SB45-SSA2-SA6,26,88b. Guardian has the meaning given in s. 48.02 (8).
SB45-SSA2-SA6,26,99c. Parent has the meaning given in s. 48.02 (13).
SB45-SSA2-SA6,26,16102. The parent or guardian of a child may apply for an annual vehicle
11admission receipt fee waiver by submitting an application to the department. An
12application may not be submitted to a regional office of the department or to a
13person who is subject to an appointment or a contract as authorized under s. 29.024
14(6) (a) 2. to 4. but must be submitted directly to the main office of the department.
15An application shall be submitted on a form provided by the department and shall
16include all of the following information:
SB45-SSA2-SA6,26,1717a. The childs name.
SB45-SSA2-SA6,26,1818b. The childs date of birth.
SB45-SSA2-SA6,26,2119c. The name of the school the child is or will be attending or a certification
20that the child is in a home-based private educational program, as defined in s.
21115.001 (3g).
SB45-SSA2-SA6,27,322d. A certification that the child is, was, or will be a 4th grade pupil on the first
23day of January of the calendar year for which the waiver is issued. This

1certification may be satisfied with dated report cards, dated and signed enrollment
2forms, a dated letter from the childs school on official letterhead, or any other proof
3deemed acceptable by the department.
SB45-SSA2-SA6,27,643. Subject to subd. 4., the department shall provide to an individual whose
5application submitted under subd. 2. is approved an annual vehicle admission
6receipt fee waiver that is valid for the calendar year in which the waiver is issued.
SB45-SSA2-SA6,27,1074. A parent or guardian may receive only one fee waiver under this paragraph
8in his or her lifetime. If a parent or guardian receives a fee waiver under this
9paragraph, the department may not issue a fee waiver under this paragraph for any
10other member of the parents or guardians household.
SB45-SSA2-SA6,27,14115. The department shall waive the fee, including the issuing fee, imposed
12under sub. (7) for an annual vehicle admission receipt for a single vehicle, except a
13motor bus, that has Wisconsin registration plates and that is operated by a person
14who holds a valid fee waiver issued under this paragraph.
SB45-SSA2-SA6,8315Section 83. 27.01 (9) (bt) of the statutes is created to read:
SB45-SSA2-SA6,27,221627.01 (9) (bt) Annual vehicle admission receipt fee waiver; tribes and bands.
17The department shall waive all fees imposed under sub. (7) for an annual vehicle
18admission receipt for any vehicle, except a motor bus, that has Wisconsin
19registration plates or a registration plate showing valid registration by a federally
20recognized American Indian tribe or band and that is owned by a person who
21produces evidence that he or she is a member of a federally recognized American
22Indian tribe or band located in this state.
SB45-SSA2-SA6,8423Section 84. 27.01 (10) (f) of the statutes is renumbered 27.01 (10) (f) 1.
SB45-SSA2-SA6,85
1Section 85. 27.01 (10) (f) 2. of the statutes is created to read:
SB45-SSA2-SA6,28,5227.01 (10) (f) 2. The department shall waive the camping fee, including any
3additional fee under par. (g) or sub. (11) (c), for a person who applies for a
4reservation under sub. (11) and who produces evidence that he or she is a member
5of a federally recognized American Indian tribe or band located in this state.
SB45-SSA2-SA6,866Section 86. 27.01 (19) of the statutes is created to read:
SB45-SSA2-SA6,28,9727.01 (19) Credit card handling fee. (a) In this subsection, credit card
8handling fee means the costs associated with collecting fees that are paid for by
9using a credit card.
SB45-SSA2-SA6,28,1310(b) In addition to any other fee imposed under this section, the department
11may collect a credit card handling fee to cover credit card transaction costs incurred
12in collecting fees for vehicle admission receipt and camping fees that are paid for by
13using a credit card.
SB45-SSA2-SA6,28,1514(c) If the department collects a handling fee under par. (b), it shall promulgate
15rules establishing the amount of the fee.
SB45-SSA2-SA6,28,1916(d) If the department has appointed an agent to collect a fee to which this
17subsection applies, the department may allow the agent to collect any applicable
18credit card handling fee. The department may allow the agent to retain all or a
19portion of each credit card handling fee.
SB45-SSA2-SA6,28,2220(e) A credit card handling fee may not be more than the amount necessary to
21cover the costs of using a credit card to collect the fee to which the credit card
22handling fee applies.
SB45-SSA2-SA6,28,2423(f) Any fee collected under this subsection by the department shall be credited
24to the appropriation account under s. 20.370 (9) (hw).
SB45-SSA2-SA6,87
1Section 87. 29.063 (7) of the statutes is created to read:
SB45-SSA2-SA6,29,5229.063 (7) The department shall provide financial assistance to cities,
3villages, towns, and counties; individuals; businesses; and nonprofit conservation
4organizations for the purchase of large metal containers in which hunters may
5dispose of deer carcasses.
SB45-SSA2-SA6,886Section 88. 30.92 (2) of the statutes is repealed.
SB45-SSA2-SA6,897Section 89. 30.92 (3) (b) 5. of the statutes is amended to read:
SB45-SSA2-SA6,29,8830.92 (3) (b) 5. Projects underway in a state of readiness.
SB45-SSA2-SA6,909Section 90. 30.92 (4) (b) 2. a. of the statutes is amended to read:
SB45-SSA2-SA6,29,151030.92 (4) (b) 2. a. The department may cost-share, with the approval of the
11commission, with a qualified lake association or an affected governmental unit,
12including itself, at a rate of up to 50 percent of any construction, acquisition,
13rehabilitation, feasibility study or other project costs or any combination of these
14costs, for the recreational boating project if the costs are the type that qualify for
15funding under this section.
SB45-SSA2-SA6,9116Section 91. 30.92 (4) (b) 3. of the statutes is repealed.
SB45-SSA2-SA6,9217Section 92. 30.92 (4) (b) 6m. of the statutes is amended to read:
SB45-SSA2-SA6,29,221830.92 (4) (b) 6m. Notwithstanding subd. 6., the department, with the
19approval of the commission, may reallocate for expenditure for recreational boating
20aids without complying with the percentages under subd. 6. any state funds that
21are not encumbered for expenditure for a fiscal year before the first day of the 4th
223rd quarter of that fiscal year.
SB45-SSA2-SA6,9323Section 93. 70.58 (3) of the statutes is renumbered 70.58 (3) (a) and
24amended to read:
SB45-SSA2-SA6,30,5
170.58 (3) (a) In Beginning with fiscal year 2017-18, and in each ending with
2fiscal year thereafter 2024-25, an amount equal to 0.1697 mills for each dollar of the
3assessed valuation of the property of the state as determined by the department of
4revenue under s. 70.57 shall be transferred from the general fund to the
5conservation fund for the purposes described under sub. (1).
SB45-SSA2-SA6,946Section 94. 70.58 (3) (b) of the statutes is created to read:
SB45-SSA2-SA6,30,11770.58 (3) (b) In fiscal year 2025-26, and in each fiscal year thereafter, an
8amount equal to 0.1406 mills for each dollar of the assessed valuation of the
9property of the state as determined by the department of revenue under s. 70.57
10shall be transferred from the general fund to the conservation fund for the purposes
11described under sub. (1).
SB45-SSA2-SA6,9512Section 95. 77.88 (2) (ac) 1. of the statutes is amended to read:
SB45-SSA2-SA6,31,31377.88 (2) (ac) 1. If the land transferred under par. (a) meets the eligibility
14requirements under s. 77.82 (1) (a), (ag), and (b), the land shall continue to be
15designated as managed forest land if the transferee, within 30 days after a transfer
16of ownership, files a form provided by the department signed by the transferee. By
17signing the form, the transferee certifies to the department an intent to comply
18with the existing management plan for the land and any amendments to the plan.
19The transferee shall provide proof that each person holding any encumbrance on
20the land agrees to the designation. The transferee may designate an area of the
21transferred land closed to public access as provided under s. 77.83. The department
22shall issue an order continuing the designation of the land as managed forest land
23under the new ownership. The transferee shall pay a $100 fee that will accompany
24the report. The fee shall be deposited in the conservation fund. Twenty dollars of

1the fee or a different amount of the fee as may be established under subd. 2. shall be
2and credited to the appropriation under s. 20.370 (2) (cr). The department shall
3immediately notify each person entitled to notice under s. 77.82 (8).
SB45-SSA2-SA6,964Section 96. 77.88 (5m) of the statutes is amended to read:
SB45-SSA2-SA6,31,8577.88 (5m) Withdrawal fee. The withdrawal fee assessed by the
6department under subs. (1) (c), (2) (ac) 2. and 3., (am), and (c), (3), and (3j) (c), and
7(3m) shall be $300. The fee shall be deposited in the conservation fund and credited
8to the appropriation under s. 20.370 (2) (cr).
SB45-SSA2-SA6,979Section 97. 92.14 (18) of the statutes is created to read:
SB45-SSA2-SA6,31,141092.14 (18) PFAS monitoring. As part of any statewide monitoring program,
11sampling program, or survey conducted by the department, any samples that are
12collected and tested shall also, at the departments discretion and where
13appropriate, be tested for the presence of any perfluoroalkyl or polyfluoroalkyl
14substance.
SB45-SSA2-SA6,9815Section 98. 160.07 (5) of the statutes is renumbered 160.07 (5) (a) and
16amended to read:
SB45-SSA2-SA6,31,2217160.07 (5) (a) Within Except as provided under par. (b), within 9 months after
18transmitting the name of a substance to the department of health services under
19sub. (2), the department of natural resources shall propose rules establishing the
20recommendation of the department of health services as the enforcement standard
21for that substance and publish the notice required under s. 227.16 (2) (e), 227.17 or
22227.24 (3).
SB45-SSA2-SA6,9923Section 99. 160.07 (5) (b) of the statutes is created to read:
SB45-SSA2-SA6,32,524160.07 (5) (b) Within 3 months after receiving a recommended enforcement

1standard for a perfluoroalkyl or polyfluoroalkyl substance from the department of
2health services under sub. (3), the department of natural resources shall prepare a
3statement of scope under s. 227.135 of proposed rules that establish the
4recommendation of the department of health services as the enforcement standard
5for that substance.
SB45-SSA2-SA6,1006Section 100. 196.491 (2) (title) of the statutes is amended to read:
SB45-SSA2-SA6,32,87196.491 (2) (title) Strategic energy assessment and integrated
8resource plans.
SB45-SSA2-SA6,1019Section 101. 196.491 (2) (a) 3s. of the statutes is created to read:
SB45-SSA2-SA6,32,1110196.491 (2) (a) 3s. Review the integrated resource plans submitted by electric
11utilities under par. (h) to help inform the strategic energy assessment.
SB45-SSA2-SA6,10212Section 102. 196.491 (2) (h) of the statutes is created to read:
SB45-SSA2-SA6,33,513196.491 (2) (h) 1. Each electric utility shall prepare and file an integrated
14resource plan with the commission. The commission shall by order establish
15integrated resource plan content and filing requirements, including filing
16deadlines. An integrated resource plan shall include a set of resource options that
17an electric utility could use to meet the service needs of its customers over the next
185-year, 10-year, and 15-year periods, including an explanation of the supply-and-
19demand circumstances under which, and the extent to which, each resource option
20would be used to meet those service needs. Resource options that could be used to
21meet service needs include using, refurbishing, and constructing electric generating
22plants and equipment; buying electricity generated by other entities; controlling
23customer loads; and implementing customer energy conservation. The commission

1shall approve, reject, or modify an electric utilitys integrated resource plan
2consistent with the public interest. The commissions acceptance of an integrated
3resource plan under this paragraph does not constitute issuance of a certificate
4under s. 196.49 or issuance of a certificate of public convenience and necessity
5under sub. (3).
SB45-SSA2-SA6,33,762. An integrated resource plan under this paragraph shall include all of the
7following:
SB45-SSA2-SA6,33,98a. A long-term forecast of the electric utilitys sales and peak demand under
9various reasonable scenarios.
SB45-SSA2-SA6,33,1210b. Details regarding the amount of peak demand reduction the electric utility
11expects to achieve and the electric utilitys proposals for achieving the reduction in
12peak demand, including through load management and demand response.
SB45-SSA2-SA6,33,1613c. If the plan identifies constructing a generation facility as a resource option,
14the type of generation technology proposed for the generation facility, the proposed
15capacity of the generation facility, and the projected fuel costs for the proposed
16generation facility under various reasonable scenarios.
SB45-SSA2-SA6,33,2117d. Projected electricity purchased or produced by the electric utility that is
18generated from a renewable energy resource. If the electric utility projects the total
19level of electricity purchased or produced from a renewable energy resource to
20decrease over the periods described in subd. 1. a., the electric utility shall explain
21why the decrease is in the best interests of ratepayers.
SB45-SSA2-SA6,34,222e. Details regarding the impacts of energy efficiency programs on the electric
23utilitys electricity sales and peak demand under various reasonable scenarios,

1including the total amount of customer energy savings and the associated costs of
2the energy efficiency programs.
SB45-SSA2-SA6,34,43f. Projected energy and capacity purchased or produced by the electric utility
4from a cogeneration resource.
SB45-SSA2-SA6,34,65g. An analysis of potential new or upgraded electricity transmission options
6for the electric utility.
SB45-SSA2-SA6,34,97h. Data regarding the electric utilitys current generation portfolio, including
8the age, capacity factor, licensing status, and estimated remaining operating time
9for each electric generating facility in the portfolio.
SB45-SSA2-SA6,34,1310i. Plans for meeting current and future capacity needs, including cost
11estimates for any power purchase agreement, any proposed construction or major
12investment, and any transmission or distribution infrastructure necessary to
13support proposed construction or major investments.
SB45-SSA2-SA6,34,1614j. An analysis of the cost, capacity factor, and viability of all reasonable
15options available to meet projected energy and capacity needs, including existing
16electric generating facilities in this state.
SB45-SSA2-SA6,34,1717k. Projected total costs for each scenario reviewed under this subdivision.
SB45-SSA2-SA6,34,2018L. If applicable, projected long-term natural gas transportation contracts or
19natural gas storage that the electric utility will hold to provide an adequate supply
20of natural gas to new electric generating facilities.
SB45-SSA2-SA6,34,2121m. Any other information required by the commission by order.
SB45-SSA2-SA6,34,22223. This paragraph does not apply to cooperative associations.
SB45-SSA2-SA6,10323Section 103. 227.139 (5) of the statutes is created to read:
SB45-SSA2-SA6,35,6
1227.139 (5) This section does not apply to a proposed rule of the department
2of natural resources establishing acceptable levels and standards, performance
3standards, enforcement standards and preventative action limits, monitoring
4requirements, and required response actions for any perfluoroalkyl or
5polyfluoroalkyl substance or group or class of such substances in groundwater,
6drinking water, surface water, air, soil, or sediment.
SB45-SSA2-SA6,1047Section 104. 227.19 (7) of the statutes is amended to read:
SB45-SSA2-SA6,35,148227.19 (7) Nonapplication. This section does not apply to rules promulgated
9under s. 227.24, or to rules proposed by the department of natural resources
10establishing acceptable levels and standards, performance standards, enforcement
11standards and preventative action limits, monitoring requirements, and required
12response actions for any perfluoroalkyl or polyfluoroalkyl substance or group or
13class of such substances in groundwater, drinking water, surface water, air, soil, or
14sediment.
SB45-SSA2-SA6,10515Section 105. 227.26 (5) of the statutes is created to read:
SB45-SSA2-SA6,35,2116227.26 (5) This section does not apply to a proposed rule of the department of
17natural resources establishing acceptable levels and standards, performance
18standards, enforcement standards and preventative action limits, monitoring
19requirements, and required response actions for any perfluoroalkyl or
20polyfluoroalkyl substance or group or class of such substances in groundwater,
21drinking water, surface water, air, soil, or sediment.
SB45-SSA2-SA6,10622Section 106. 281.34 (2) of the statutes is amended to read:
SB45-SSA2-SA6,36,523281.34 (2) Approval required for high capacity wells. Except as

1provided under sub. (2g), an owner shall apply to the department for approval
2before construction of a high capacity well begins. Except as provided under sub.
3(2g), no person may construct or withdraw water from a high capacity well without
4the approval of the department under this section or under s. 281.17 (1), 2001 stats.
5An owner applying for approval under this subsection shall pay a fee of $500 $1,000.
SB45-SSA2-SA6,1076Section 107. 281.54 of the statutes is created to read:
SB45-SSA2-SA6,36,87281.54 County well testing grant program. (1) Definitions. In this
8section:
SB45-SSA2-SA6,36,99(a) PFAS means a perfluoroalkyl or polyfluoroalkyl substance.
SB45-SSA2-SA6,36,1010(b) Private water supply has the meaning given in s. 281.77 (1) (a).
SB45-SSA2-SA6,36,1411(2) Financial assistance. The department shall administer a program to
12provide grants from the appropriation under s. 20.370 (6) (ew) to counties for the
13purpose of providing sampling and testing services to owners of private water
14supplies to sample and test for PFAS, nitrates, bacteria, and lead.
SB45-SSA2-SA6,36,1615(3) Rulemaking. The department shall promulgate rules to administer this
16section.
SB45-SSA2-SA6,10817Section 108. 281.59 (4) (f) of the statutes is amended to read:
SB45-SSA2-SA6,37,518281.59 (4) (f) Revenue obligations may be contracted by the building
19commission when it reasonably appears to the building commission that all
20obligations incurred under this subsection, and all payments under an agreement
21or ancillary arrangement entered into under s. 18.55 (6) with respect to revenue
22obligations issued under this subsection, can be fully paid on a timely basis from
23moneys received or anticipated to be received. Revenue obligations issued under
24this subsection for the clean water fund program and safe drinking water loan

1program shall not exceed $2,526,700,000 $3,329,650,100 in principal amount,
2excluding obligations issued to refund outstanding revenue obligation notes. The
3building commission may contract additional revenue obligations in an amount up
4to $24,700,000. The building commission may contract additional revenue
5obligations in an amount up to $46,000,000.
SB45-SSA2-SA6,1096Section 109. 281.59 (4) (f) of the statutes is amended to read:
SB45-SSA2-SA6,37,197281.59 (4) (f) Revenue obligations may be contracted by the building
8commission when it reasonably appears to the building commission that all
9obligations incurred under this subsection, and all payments under an agreement
10or ancillary arrangement entered into under s. 18.55 (6) with respect to revenue
11obligations issued under this subsection, can be fully paid on a timely basis from
12moneys received or anticipated to be received. Revenue obligations issued under
13this subsection for the clean water fund program and safe drinking water loan
14program shall not exceed $2,526,700,000 in principal amount, excluding obligations
15issued to refund outstanding revenue obligation notes. The building commission
16may contract additional revenue obligations in an amount up to $24,700,000. The
17building commission may contract additional revenue obligations in an amount up
18to $46,000,000. The building commission may contract additional revenue
19obligations in an amount up to $726,000,000.
SB45-SSA2-SA6,11020Section 110. 281.61 (6) of the statutes is amended to read:
SB45-SSA2-SA6,38,1221281.61 (6) Priority list. The department shall establish a priority list that
22ranks each safe drinking water loan program project. The department shall
23promulgate rules for determining project rankings that, to the extent possible, give
24priority to projects that address the most serious risks to human health, that are

1necessary to ensure compliance with the Safe Drinking Water Act, 42 USC 300f to
2300j-26, and that assist applicants that are most in need on a per household basis,
3according to affordability criteria specified in the rules. For the purpose of ranking
4projects under this subsection, the department shall treat a project to upgrade a
5public water system to provide continuous disinfection of the water that it
6distributes as if the public water system were a surface water system that federal
7law requires to provide continuous disinfection. For the purpose of ranking projects
8under this subsection, if the department of health services has recommended an
9enforcement standard for a perfluoroalkyl or polyfluoroalkyl substance, the
10department of natural resources shall treat a project relating to that perfluoroalkyl
11or polyfluoroalkyl substance as if a maximum contaminant level for that substance
12has been attained or exceeded.
SB45-SSA2-SA6,11113Section 111. 281.61 (8) (b) of the statutes is created to read:
SB45-SSA2-SA6,38,1614281.61 (8) (b) The department of administration shall allocate the amount
15appropriated under s. 20.320 (2) (a) to projects involving forgivable loans to private
16users of public water systems to replace lead service lines.
Loading...
Loading...