AB50,1181,113(2) The firearm is stored in a display case that is made with a steel frame that 4is no thinner than 12 gauge, is fitted with a hardened steel lock where the case 5opens to access the firearm, and is fitted either with smash-proof polycarbonate 6panels that are at least one-quarter inch thick or with glass that is protected with a 7security or protective laminate film that is specifically designed to delay entry and 8unauthorized access, with a minimum thickness of at least eight-thousandths of an 9inch, and that includes an anchoring system on all seams of each glass panel and is 10also anchored to the frame. If the location of the retail store is at street level, one of 11the following is also required: AB50,1181,1512(a) Concrete or hardened steel bollards, or other barriers such as security 13planters or other devices with a similar structural integrity of bollards, that protect 14the location’s front entrance, any floor-to-ceiling windows, and any other doors that 15could be breached by a vehicle. AB50,1181,1816(b) Locking steel roll-down doors that are installed on all perimeter doors and 17floor-to-ceiling windows, unless the installation would violate a state or local fire 18code. AB50,1182,219(3) The firearm is secured with a hardened steel rod or cable of at least one-20eighth inch in diameter through the trigger guard of the firearm. The steel rod or 21cable shall be secured with a hardened steel lock that has a shackle. The lock and 22shackle shall be protected or shielded from the use of a bolt cutter, and the rod or 23cable shall be anchored in a manner that prevents the removal of the firearm from
1the premises. If the location of the retail store is at street level, one of the following 2is also required: AB50,1182,63(a) Concrete or hardened steel bollards, or other barriers such as security 4planters or other devices with a similar structural integrity of bollards, that protect 5the location’s front entrance, any floor-to-ceiling windows, and any other doors that 6could be breached by a vehicle. AB50,1182,97(b) Locking steel roll-down doors that are installed on all perimeter doors and 8floor-to-ceiling windows, unless the installation would violate a state or local fire 9code. AB50,1182,1210(4) The firearm is stored in a windowless room that is equipped with a steel 11security door fitted with a deadbolt lock and that does not have a door exposed to 12the outside of the building. AB50,1182,1413(5) The firearm is stored behind a steel roll-down door or security gate, or the 14firearm is secured in a locked steel gun rack by use of a hardened steel bar. AB50,231015Section 2310. 175.60 (7) (d) of the statutes is amended to read: AB50,1182,1716175.60 (7) (d) A fee for a background check that is equal to the fee charged 17under s. 175.35 (2i) (a). AB50,231118Section 2311. 175.60 (9g) (a) 2. of the statutes is amended to read: AB50,1183,1419175.60 (9g) (a) 2. The department shall conduct a criminal history record 20search and shall search its records and conduct a search in the national instant 21criminal background check system to determine whether the applicant is 22prohibited from possessing a firearm under federal law; whether the applicant is 23prohibited from possessing a firearm under s. 941.29; whether the applicant is
1prohibited from possessing a firearm under s. 51.20 (13) (cv) 1., 2007 stats.; 2whether the applicant has been ordered not to possess a firearm under s. 51.20 (13) 3(cv) 1., 51.45 (13) (i) 1., 54.10 (3) (f) 1., or 55.12 (10) (a); whether the applicant is 4subject to an injunction under s. 813.12 or 813.122, or a tribal injunction, as defined 5in s. 813.12 (1) (e), issued by a court established by any federally recognized 6Wisconsin Indian tribe or band, except the Menominee Indian tribe of Wisconsin, 7that includes notice to the respondent that he or she is subject to the requirements 8and penalties under s. 941.29 and that has been filed with the circuit court under s. 9813.128 (3g); whether the applicant is subject to a temporary restraining order or 10injunction under s. 813.124; and whether the applicant is prohibited from 11possessing a firearm under s. 813.123 (5m) or 813.125 (4m); and to determine if the 12court has prohibited the applicant from possessing a dangerous weapon under s. 13969.02 (3) (c) or 969.03 (1) (c) and if the applicant is prohibited from possessing a 14dangerous weapon as a condition of release under s. 969.01. AB50,231215Section 2312. 175.60 (11) (a) 2. f. of the statutes is amended to read: AB50,1183,1816175.60 (11) (a) 2. f. The individual becomes subject to an a temporary 17restraining order or injunction described in s. 941.29 (1m) (f) or is ordered not to 18possess a firearm under s. 813.123 (5m) or 813.125 (4m). AB50,231319Section 2313. 175.60 (15) (b) 4. b. of the statutes is amended to read: AB50,1183,2120175.60 (15) (b) 4. b. A fee for a background check that is equal to the fee 21charged under s. 175.35 (2i) (a). AB50,231422Section 2314. 182.004 (6) of the statutes is amended to read: AB50,1184,623182.004 (6) Stock may be issued and leases made to husband and wife
1spouses, and to the survivor of them, in which event title shall descend the same as 2in like conveyances of real property subject to ch. 766. Otherwise, title to the stock 3and lease shall descend to the persons to whom a homestead of the stockholder 4would descend except as provided in ch. 766. The interest of a tenant in the lease 5and stock shall be exempt from execution to the same extent as a homestead in real 6estate. AB50,23157Section 2315. 182.01 (8) of the statutes is created to read: AB50,1184,108182.01 (8) Information to be provided with business formation filings. 9The department shall provide informational materials and resources on worker 10misclassification to each person who files with the department any of the following: AB50,1184,1111(a) Articles of incorporation under s. 180.0202 or 181.0202. AB50,1184,1212(b) Articles of organization under s. 183.0201. AB50,1184,1313(c) A statement of qualification under s. 178.0901. AB50,1184,1414(d) A certificate of limited partnership under s. 179.0201. AB50,231615Section 2316. 185.983 (1) (intro.) of the statutes is amended to read: AB50,1184,2416185.983 (1) (intro.) Every voluntary nonprofit health care plan operated by a 17cooperative association organized under s. 185.981 shall be exempt from chs. 600 to 18646, with the exception of ss. 601.04, 601.13, 601.31, 601.41, 601.42, 601.43, 601.44, 19601.45, 611.26, 611.67, 619.04, 623.11, 623.12, 628.34 (10), 631.17, 631.89, 631.93, 20631.95, 632.72 (2), 632.722, 632.729, 632.745 to 632.749, 632.7498, 632.775, 632.79, 21632.795, 632.798, 632.848, 632.85, 632.851, 632.853, 632.855, 632.861, 632.862, 22632.867, 632.87 (2) to (6) (8), 632.871, 632.885, 632.89, 632.891, 632.895 (5) and (8) 23to (17), 632.896, and 632.897 (10) and chs. 609, 620, 630, 635, 645, and 646, but the 24sponsoring association shall: AB50,2317
1Section 2317. 189.02 (3m) (a) of the statutes is amended to read: AB50,1185,42189.02 (3m) (a) Except as provided in s. 15.03, the public service commission 3department shall have no control or jurisdiction over the office in matters relating 4to railroad regulation. AB50,23185Section 2318. 189.02 (3m) (b) of the statutes is amended to read: AB50,1185,96189.02 (3m) (b) Notwithstanding par. (a), the commissioner of railroads shall 7seek the input of, and give considerable weight to the advice given by, the 8chairperson of the public service commission secretary on matters relating to the 9employment of persons by the office. AB50,231910Section 2319. 189.02 (4) of the statutes is amended to read: AB50,1185,1311189.02 (4) Decisions of the office are not appealable to the public service 12commission department. Decisions of the office are subject to judicial review under 13ch. 227. AB50,232014Section 2320. 189.02 (7) of the statutes is repealed. AB50,232115Section 2321. 190.11 (3) of the statutes is amended to read: AB50,1185,1816190.11 (3) The office of the commissioner of railroads shall collect a fee of $1 17per page filed under sub. (1). All fees received under this subsection shall be 18credited to the appropriation account under s. 20.155 (2) (g) 20.395 (7) (ag). AB50,232219Section 2322. 194.025 of the statutes is amended to read: AB50,1185,2320194.025 Discrimination prohibited. No motor carrier may engage in any 21practice, act or omission which results in discrimination on the basis of race, creed, 22sex or, national origin, or status as a holder or nonholder of a license under s. 343.03 23(3r). AB50,232324Section 2323. 195.60 (1) of the statutes is amended to read: AB50,1187,2
1195.60 (1) Whenever the office in a proceeding upon its own motion, on 2complaint, or upon an application to it deems it necessary in order to carry out the 3duties imposed upon it by law to investigate the books, accounts, practices and 4activities of, or make appraisals of the property of any railroad or water carrier or to 5render any engineering or accounting services to any railroad or water carrier, the 6railroad or water carrier shall pay the expenses attributable to such investigation, 7appraisal or service. The office shall ascertain such expenses, and shall render a 8bill therefor, by mail, to the railroad or water carrier, either at the conclusion of the 9investigation, appraisal or services, or during its progress. The bill shall constitute 10notice of assessment and demand of payment thereof. The railroad or water carrier 11shall, within 30 days after the mailing thereof, pay to the office the amount of the 12special expense for which it is billed. Ninety percent of the payment shall be 13credited to the appropriation account under s. 20.155 (2) (g) 20.395 (7) (ag). The 14total amount, in any one calendar year, for which any railroad or water carrier 15becomes liable, by reason of costs incurred by the office within such calendar year, 16shall not exceed four-fifths of one percent of its gross operating revenues derived 17from intrastate operations in the last preceding calendar year. Where, under this 18subsection, costs are incurred within any calendar year, which are in excess of four-19fifths of one percent of such gross operating revenues, the excess costs shall not be 20chargeable as part of the remainder under sub. (2) but shall be paid out of the 21general appropriation to the office. Nothing in this subsection shall prevent the 22office from rendering bills in one calendar year for costs incurred within a previous 23year. For the purpose of calculating the costs of investigations, appraisals and other 24services under this subsection, 90 percent of the costs determined shall be costs of
1the office and 10 percent of the costs determined shall be costs of state government 2operations. AB50,23243Section 2324. 195.60 (2) of the statutes is amended to read: AB50,1187,234195.60 (2) The office shall annually, within 90 days after the close of each 5fiscal year, ascertain the total of its expenditures during such year which are 6reasonably attributable to the performance of its duties relating to railroads and 7water carriers. For purposes of such calculation, 90 percent of the expenditures so 8determined shall be expenditures of the office and 10 percent of the expenditures so 9determined shall be expenditures for state government operations. The office shall 10deduct therefrom all amounts chargeable to railroads and water carriers under sub. 11(1) and s. 201.10 (3). A sum equal to the remainder plus 10 percent of the 12remainder shall be assessed by the office to the several railroads and water carriers 13in proportion to their respective gross operating revenues during the last calendar 14year, derived from intrastate operations. Such assessment shall be paid within 30 15days after the bill has been mailed to the several railroads and water carriers, 16which bill shall constitute notice of assessment and demand of payment thereof. 17The total amount which may be assessed to the railroads and water carriers under 18authority of this subsection shall not exceed 1.85 percent of the total gross 19operating revenues of such railroads and water carriers, during such calendar year, 20derived from intrastate operations. Ninety percent of the payment shall be credited 21to the appropriation account under s. 20.155 (2) (g) 20.395 (7) (ag). The railroads 22and water carriers shall furnish such financial information as the office requires for 23purposes of this section. AB50,232524Section 2325. 196.025 (8) of the statutes is created to read: AB50,1188,3
1196.025 (8) Nuclear energy feasibility study. The commission shall 2conduct a nuclear power plant feasibility study, and may contract with a 3rd party 3to conduct all or part of the study. AB50,23264Section 2326. 196.027 (1) (d) 3. of the statutes is created to read: AB50,1188,65196.027 (1) (d) 3. The retiring of any existing electric generating facility 6fueled by nonrenewable combustible energy resources. AB50,23277Section 2327. 196.027 (1) (f) of the statutes is amended to read: AB50,1188,168196.027 (1) (f) “Environmental control cost” means capital cost, including 9capitalized cost relating to regulatory assets, incurred or expected to be incurred by 10an energy utility in undertaking an environmental control activity and, with 11respect to an environmental control activity described in par. (d) 2. or 3., includes 12the unrecovered value of property that is retired, including any demolition or 13similar cost that exceeds the salvage value of the property. “Environmental control 14cost” does not include any monetary penalty, fine, or forfeiture assessed against an 15energy utility by a government agency or court under a federal or state 16environmental statute, rule, or regulation. AB50,232817Section 2328. 196.372 (3) (e) 2. (intro.) and b. of the statutes are 18consolidated, renumbered 196.372 (3) (e) 2. and amended to read: AB50,1188,2219196.372 (3) (e) 2. The commission may not approve an application under subd. 201. unless the application satisfies all of the following conditions: b. Any states that 21any loan provided may not be forgiven by the water public utility or the 22municipality. AB50,232923Section 2329. 196.372 (3) (e) 2. a. of the statutes is repealed. AB50,2330
1Section 2330. 196.374 (1) (d) of the statutes is amended to read: AB50,1189,72196.374 (1) (d) “Energy efficiency program” means a program for reducing 3the usage or, reducing the demand, or increasing the efficiency of the usage of 4energy by a customer or member of an energy utility, municipal utility, or retail 5electric cooperative, including programs that promote the development or use of 6energy storage systems by residential customers. “Energy efficiency program” does 7not include load management. AB50,23318Section 2331. 196.374 (1) (dm) of the statutes is created to read: AB50,1189,119196.374 (1) (dm) “Energy storage system” means a commercially available 10technology that uses mechanical, chemical, or thermal processes for absorbing 11energy and storing it for a period of time for use at a later time. AB50,233212Section 2332. 196.374 (3) (b) 2. of the statutes is amended to read: AB50,1189,1813196.374 (3) (b) 2. The commission shall require each energy utility to spend 141.2 2.4 percent of its annual operating revenues derived from retail sales to fund the 15utility’s programs under sub. (2) (b) 1., the utility’s ordered programs, the utility’s 16share of the statewide energy efficiency and renewable resource programs under 17sub. (2) (a) 1., and the utility’s share, as determined by the commission under subd. 184., of the costs incurred by the commission in administering this section. AB50,233319Section 2333. 196.376 of the statutes is created to read: AB50,1190,220196.376 Residential and commercial energy improvements. The 21commission may authorize a public utility to finance energy improvements at a 22specific residential or commercial location and recover the cost of those 23improvements over time through a surcharge periodically placed on the public 24utility customer’s account for that location. The commission shall promulgate rules
1to establish the requirements for the utility financing programs authorized under 2this section. Those requirements shall include at least all of the following: AB50,1190,43(1) The surcharge shall be assigned to a location, not to an individual 4customer. AB50,1190,65(2) Energy improvements are eligible for financing only if the improvements 6are estimated to save an amount that exceeds the surcharge. AB50,1190,87(3) The financing offered to a customer under this section may not increase 8the customer’s risk or debt. AB50,23349Section 2334. 196.379 of the statutes is created to read: AB50,1190,1210196.379 Energy innovation grant program. The office of energy 11innovation in the commission shall administer the energy innovation grant 12program. AB50,233513Section 2335. 196.491 (2) (title) of the statutes is amended to read: AB50,1190,1514196.491 (2) (title) Strategic energy assessment and integrated 15resource plans. AB50,233616Section 2336. 196.491 (2) (a) 3s. of the statutes is created to read: AB50,1190,1817196.491 (2) (a) 3s. Review the integrated resource plans submitted by electric 18utilities under par. (h) to help inform the strategic energy assessment. AB50,233719Section 2337. 196.491 (2) (h) of the statutes is created to read: AB50,1191,1220196.491 (2) (h) 1. Each electric utility shall prepare and file an integrated 21resource plan with the commission. The commission shall by order establish 22integrated resource plan content and filing requirements, including filing 23deadlines. An integrated resource plan shall include a set of resource options that
1an electric utility could use to meet the service needs of its customers over the next 25-year, 10-year, and 15-year periods, including an explanation of the supply-and-3demand circumstances under which, and the extent to which, each resource option 4would be used to meet those service needs. Resource options that could be used to 5meet service needs include using, refurbishing, and constructing electric generating 6plants and equipment; buying electricity generated by other entities; controlling 7customer loads; and implementing customer energy conservation. The commission 8shall approve, reject, or modify an electric utility’s integrated resource plan 9consistent with the public interest. The commission’s acceptance of an integrated 10resource plan under this paragraph does not constitute issuance of a certificate 11under s. 196.49 or issuance of a certificate of public convenience and necessity 12under sub. (3). AB50,1191,14132. An integrated resource plan under this paragraph shall include all of the 14following: AB50,1191,1615a. A long-term forecast of the electric utility’s sales and peak demand under 16various reasonable scenarios. AB50,1191,1917b. Details regarding the amount of peak demand reduction the electric utility 18expects to achieve and the electric utility’s proposals for achieving the reduction in 19peak demand, including through load management and demand response. AB50,1191,2320c. If the plan identifies constructing a generation facility as a resource option, 21the type of generation technology proposed for the generation facility, the proposed 22capacity of the generation facility, and the projected fuel costs for the proposed 23generation facility under various reasonable scenarios. AB50,1192,5
1d. Projected electricity purchased or produced by the electric utility that is 2generated from a renewable energy resource. If the electric utility projects the total 3level of electricity purchased or produced from a renewable energy resource to 4decrease over the periods described in subd. 1. a., the electric utility shall explain 5why the decrease is in the best interests of ratepayers. AB50,1192,96e. Details regarding the impacts of energy efficiency programs on the electric 7utility’s electricity sales and peak demand under various reasonable scenarios, 8including the total amount of customer energy savings and the associated costs of 9the energy efficiency programs. AB50,1192,1110f. Projected energy and capacity purchased or produced by the electric utility 11from a cogeneration resource. AB50,1192,1312g. An analysis of potential new or upgraded electricity transmission options 13for the electric utility. AB50,1192,1614h. Data regarding the electric utility’s current generation portfolio, including 15the age, capacity factor, licensing status, and estimated remaining operating time 16for each electric generating facility in the portfolio. AB50,1192,2017i. Plans for meeting current and future capacity needs, including cost 18estimates for any power purchase agreement, any proposed construction or major 19investment, and any transmission or distribution infrastructure necessary to 20support proposed construction or major investments. AB50,1192,2321j. An analysis of the cost, capacity factor, and viability of all reasonable 22options available to meet projected energy and capacity needs, including existing 23electric generating facilities in this state. AB50,1193,1
1k. Projected total costs for each scenario reviewed under this subdivision. AB50,1193,42L. If applicable, projected long-term natural gas transportation contracts or 3natural gas storage that the electric utility will hold to provide an adequate supply 4of natural gas to new electric generating facilities. AB50,1193,55m. Any other information required by the commission by order. AB50,1193,663. This paragraph does not apply to cooperative associations. AB50,23387Section 2338. 196.491 (3) (g) of the statutes is amended to read: AB50,1193,178196.491 (3) (g) The commission shall take final action on an application filed 9under par. (a) 1. within 180 days after the application is determined or considered 10to be complete under par. (a) 2. If the commission fails to take final action within 11the 180-day period, the commission is considered to have issued a certificate of 12public convenience and necessity with respect to the application, unless the 13chairperson of the commission extends the time period for no more than an 2 14additional 180 days 180-day extensions for good cause. If the commission fails to 15take final action within the extended period, the commission is considered to have 16issued a certificate of public convenience and necessity with respect to the 17application. AB50,233918Section 2339. 196.504 (2) (a) of the statutes is amended to read: AB50,1193,2319196.504 (2) (a) To make broadband expansion grants to eligible applicants for 20the purpose of constructing broadband infrastructure in unserved areas designated 21under par. (e). Grants awarded under this section shall be paid from the 22appropriations under ss. 20.155 (3) (a), (r), and (rm) and 20.866 (2) (z), in the 23amount allocated under s. 20.866 (2) (z) 5. AB50,234024Section 2340. 196.5048 of the statutes is created to read:
/2025/related/proposals/ab50
true
proposaltext
/2025/related/proposals/ab50/2318/_1
proposaltext/2025/REG/AB50,1185,9
proposaltext/2025/REG/AB50,1185,9
section
true