292.63(3)(c)(c) Investigations, remedial action plans and remedial action activities. Before submitting an application under par. (f), except as provided under par. (g), an owner or operator or the person shall do all of the following: 292.63(3)(c)1.1. Complete an investigation to determine the extent of environmental damage caused by a discharge from a petroleum product storage system or home oil tank system. 292.63(3)(c)2.2. Prepare a remedial action plan that identifies specific remedial action activities proposed to be conducted under subd. 3. and submit the remedial action plan to the department. 292.63(3)(c)3.3. Conduct all remedial action activities at the site of the discharge from the petroleum product storage system or home oil tank system necessary to restore the environment to the extent practicable and minimize the harmful effects from the discharge as required under s. 292.11. 292.63(3)(c)4.4. Receive written approval from the department that the remedial action activities performed under subd. 3. meet the requirements of s. 292.11. 292.63(3)(cm)(cm) Monitoring as remedial action. An owner or operator or person owning a home oil tank system may, with the approval of the department, satisfy the requirements of par. (c) 2. and 3. by proposing and implementing monitoring to ensure the effectiveness of natural attenuation of petroleum product contamination. 292.63(3)(cp)1.1. Except as provided in subds. 2. and 5., if the department estimates that the cost to complete a site investigation, remedial action plan and remedial action for an occurrence exceeds $60,000, the department shall implement a competitive public bidding process to obtain information to assist in making the determination under par. (cs). 292.63(3)(cp)2.2. The department may waive the requirement under subd. 1. if an enforcement standard is exceeded in groundwater within 1,000 feet of a well operated by a public utility, as defined in s. 196.01 (5), or within 100 feet of any other well used to provide water for human consumption. 292.63(3)(cp)5.5. The department may waive the requirement under subd. 1. after providing notice to the secretary of administration. 292.63(3)(cp)6.6. The department may disqualify a bid received under subd. 1. if, based on information available to the department and experience with remedial action at other sites, the bid is unlikely to establish an amount to sufficiently fund remedial action that will comply with par. (c) 3. and with enforcement standards. 292.63(3)(cp)7.7. The department may disqualify a person from submitting bids under subd. 1. if, based on past performance of the bidder, the department determines that the person has demonstrated an inability to complete remedial action within established cost limits. 292.63(3)(cs)(cs) Determination of least costly method of remedial action. 292.63(3)(cs)1.1. The department shall review the remedial action plan for a site and shall determine the least costly method of complying with par. (c) 3. and with enforcement standards. The department shall notify the owner or operator of its determination of the least costly method and shall notify the owner or operator that reimbursement for remedial action under this section is limited to the amount necessary to implement that method. 292.63(3)(cs)3.3. In making determinations under subd. 1., the department shall determine whether natural attenuation will achieve compliance with par. (c) 3. and with enforcement standards. 292.63(3)(cs)4.4. The department may review and modify an amount established under subd. 1. if the department determines that new circumstances, including newly discovered contamination at a site, warrant those actions. 292.63(3)(cw)1.1. The department shall conduct the annual review required under sub. (2) (i) 1. for a site and shall determine the least costly method of completing remedial action at the site in order to comply with par. (c) 3. and with enforcement standards. The department shall notify the owner or operator of its determination of the least costly method and shall notify the owner or operator that reimbursement under this section for any remedial action conducted after the date of the notice is limited to the amount necessary to implement that method. 292.63(3)(cw)3.3. In making determinations under subd. 1., the department shall determine whether natural attenuation will achieve compliance with par. (c) 3. and with enforcement standards. 292.63(3)(cw)4.4. The department may review and modify an amount established under subd. 1. if the department determines that new circumstances, including newly discovered contamination at a site, warrant those actions. 292.63(3)(d)(d) Final review of remedial action activities. The department shall complete a final review of the remedial action activities within 60 days after the claimant notifies the department that the remedial action activities are completed. 292.63(3)(f)(f) Application. A claimant shall submit a claim on a form provided by the department. The claim shall contain all of the following documentation of activities, plans and expenditures associated with the eligible costs incurred because of a petroleum products discharge from a petroleum product storage system: 292.63(3)(f)1.1. A record of investigation results and data interpretation. 292.63(3)(f)3.3. Contracts for eligible costs incurred because of the discharge and records of the contract negotiations. 292.63(3)(f)4.4. Accounts, invoices, sales receipts or other records documenting actual eligible costs incurred because of the discharge. 292.63(3)(f)6.6. Other records and statements that the department determines to be necessary to complete the application. 292.63(3)(g)(g) Emergency situations. Notwithstanding pars. (a) 3. and (c) 1. and 2., an owner or operator or the person may submit a claim for an award under sub. (4) after notifying the department under par. (a) 3., without completing an investigation under par. (c) 1. and without preparing a remedial action plan under par. (c) 2., if an emergency existed which made the investigation under par. (c) 1. and the remedial action plan under par. (c) 2. inappropriate and, before conducting remedial action, the owner or operator or person notified the department of the emergency and the department authorized emergency action. 292.63(3)(h)(h) Initial eligibility review. When an owner or operator or the person notifies the department under par. (a) 3., the department shall provide the owner or operator or the person with information on the program under this section and the department’s estimate of the eligibility of the owner or operator or of the person for an award under this section. 292.63(4)(4) Awards for petroleum product investigation, remedial action planning and remedial action activities. 292.63(4)(a)1.1. If the department finds that the claimant meets all of the requirements of this section and any rules promulgated under this section, the department shall issue an award to reimburse a claimant for eligible costs incurred because of a petroleum products discharge from a petroleum product storage system or home oil tank system. 292.63(4)(a)2.2. The department may not issue an award before all eligible costs have been incurred and written approval is received under sub. (3) (c) 4., except as follows: 292.63(4)(a)2.a.a. The department may issue an award before all eligible costs have been incurred and written approval is received under sub. (3) (c) 4. if the department determines that the delay in issuing the award would cause a financial hardship to the owner or operator or the person. 292.63(4)(a)2.b.b. The department shall issue an award if the owner or operator or the person has incurred at least $50,000 in unreimbursed eligible costs and has not submitted a claim during the preceding 12 months. 292.63(4)(a)5.5. The department shall review claims related to home oil tank discharges as soon as the claims are received. The department shall issue an award for an eligible home oil tank discharge as soon as it completes the review of the claim. 292.63(4)(a)5m.5m. The department shall review claims related to discharges from farm tanks described in par. (ei) as soon as the claims are received. The department shall issue an award for an eligible discharge from a farm tank described in par. (ei) as soon as it completes the review of the claim. 292.63(4)(a)6.6. In any fiscal year, the department may not award more than 5 percent of the amount appropriated under s. 20.370 (6) (fr) as awards for petroleum product storage systems described in par. (ei). 292.63(4)(a)7.7. In any fiscal year, the department may not award more than 5 percent of the amount appropriated under s. 20.370 (6) (fr) as awards for petroleum product storage systems that are owned by school districts and that are used for storing heating oil for consumptive use on the premises where stored. 292.63(4)(a)8.8. If an owner or operator or person owning a home oil tank system is conducting approved remedial action activities that were necessitated by a petroleum product discharge from a petroleum product storage system or home oil tank system and those remedial action activities have not remedied the discharge, then the department may approve financial assistance under this section for enhancements to the approved remedial action activities or different remedial action activities that the department determines will remedy the discharge without increasing the overall costs of remedying the discharge. The total amount of an original award under this section plus additional financial assistance provided under this subdivision is subject to the limits in pars. (d) to (e), (ei) and (em) on amounts of awards. 292.63(4)(b)(b) Eligible costs. Except as provided in par. (c) or (cc), eligible costs for an award under par. (a) include actual costs or, if the department establishes a usual and customary cost under par. (cm) for an item, usual and customary costs for the following items: 292.63(4)(b)1.1. Testing to determine tightness of tanks and lines if the method used is approved by the department. 292.63(4)(b)2.2. Removal of petroleum products from surface waters, groundwater or soil. 292.63(4)(b)3.3. Investigation and assessment of contamination caused by a petroleum product storage system or a home oil tank system. 292.63(4)(b)9.9. Maintenance of equipment for petroleum product recovery or remedial action activities. 292.63(4)(b)10.10. Restoration or replacement of a private or public potable water system. 292.63(4)(b)14.14. Other costs identified by the department as necessary for proper investigation, remedial action planning and remedial action activities to meet the requirements of s. 292.11. 292.63(4)(b)15.15. For an owner or operator only, compensation to 3rd parties for bodily injury and property damage caused by a petroleum products discharge from an underground petroleum product storage tank system. 292.63 Cross-referenceCross-reference: See also s. Ins 6.35, Wis. adm. code. 292.63(4)(c)(c) Exclusions from eligible costs. Eligible costs for an award under par. (a) do not include the following, regardless of whether a competitive bidding process is used: 292.63(4)(c)2.2. Costs of retrofitting or replacing a petroleum product storage system or home oil tank system. 292.63(4)(c)3.3. Other costs that the department determines to be associated with, but not integral to, the eligible costs incurred because of a petroleum products discharge from a petroleum product storage system or home oil tank system. 292.63(4)(c)4.4. Costs, other than costs for compensating 3rd parties for bodily injury and property damage, which the department determines to be unreasonable or unnecessary to carry out the remedial action activities as specified in the remedial action plan. 292.63(4)(c)5.5. Costs for investigations or remedial action activities conducted outside this state. 292.63(4)(c)7.7. Costs of emptying, cleaning and disposing of the tank and other costs normally associated with closing or removing any petroleum product storage system or home oil tank system unless those costs were incurred before November 1, 1991, or unless the claimant had signed a contract for services for activities required under sub. (3) (c) or a loan agreement, note or commitment letter for a loan for the purpose of conducting activities required under sub. (3) (c) before November 1, 1991. 292.63(4)(c)8.8. Interest costs incurred by an applicant that exceed interest at the following rate: 292.63(4)(c)8.a.a. If the applicant has gross revenues of not more than $25,000,000 in the most recent tax year before the applicant submits a claim, 1 percent under the prime rate. 292.63(4)(c)8.d.d. If the applicant has gross revenues of more than $25,000,000 in the most recent tax year before the applicant submits a claim, 4 percent. 292.63(4)(c)9.9. Loan origination fees incurred by an applicant that exceed 2 percent of the principal amount of the loan. 292.63(4)(c)11.11. Costs that exceed the amount necessary to comply with sub. (3) (c) 3. and with enforcement standards using the least costly method. 292.63(4)(c)12.12. Costs that are incurred after the date of a notice under sub. (3) (cw) 1. and that exceed the amount necessary to comply with sub. (3) (c) 3. and with enforcement standards using the method specified in the notice. 292.63(4)(cc)1.a.a. Except as provided in subd. 1m. or 2., if an applicant’s final claim is submitted more than 120 days after receiving written notification that no further remedial action is necessary with respect to the discharge, interest costs incurred by the applicant after the 60th day after receiving that notification are not eligible costs. 292.63(4)(cc)1.c.c. Except as provided in subd. 2., if an applicant does not complete the investigation of the petroleum product discharge by the first day of the 61st month after the month in which the applicant notified the department under sub. (3) (a) 3. or October 1, 2003, whichever is later, interest costs incurred by the applicant after the later of those days are not eligible costs. 292.63(4)(cc)1m.1m. If an applicant received written notification that no further remedial action is necessary with respect to a discharge before September 1, 2001, and the applicant’s final claim is submitted more than 120 days after September 1, 2001, interest costs incurred by the applicant after the 120th day after September 1, 2001, are not eligible costs. 292.63(4)(cc)2.a.a. An applicant that is a local unit of government, if federal or state financial assistance other than under this section, has been provided for that expansion or redevelopment. 292.63(4)(cc)2.b.b. An applicant that is engaged in the expansion or redevelopment of brownfields, as defined in s. 238.13 (1) (a), if federal or state financial assistance other than under this section, has been provided for that expansion or redevelopment. 292.63(4)(ce)(ce) Eligible cost; service providers. The department may promulgate rules under which the department selects service providers to provide investigation or remedial action services in specified areas. The rules may provide that the costs of a service for which the department has selected a service provider in an area are not eligible costs under par. (b), or that eligible costs are limited to the amount that the selected service provider would have charged, if an owner or operator of a petroleum product storage system located in that area, or a person owning a home oil tank system located in that area, uses a service provider other than the service provider selected by the department to perform the services. If the department selects service providers under this paragraph, it shall regularly update the list of service providers that it selects. 292.63(4)(cm)(cm) Usual and customary costs. The department shall establish a schedule of usual and customary costs for items under par. (b) that are commonly associated with claims under this section. The department shall use that schedule to determine the amount of eligible costs for an occurrence for which a competitive bidding process is not used, except in circumstances under which higher costs must be incurred to comply with sub. (3) (c) 3. and with enforcement standards. For an occurrence for which a competitive bidding process is used, the department may not use the schedule. In the schedule, the department shall specify the maximum number of reimbursable hours for particular tasks and the maximum reimbursable hourly rates for those tasks. The department shall use methods of data collection and analysis that enable the schedule to be revised to reflect changes in actual costs. 292.63(4)(d)1.1. The department shall issue an award under this paragraph for a claim filed after July 31, 1987, for eligible costs, under par. (b), incurred on or after August 1, 1987, and before December 22, 2001, by the owner or operator of an underground petroleum product storage tank system and for eligible costs, under par. (b), incurred on or after December 22, 2001, by the owner or operator of an underground petroleum product storage tank system if the petroleum product discharge on which the claim is based is confirmed and activities under sub. (3) (c) or (g) are begun before December 22, 2001. 292.63(4)(d)2.2. The department shall issue the award under this paragraph without regard to fault in an amount equal to the amount of the eligible costs that exceeds the deductible amount under par. (dg). An award issued under this paragraph may not exceed the following for each occurrence: 292.63(4)(d)2.a.a. For an owner or operator of an underground petroleum product storage tank system that is located at a facility at which petroleum is stored for resale or an owner or operator of an underground petroleum product storage tank system that handles an annual average of more than 10,000 gallons of petroleum per month, $1,000,000. 292.63(4)(d)2.c.c. For an owner or operator of a petroleum product storage system described in par. (ei), $100,000.
/statutes/statutes/292
true
statutes
/statutes/statutes/292/ii/63/3/h
Chs. 279-299, Natural Resources
statutes/292.63(3)(h)
statutes/292.63(3)(h)
section
true