This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
DHS 131.39 (6) (b) Smoke and heat detectors installed under this section shall be listed by a nationally recognized testing laboratory that maintains periodic inspection of production of tested equipment and the listing of which states that the equipment meets nationally recognized standards or has been tested and found suitable for use in a specified manner.
SECTION 29. DHS 131.39 (8) and DHS 131.40 to DHS 131.42 are created to read:
DHS 131.39 (8) Fire Report. All incidents of fire in a hospice shall be reported to the department within 72 hours.
DHS 131.39 (8) (Note) A fire report must be completed online. An approved fire report survey is available at: Health Care Facility Fire Report, F-62500, at: https://www.dhs.wisconsin.gov/publications/p01729.pdf
DHS 131.40 Plans for new construction and alterations.
(1) Definitions. In this subsection:
(a) “Alteration” has the meaning provided in SPS 361.05 International Building Code 2015.
(b)Existing construction means a building which is in place or is being constructed with plans approved by the department prior to the effective date of this rule.
(c) “Life Safety Code” means the National Fire Protection Associations (NFPA) Standard 101.
(d) “New construction” means construction for the first time of any building or addition to an existing building, the plans for which are approved on or after the effective date of this rule.
(2) Signing and sealing. Construction documents submitted to the department for review shall be prepared, signed and sealed as required by ch. 443, Stats., and s. A−E 2.02.
(3) Contents and information.
(a) 1. Construction documents submitted to the department for review shall be dimensioned and drawn to scale.
2. The scale used for the construction documents shall be indicated on the documents.
(b) 1. Except as provided in subd. 2., at least 4 sets of construction documents shall be submitted to the department for review.
2. a. At least one set of construction specifications shall be submitted to the department for review.
b. One complete set of plans may be submitted, provided it is accompanied with 3 copies of the cover sheet for the complete set, and provided all 4 cover sheets comply with sub. (1).
c. Fees shall be remitted at the time the plans are submitted. No plan examinations, approvals, or onsite reviews shall be made until fees are received.
(4) Application approval.
(a) A plan review application form shall be included with the construction documents and information submitted to the department for examination and approval. The department shall review and make a determination on an application for plan review under this chapter within 30 business days.
(b) An application for conditional approval will not be granted if, upon examination, the department determines that the construction documents or application for approval require additional information.
(c) If, upon examination, the department determines that the construction documents and the application for approval comply substantially with this chapter, a conditional approval, in writing, will be granted and the plans will be stamped conditionally approved. All conditions stated in the conditional approval shall be complied with by the applicant before or during construction.
(d) If, upon examination, the department determines that the construction documents or application for approval do not substantially comply with this chapter, the application for conditional approval will be denied, in writing.
(5) Expiration of approval.
(a) Building shell. Plan approval by the department for new buildings and building additions shall expire 2 years after the approval date indicated on the approved building plans if the building shell is not closed-in within those 2 years.
(b) Occupancy. Plan approval by the department for new buildings and building additions shall expire 3 years after the approval date indicated on the approved building plans if the building is not ready for occupancy within those 3 years.
(c) Alterations. Plan approval by the department for interior building alterations shall expire one year after the approval date indicated on the approved building plans if the alteration work is not completed within that year.
(d) HVAC construction only. Plan approval by the department for heating, ventilating, or air conditioning construction that does not include any associated building construction shall expire one year after the approval date indicated on the approved plans if the building or building area affected by the plans is not ready for occupancy within that year.
(e) Fire protection systems only. Plan approval by the department for a fire protection system that does not include any associated building construction shall expire 2 years after the approval date indicated on the approved plans if the building or building area affected by the plans is not ready for occupancy within those 2 years.
(6) Extension of plan approval. Upon request and payment of the fee specified in s. DHS 131.42 (3) (d), the expiration dates in sub. (5) (a) to (e) may be extended provided the request is submitted prior to expiration of the original approval.
(7) Changes to approved final plans. Any changes in the approved final plans affecting the application of the requirements of this subchapter shall be shown on the approved final plans and shall be submitted to the department for approval before construction is undertaken. The department shall notify the hospice in writing of any conflict with this subchapter found in its review of modified plans and specifications.
(8) Permission to start construction.
(a) A building owner may request and the department may grant permission to start construction for the footings and foundations upon submission of construction documents under s. DHS 131.40.
(b) The department shall review and make a determination on an application for permission to start construction of the footings and foundations within 3 business days of receipt of the application and all forms, fees, construction documents and information required to complete the review.
(c) A building owner who has been granted permission to start construction of the footings and foundations may proceed at the owner’s own risk without assurance that a conditional approval for the building will be granted.
(9) Onsite reviews. The department may conduct onsite reviews during the construction phase of the project including but not limited to framing reviews, above ceiling reviews, and finish reviews.
DHS 131.41 Plan review.
(1) Before the start of any construction or alteration project for a hospice, the plans for the construction or alteration shall be submitted to the department, pursuant to s. DHS 131.40, for review and approval by the department.
(2)
The department shall review hospice construction and alteration plans for compliance with all of the following:
(a) Chapter DHS 131.
(b) The Wisconsin Commercial Building Code, chs. SPS 361 to 366, with the exception of s. SPS 361.31 (3). Where chs. SPS 361 to 366 refer to the department of safety and professional services, those rules shall be deemed for purposes of review under this chapter to refer to the department of health services.
(c) Life Safety Code NFPA 101 as identified in the Conditions of Participation, per s. 50.36, Stats.
(Note) Copies of the Life Safety Code NFPA documents are available at the National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471.
DHS 131.42 Fees for plan reviews.
(1) general. The fees established in this section shall be paid to the department for providing plan review services under this subchapter. The department may withhold providing services to parties who have past due accounts with the department for plan review services. The fee for review of plans shall be based on the total gross floor area of SPS Table 302.31-1 and on the dollar value of the project to the schedule under sub. (2).
(2) fee based on project dollar value.
Project Dollar Value
Fee
Less Than $4,999
$125
$5,000 - $12,249
$175
$12,500 - $24,999
$375
$25,000 - $49,999
$475
$50,000 - $99,999
$625
$100,000 - $249,999
$775
$250,000 - $499,999
$925
$500,000 - $749,999
$1,175
$750,000 - $999,999
$1,550
$1,000,000 - $2,499,999
$2,350
$2,500,000 - $4,999,999
$4,675
$5,000,000 - $9,999,999
$6,250
$10,000,000 - $19,999,999
$12,500
$20,000,000 And Over
$20,000
(3) Other Fee Provisions Related to Review of Plans.
(a) Fee for miscellaneous plans. Miscellaneous plans are plans that have no building or heating, ventilation and air conditioning plan submissions and for which there may not be an associated area. The fee for a miscellaneous plan shall be $250. This fee is for plan review and inspection. Miscellaneous plans include:
1. Footing and foundation plans submitted prior to the sub- mission of the building plans;
2. Structural plans submitted as independent projects, such as docks or, antennae; and
3. Plans for any building component, other than building and heating, ventilation and air conditioning, submitted following the final inspection by the department.
(b) Fee for permission to start construction. The fee for permission to start construction shall be $75. This fee shall apply only to applicants proposing to start construction prior to approval of their plans by the department.
(c) Fee for plan revision. The fee for revision of previously approved plans shall be $75. This paragraph applies when plans are revised for reasons other than those that were requested by the department. The department may not charge a fee for revisions requested by the department as a condition of original plan approval.
(d) Fee for extension of plan approval. The examination fee for a plan previously approved by the department for which an approval extension beyond the time limit specified in this chapter shall be $120 per plan.
(e) Fee for plan entry. In addition to the plan review and inspection fees for a project, each separate submission of plans for the project shall be accompanied by a $100.00 plan entry fee. When plans for multiple projects are submitted together, each project shall constitute a separate submission and requires a $100.00 plan entry fee.
(f)  Fee for petitions for variance. The fee for reviewing commercial building code petitions for variance shall be in accordance with SPS 302. The fee for reviewing a petition on a priority basis shall be in accordance with SPS 302.
SECTION 30. EFFECTIVE DATE: This rule shall take effect on the first day of the month following publication in the Wisconsin administrative register, as provided in § 227.22 (2) (intro.), Wis. Stats.
Loading...
Loading...
Links to Admin. Code and Statutes in this Register are to current versions, which may not be the version that was referred to in the original published document.