196.495196.495Avoidance of duplication in electric facilities.
196.495(1)(a)(a) In this section:
196.495(1)(a)1.1. “Primary voltage extension” means an extension of 500 feet or more.
196.495(1)(a)2.2. “Secondary voltage extension” means an extension that is less than 500 feet.
196.495(1)(b)(b) The length of an extension shall be measured as the air line distance between an existing local service distribution line that normally operates at less than 35 kilovolts and the nearest point on the principal building or facility to be served by a primary voltage extension or a secondary voltage extension.
196.495(1m)(1m)No public utility, and no cooperative association organized under ch. 185 for the purpose of furnishing electric service to its members only, may:
196.495(1m)(a)(a) Extend or render electric service directly or indirectly to the premises of any person already receiving electric service directly or indirectly from another public utility or another cooperative association.
196.495(1m)(b)(b) Make a primary voltage extension to serve the premises of any person not receiving electric service and to which service is available from the facilities of another public utility or another such cooperative association through a secondary voltage extension, unless the other public utility or cooperative association consents to the primary voltage extension in writing or unless the commission, after notice to the interested parties and hearing, determines that the service rendered or to be rendered by the other public utility or cooperative association is inadequate and is not likely to be made adequate, or that the rates charged for service are unreasonable and are not likely to be made reasonable.
196.495(2)(2)If a public utility is rendering electric service under an indeterminate permit to a city or village, no cooperative association may extend any new electric service to the premises of any person inside the corporate limits, existing on January 1, 1961, of the city or village without the written consent of the public utility. Within any area annexed to a city or village after January 1, 1961, in which annexed area a cooperative association or public utility, other than the public utility serving the city or village under an indeterminate permit, has electric distribution facilities at the time of the annexation, the cooperative association or other public utility may make a primary voltage extension or a secondary voltage extension in the annexed area, subject to sub. (1m).
196.495(2m)(2m)The distribution service facilities of a cooperative association or public utility rendering electric service in an annexed area under sub. (2) shall be subject to acquisition under ch. 197 by a city or village if the city or village operates or proposes to operate its own electric public utility.
196.495(3)(3)Nothing in this section shall preclude any public utility or any cooperative association from extending electric service to its own property or facilities or to another cooperative association for resale.
196.495(4)(4)To avoid duplication of facilities, a public utility and a cooperative association may enter into a written agreement governing the extension of electric distribution lines and the right to serve customers. The commission shall enforce an agreement if the agreement has been filed with the commission and approved by the commission as being in the public interest.
196.495(5)(5)If an interested party files a complaint with the commission that an electric public utility or a cooperative association has made a primary voltage extension that requires approval or consent under this section without obtaining approval or consent, the commission shall hear the complaint upon notice to the interested parties. If the commission determines that the primary voltage extension was made in violation of this section, it shall order the prompt removal of the primary voltage extension.
196.495(6)(6)A cooperative association shall be subject to the authority of the commission to enforce the provisions of this section and to issue rules and orders relating to the provisions.
196.495(7)(7)A cooperative association shall be subject to the authority of the commission to allocate, assess and collect expenditures of the commission against a cooperative association involved in a proceeding under this section in the same manner as provided for public utilities under s. 196.85.
196.495 HistoryHistory: 1971 c. 125 s. 521; 1983 a. 53; 1991 a. 94.
196.495 Cross-referenceCross-reference: See also s. PSC 112.08, Wis. adm. code.
196.495 AnnotationAlthough one utility was serving a farm, when the farm was annexed to a city and a large shopping center was built, the utility having an indeterminate permit to serve the city could not be barred from serving the area; the PSC should determine which utility should serve the area. Adams-Marquette Electric Cooperative v. PSC 51 Wis. 2d 718, 188 N.W.2d 515 (1971).
196.495 AnnotationThe “premises of a person already receiving electrical service” refers to the premises to be served, not the person. Adams-Marquette Electric Cooperative v. PSC 51 Wis. 2d 718, 188 N.W.2d 515 (1971).
196.495 AnnotationThe application of this section is discussed. A court’s order to a utility violating this section to remove the offending line or sell it to the utility who should have provided the service was within the authority granted by sub. (5). Barron Electric Cooperative v. PSC, 212 Wis. 2d 752, 569 N.W.2d 726 (Ct. App. 1997), 97-0420.
196.496196.496Distributed generation facilities.
196.496(1)(1)Definition. In this section, “distributed generation facility” means a facility for the generation of electricity with a capacity of no more than 15 megawatts that is located near the point where the electricity will be used or is in a location that will support the functioning of the electric power distribution grid.
196.496(2)(2)Rules. The commission shall promulgate rules establishing standards for the connection of distributed generation facilities to electric distribution facilities. To the extent technically feasible and cost effective, the standards shall be uniform and shall promote the development of distributed generation facilities. The standards shall address engineering, electric reliability, and safety concerns and the methods for determining charges for interconnection.
196.496 HistoryHistory: 2001 a. 16.
196.496 Cross-referenceCross-reference: See also ch. PSC 119, Wis. adm. code.
196.497196.497State policy regarding the long-term disposal of high-level radioactive waste and transuranic waste.
196.497(1)(1)Definitions. As used in this section unless the context requires otherwise:
196.497(1)(b)(b) “Federal department of energy” means the federal department of energy or any successor agency assigned responsibility for the long-term disposal of high-level radioactive waste and transuranic waste.
196.497(1)(c)(c) “High-level radioactive waste” means:
196.497(1)(c)1.1. Fuel that is withdrawn from a nuclear reactor after irradiation and which is packaged and prepared for disposal; or
196.497(1)(c)2.2. Highly radioactive waste resulting from reprocessing irradiated nuclear fuel including both the liquid waste which is produced directly in reprocessing and any solid material into which the liquid waste is transformed.
196.497(1)(d)(d) “Transuranic waste” means waste material containing alpha-emitting radioactive elements having an atomic number greater than 92 in concentrations greater than 10 nanocuries per gram.
196.497(2)(2)Coordination.
196.497(2)(a)(a) Initial agency to be contacted. The commission shall serve as the initial agency in this state to be contacted by the federal department of energy or any other federal agency on any matter related to the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(2)(b)(b) Receipt of information. The commission shall serve as the initial agency in this state to receive any report, study, document, information or notification of proposed plans from the federal department of energy or any other federal agency on any matter related to the long-term disposal of high-level radioactive waste or transuranic waste. Notification of proposed plans include notification of proposals to conduct field work, on-site evaluation, on-site testing or similar activities.
196.497(2)(c)(c) Dissemination of information. The commission shall disseminate or arrange with the federal department of energy or other federal agency to disseminate information received under par. (b) to appropriate state agencies, local units of government, regional planning commissions, American Indian tribal governing bodies, the general public, interested citizen groups and persons who have requested in writing to receive this information.
196.497(2)(d)(d) Response. The commission shall respond to contacts under par. (a) and information received under par. (b) if a response is appropriate. The commission shall consult with appropriate state agencies, local units of government, regional planning commissions, American Indian tribal governing bodies, the general public and interested citizen groups in preparing this response.
196.497(3)(3)Advocate. The commission shall serve as an advocate on behalf of the citizens of this state before the federal department of energy and other federal agencies on matters related to the long-term disposal of radioactive waste and transuranic waste.
196.497(5)(5)Review of applications for federal funds. The commission shall review any application to the federal department of energy or other federal agency by a state agency, local unit of government or regional planning commission for funds for any program related to the long-term disposal of high-level radioactive waste or transuranic waste. If the commission finds that the application is not consistent with the commission’s policy related to the long-term disposal of high-level radioactive waste or transuranic waste or that the application is not in the best interest of the state, the commission shall forward its findings to the governor, the joint committee on finance and the federal agency to which the application for funds is being made. If the commission finds that the application of a state agency is not consistent with the commission’s policy related to the long-term disposal of high-level radioactive waste or transuranic waste or that the application of a state agency is not in the best interest of the state, the findings forwarded to the governor shall include a recommendation that the governor act under s. 16.54 (1) and stipulate conditions for the acceptance of the funds which are necessary to safeguard the interests of the state.
196.497(6)(6)Monitor federal activity. The commission shall monitor activity in congress and the federal government related to the long-term disposal of high-level radioactive waste and transuranic waste. The commission may advise the congressional delegation from this state of action which is needed to protect the interests of the state.
196.497(7)(7)Request attorney general to intervene. If appropriate the commission shall request the attorney general to intervene in federal proceedings to protect the state’s interests and present the state’s point of view on matters related to the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(8)(8)Negotiation of agreements.
196.497(8)(a)(a) Negotiations with the federal department of energy. The commission shall serve as the agency in this state to negotiate written agreements and modifications to these agreements, with the federal department of energy on any matter related to the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(8)(b)(b) Negotiations with other federal agencies. The commission shall serve as the agency in this state to negotiate written agreements and modifications to these agreements, with any federal agency other than the federal department of energy on any matter related to the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(8)(d)(d) Hearings. The commission shall conduct public hearings on any proposed agreement or modification to an agreement negotiated under par. (a) or (b). The commission shall provide 30 days’ notice of the date and location of hearings conducted under this paragraph. The commission shall prepare a written summary of testimony presented at hearings conducted under this paragraph and shall consider the need for modifications to the negotiated agreement as a result of the hearings.
196.497(8)(f)(f) Approval of agreements and modifications by the legislature and governor. No agreement or modification to an agreement negotiated under par. (a) or (b) may take effect unless it is approved under sub. (10).
196.497(8)(g)(g) Technical revisions. The commission may negotiate what in the commission’s judgment are technical revisions to any agreement approved under sub. (10).
196.497(8)(i)(i) Review of technical revisions by the legislature and governor. No technical revision to an agreement negotiated under par. (g) may take effect unless it is considered approved under sub. (11).
196.497(9)(9)Agreements with the federal department of energy.
196.497(9)(a)(a) Separate agreements. The commission may negotiate separate agreements with the federal department of energy concerning different stages of the process of evaluating and selecting a site for the long-term disposal of high-level radioactive waste or transuranic waste. The commission shall negotiate a separate agreement with the federal department of energy for the final stages of the selection of any site for the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(9)(b)(b) Contents. Any agreement negotiated by the commission with the federal department of energy under sub. (8) (a) shall include all of the following:
196.497(9)(b)1.1. A general description of the roles of the state and the federal department of energy.
196.497(9)(b)2.2. A compliance schedule which includes a list of significant events and stages which are expected to be reached as the federal department of energy assesses the suitability of the state for the long-term disposal of high-level radioactive waste or transuranic waste and a description of the actions to be taken by the federal department of energy and the state at each event and stage.
196.497(9)(b)3.3. The criteria that the department of energy shall use in evaluating the suitability of any site in the state for the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(9)(b)4.4. A requirement that the federal department of energy shall comply with all federal laws, American Indian laws, state laws and local ordinances and shall respect state sovereignty consistent with the 10th amendment to the U.S. constitution and the U.S. constitution, regardless of the ownership of the land on which the activity takes place.
196.497(9)(b)5.5. A requirement that the federal department of energy and any of its contractors or subcontractors shall provide the commission with all reports and documents the commission requests and any other relevant reports and documents in a timely manner and in accordance with any applicable law, regulation or rule. The requirement shall specify that the federal department of energy may not charge a fee for searching for or for supplying reports and documents requested by the commission. The requirement shall specify that the federal department of energy shall provide the commission with all reports and documents the commission requests and any other relevant reports and documents from contractors and subcontractors after the reports and documents are submitted to the federal department of energy regardless of whether the reports and documents have received the department of energy’s final approval.
196.497(9)(b)6.6. A requirement that, upon request by the commission, the federal department of energy shall provide the data, methods and underlying assumptions used in the preparation of reports and documents in accordance with any applicable law, regulation or rule.
196.497(9)(b)7.7. A requirement that the federal department of energy shall notify the commission of any grants related to the long-term disposal of high-level radioactive waste and transuranic waste from the federal department of energy to any person in this state.
196.497(9)(b)8.8. A requirement that the federal department of energy shall notify the commission in a timely manner of any proposed field work, on-site evaluation, on-site testing or similar activities it or any contractor or subcontractor intends to conduct and a requirement that the federal department of energy shall allow the commission to monitor these activities by designating a reasonable number of persons to observe the activities or by any other appropriate means.
196.497(9)(b)9.9. A requirement that the federal department of energy shall provide the commission in a timely manner with a copy of any requests for proposals and final contracts issued by the federal department of energy relating to the evaluation, selection or construction of a site for the long-term disposal of high-level radioactive waste or transuranic waste in this state.
196.497(9)(b)10.10. A provision that the federal department of energy shall agree to provide funds to be used to review the activities of the federal department of energy and its contractors and subcontractors which relate to assessing the suitability of the state for the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(9)(b)11.11. A process for resolving disputes between the commission and the federal department of energy including disputes concerning alleged violations of the written agreement and disputes concerning technical assessments made by the federal department of energy. The process for resolving disputes concerning technical assessments made by the federal department of energy may involve a process of scientific review and mediation.
196.497(9)(b)12.12. A requirement that if the federal department of energy selects a site in the state for construction of a repository for the long-term disposal of high-level radioactive waste or transuranic waste, the federal department of energy shall prepare, prior to submission of an application to license or construct the repository, a repository plan which shall include descriptions of the federal department of energy’s plans for construction of the repository, transportation of wastes to the repository, operation of the repository, closing of the repository and monitoring the repository after closure.
196.497(9)(c)(c) Objection to site selection. Any agreement negotiated by the commission with the federal department of energy under sub. (8) (a) shall include a list of reasons for which the commission may object to the selection of a site within this state for the long-term disposal of high-level radioactive waste and transuranic waste. These reasons shall include the following:
196.497(9)(c)1.1. The site or the transportation of waste to the site poses a danger to public health and safety or to the environment.
196.497(9)(c)2.2. The federal department of energy fails to address to the satisfaction of the commission the potential socioeconomic effects of the site or of the transportation of waste to the site.
196.497(9)(c)3.3. The federal department of energy violates any written agreement or revision approved under sub. (10) or (11).
196.497(9)(c)4.4. If, in the judgment of the commission, the federal department of energy fails to comply with criteria, regulations or standards of other federal agencies concerning the long-term disposal of high-level radioactive waste or transuranic waste including criteria which excludes a proposed site from consideration because of previous mining or drilling of any type within the area which could be affected by the construction of the site or by the heat resulting from the disposal of high-level radioactive waste or transuranic waste at the site.
196.497(9)(c)5.5. If, in the judgment of the commission, the federal department of energy fails to use generally accepted scientific and technical practices in evaluating the suitability of a site for the long-term disposal of high-level radioactive waste or transuranic waste.
196.497(10)(10)Approval of agreements.
196.497(10)(a)(a) Submission. The commission shall submit any written agreement or modification to an agreement negotiated under sub. (8) (a) or (b), approved by the commission and approved by the federal department of energy or other federal agency to the speaker of the assembly and the president of the senate. The commission shall submit with the agreement or modification a written summary of the hearings held under sub. (8) (d).
196.497(10)(b)(b) Introduction of bill. Upon request of the commission, the speaker of the assembly or the president of the senate shall introduce a bill to approve the agreement or modification to an agreement. The bill is not subject to s. 16.47 (2).
196.497(10)(c)(c) Legislative action required. Within 120 days after the bill is introduced the appropriate committees in each house of the legislature shall authorize an extraordinary session of the legislature to commence within the 120 days and to extend until the legislature passes the bill or passes a joint resolution which disapproves of the agreement or modification and returns the agreement or modification to the commission for renegotiation. If the 120-day period extends beyond the date specified in s. 13.02 (1), the 120-day period is deemed to commence on the first day the succeeding legislature convenes, unless a bill or joint resolution is passed prior to that time.
196.497(10)(d)(d) Veto review. Within 10 days after the bill passes the legislature, the chief clerk of the house of origin shall refer the bill to the governor for executive action. If the governor vetoes the bill, the appropriate committees in each house of the legislature shall schedule a veto review session.
196.497(10)(e)(e) Approval. If the bill is enacted into law, the agreement or modification to the agreement is approved and shall take effect.
196.497(11)(11)Review of technical revisions.
196.497(11)(a)(a) Submission. The commission shall submit any technical revision to a written agreement negotiated under sub. (8) (g), approved by the commission and approved by the federal department of energy or other federal agency, to the presiding officer of each house of the legislature and to the governor.
196.497(11)(b)(b) Referral to standing committees. Each presiding officer shall refer the technical revision to one standing committee within 7 working days after the day on which the revision is received unless the revision is received on or after November 1 of an even-numbered year. If a revision is received on or after November 1 of an even-numbered year, each presiding officer shall refer the revision to one standing committee within 7 days after the first day of the next regular session of the legislature. Each presiding officer shall cause a statement to appear in the journal of the appropriate house that a technical revision to an agreement approved under sub. (10) is submitted for review.
196.497(11)(c)(c) Standing committee review. Either standing committee may object to the technical revision by taking action in executive session within 30 days after the revision is referred to the committee. If a standing committee objects to the revision, it shall submit a written notice of the objection to the presiding officer of that house of the legislature and the presiding officer shall cause the written notice of the objection to appear in the journal of the house.
196.497(11)(d)(d) Review by the governor. The governor may object to the technical revision by taking action within 30 days after the revision is received unless the revision is received on or after November 1 of an even-numbered year. If the revision is received on or after November 1 of an even-numbered year, the governor may object to the revision by taking action within 30 days after the first day of the next regular session of the legislature. If the governor objects to the revision, the governor shall submit a written notice of the objection to the presiding officer of each house of the legislature and each presiding officer shall cause the written notice of the objection to appear in the journal of each house.
196.497(11)(e)(e) Objection. A standing committee to which a revision is referred or the governor may object to a technical revision for any reason including a belief that the revision is so substantial that the revised agreement should be approved under sub. (10) rather than this subsection. If either standing committee to which a revision is referred or the governor objects to a technical revision within the 30-day review period, the revision may not take effect.
196.497(11)(f)(f) No objection. If neither standing committee nor the governor objects to a technical revision within the 30-day review period, the revision is considered approved and shall take effect.
196.497(11m)(11m)Review of final site selection and site plan.
196.497(11m)(a)(a) Review by the commission. If the federal department of energy selects a site in the state for construction of a repository for the long-term disposal of high-level radioactive or transuranic waste, the commission shall review the adequacy of the selected site and of the site plan prepared by the federal department of energy under sub. (9) (b) 12. The review shall include a full scientific review of the adequacy of the selected site and of the site plan. The commission shall utilize recognized experts in conducting its scientific review. The commission shall conduct more than one public hearing on the site plan and shall make available to the public arguments and evidence for and against the site plan. The commission shall provide 30 days’ notice of the date and location of the public hearings. The commission shall solicit comments from appropriate state agencies, local units of government, regional planning commissions, American Indian tribal governing bodies, the general public and interested citizen groups on the adequacy of the selected site and the site plan. The commission shall make these comments available to the public.
196.497(11m)(b)(b) Recommendation to the legislature and the governor. After completing this review, the commission shall submit a recommendation to the speaker of the assembly, the president of the senate and the governor on whether the state should accept the site selected by the federal department of energy and the site plan. The reasons for which the commission may recommend that the legislature and the governor object to the site selection or the site plan, or both, include those specified in sub. (9) (c). The recommendation to the speaker of the assembly and the president of the senate shall be accompanied by a request for the introduction of a bill to approve the site selected and the site plan or by a request for the introduction of a bill to disapprove the site or the site plan or both.
196.497(11m)(c)(c) Introduction of legislation. Upon request of the commission, the speaker of the assembly or the president of the senate shall introduce a bill reflecting the recommendation of the commission on whether to approve or disapprove the site selected by the federal department of energy and the site plan. The bill is not subject to s. 16.47 (2).
196.497(11m)(d)(d) Legislative action required. Within 120 days after the legislation is introduced under par. (c), the appropriate committees in each house of the legislature shall authorize an extraordinary session of the legislature to commence within the 120 days and to extend until the legislature passes a bill which approves the site selected by the federal department of energy and the site plan or the legislature passes a bill which disapproves the site or the site plan or both. If the 120-day period extends beyond the date specified under s. 13.02 (1), the 120-day period is deemed to commence on the first day the succeeding legislature convenes, unless a bill is passed prior to that time.
196.497(11m)(e)(e) Veto review. Within 10 days after the bill passes the legislature, the chief clerk of the house of origin shall refer the bill to the governor for executive action. If the governor vetoes the bill, the appropriate committees in each house of the legislature shall schedule a veto review session.
Loading...
Loading...
2021-22 Wisconsin Statutes updated through 2023 Wis. Act 272 and through all Supreme Court and Controlled Substances Board Orders filed before and in effect on November 8, 2024. Published and certified under s. 35.18. Changes effective after November 8, 2024, are designated by NOTES. (Published 11-8-24)