The recommended SSC will impact most of the Wisconsin River Basin located above Lake Wisconsin. This drainage area encompasses over 9,000 square miles including 21 counties and 85 cities and villages. As of March 2018, there are 109 individually permitted municipal and industrial dischargers in the basin, 14 permitted municipalities for urban storm water, and 26 CAFOs. There are also numerous permitted discharges covered under general permits and some individual permits that are characterized as pass through, meaning they utilized surface water for noncontact cooling water but have no phosphorus additives. In general, revising water quality criteria affects the calculation of water quality based effluent limitations for WPDES permit holders and can affect the calculation of wasteload and load allocations, in a TMDL. Other affected entities may include:
- Petenwell and Castle Rock Stewards (PACRS) and local residents and businesses: PACRS is a lake association and petitioned the legislature for the development of a TMDL to address water quality impairments due to phosphorus.
- Lake Wisconsin Alliance and local residents and businesses: The Lake Wisconsin Alliance is a lake association founded in 2014 that endeavors to balance the diverse interests of the Lake Wisconsin community while improving water quality, recreational opportunities, and sustaining a healthy ecosystem within the Lake Wisconsin watershed.
7. Summary and preliminary comparison with any existing or proposed federal regulation that is intended to address the activities to be regulated by the proposed rule:
40 CFR 131 Subparts A-C contain requirements for establishing state water quality standards.
40 CFR s. 131.4: States are responsible for establishing and revising water quality standards. U.S. EPA approves or disapproves standards under 40 CFR s. 131.5.
40 CFR 131.6: Water quality standards consist of designated uses and criteria to protect the designated uses.
40 CFR 131.11: States must adopt water quality criteria that protect designated uses. For waters with multiple uses, the criteria must protect the most sensitive use. 40 CFR 131.11(b)(1)(ii) authorizes states to adopt numeric water quality criteria that are “modified to reflect site-specific conditions.
40 CFR 131.20: Revision of state water quality standards is subject to public participation procedures and U.S. EPA review and approval under 40 CFR 131.20.
Wisconsin has authority under s. 281.15, Wis. Stats. to promulgate and revise water quality standards. Promulgation of site specific criteria for the three lakes would provide consistency with the federal regulations in 40 CFR 131.6 and 131.11 that require that criteria be based on protecting the designated uses of a waterbody.
8. Anticipated economic impact of implementing the rule (note if the rule is likely to have a significant economic impact on small businesses):
Adoption of recommended SSC will impact allocations resulting from the TMDL and thus have an economic impact, both through changes in compliance costs and the positive economic benefits associated with improvements in water quality. Adoption of recommended SSC for these waterbodies will have conflicting impacts for dischargers and businesses. The anticipated increased compliance cost from establishing SSC for the three waterbodies is estimated to be moderate ($1 million year in present worth). The estimated compliance costs reflect wastewater treatment cost (capital and O&M costs) at the facility. The cost savings (economic benefit) for facilities that will be associated with establishing SSC for the three waterbodies is estimated to be very significant ($11.5 million per year). We assume a 20-year period for compliance cost and benefit estimations in this section. The positive economic benefits associated with improvements in water quality are not factored into the costs.
For the 109 individually permitted wastewater treatment facilities:
- 3 facilities are already installing treatment capable of meeting effluent limits under both the current criteria and recommended SSC so the SSC will have no economic impact.
- 2 facilities that discharge to large wetland complexes may not be impacted by the SSC as the department currently believes the discharges do not impact downstream waters, so the SSC will have no economic impact.
- 20 facilities are already meeting effluent limits under both the current criteria and recommended SSC so the SSC will have no economic impact.
- 32 facilities have no change in effluent limits so the SSC will have no economic impact.
- 16 facilities will have similar treatment options under both the current criteria and recommended SSC such that it is unlikely the recommended SSC will shift compliance costs much in either direction.
For the remaining 36 wastewater treatment facilities, 29 of the facilities are municipal wastewater treatment plants and 7 are industrial facilities. The economic impact for these 36 facilities is summarized in Table 2.
Table 2: Wastewater Compliance Costs
# of Facilities
Total Present Worth Cost ($)
(20 years)
Annual Cost ($)
(20 years)
Municipal Facilities
Reduced Costs
19
93,617,625
5,593,602
Increased Costs
10
8,951,719
534,860
Industrial Facilities
Reduced Costs
5
86,115,333
5,895,862
Increased Costs
2
7,554,925
517,245
This equates to an estimated cost savings of $180 million for the 24 wastewater facilities; however, 12 facilities see an estimated increased compliance cost totaling $16.5 million.
Estimated compliance costs reflect wastewater treatment at the facility and do not consider alternative lower cost compliance options, such as water quality trading, adaptive management, or the multi-discharge variance, which if utilized could result in lower compliance costs. Cost estimates are expressed in present worth, assume a 20-year time period, and include both capital and O&M costs. An interest rate of 3.2% was used for industrial facilities and an interest rate of 1.76% was used for municipal facilities, reflecting the discounted rate available through the Clean Water Fund. Cost estimates utilize the analysis prepared by the Department of Administration for the multi-discharger variance.
For the 14 permitted municipalities with urban storm water permits, economic impacts cannot be estimated until municipalities conduct additional analysis; however, under the recommended SCC 12 permitted municipalities have less stringent reductions and 2 permitted municipalities (Baraboo and Portage) have more stringent reductions. The department reached out to municipal consultants for cost estimates; however, consultants were unable to provide compliance cost estimates. The department hopes to receive information on economic impacts from storm water sources during the rulemaking process. Factors such as capital costs, planning and design costs, and life-cycle costs cannot be estimated until municipalities evaluate potential compliance strategies. During the first permit term, municipalities are required to develop a compliance plan, including a timeline for compliance that varies based on needed reductions, redevelopment patterns, and economic resources. It is anticipated that estimated compliance costs will be generated over the next 5 years as municipalities evaluate their compliance options. In addition, municipalities have extended compliance timeframes that can extend over multiple permit terms making a present worth or annual cost estimate difficult to estimate.
This rule will not impose additional pollution reduction requirements for nonpoint sources and CAFOs as the establishment of the recommended SSC itself does not invoke any new regulatory requirements for nonpoint sources or CAFOs. Adoption of the TMDL does allow the Wisconsin River Basin to be eligible for additional federal funding to support implementation of nonpoint practices.
For Lake Wisconsin, the recommended SSC allows TMDL allocations to be assigned such that water quality and the designated uses can be attained for the lake. Attainment of the designated uses is anticipated to have economic benefits for recreational activities such as boating and fishing, small business involved in the service and tourism industry, and increased property values due to improved water quality.
9. Anticipated number, month and locations of public hearings:
The department anticipates holding 1 public hearing during or before the month of December 2018. The hearing will be held at the City of Portage public library to provide easy accessibility to those parties most directly affected within the watershed.
As part of the TMDL development process, public meetings have already been held outlining the impacts of the recommended SSC. Meetings were held in Rhinelander on March 5, 2018, two meetings were held in Stevens Point on March 6, 2018, two meetings were held on March 14, 2018 in Portage, and a statewide webinar was held on February 21, 2018. An additional public hearing will be held regarding the TMDL during or before July 2018.
Contact Person: Kevin Kirsch, PE Water Resource Engineer, Wisconsin Department of Natural Resources Kevin.Kirsch@wisconsin.gov 608-266-7019