining reclamation ordinance apply to nonmetallic mining conducted by or on behalf of the state or a municipality. Notwithstanding s. 13.48 (13), nonmetallic mining operated for the benefit or use of the state or any state agency, board, commission or department shall comply with the permit requirements and nonmetallic mining reclamation standards of any applicable nonmetallic mining reclamation ordinance.
295.16(3)(b)(b) The financial assurance requirements of a nonmetallic mining reclamation ordinance do not apply to nonmetallic mining conducted by the state or a municipality.
295.16(4)(4)Exempt activities. A nonmetallic mining reclamation ordinance and the standards established under s. 295.12 (1) (a) do not apply to the following activities:
295.16(4)(a)(a) Excavations or grading by a person solely for domestic or farm use at his or her residence or farm.
295.16(4)(b)(b) Excavations or grading conducted for the construction, reconstruction, maintenance or repair of a highway, railroad, airport facility or any other transportation facility if the excavation or grading is within the property boundaries of the transportation facility.
Loading...
Loading...
2023-24 Wisconsin Statutes updated through all Supreme Court and Controlled Substances Board Orders filed before and in effect on January 1, 2025. Published and certified under s. 35.18. Changes effective after January 1, 2025, are designated by NOTES. (Published 1-1-25)