This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
SPS 383.55(1)(b) (b) The owner of a POWTS existing prior to July 1, 2000, or the owner's agent shall report to the governmental unit or designated agent at the completion of each inspection, evaluation, maintenance or servicing event required under s. SPS 383.54 (4).
SPS 383.55(1)(c) (c) The owner of a POWTS is responsible for fulfillment of the reporting requirements under this section.
SPS 383.55(2) (2)The inspection, evaluation, maintenance and servicing reports required under sub. (1) shall be submitted to the governmental unit or designated agent in accordance with all of the following:
SPS 383.55(2)(a) (a) In a manner specified by the governmental unit or designated agent.
SPS 383.55(2)(b) (b) Within 30 calendar days from the date of inspection, evaluation, maintenance or servicing.
SPS 383.55(2)(c) (c) By the owner or the owner's agent.
SPS 383.55(3) (3)The inspection, evaluation, maintenance and servicing reports required under sub. (1) shall include the following information:
SPS 383.55(3)(a) (a) A POWTS identifying number.
SPS 383.55(3)(b) (b) The location of the POWTS.
SPS 383.55(3)(c) (c) The date of inspection, evaluation, maintenance or servicing.
SPS 383.55(3)(d) (d) The license, certification or registration number of the individual performing the inspection, evaluation, maintenance or servicing.
SPS 383.55(3)(e) (e) Other information required by the approved management plan.
SPS 383.55(4) (4)The department, governmental unit or designated agent may require verification of any information contained in an inspection, evaluation, maintenance and servicing report.
SPS 383.55 Note Note: This subsection does not require the maintaining of test data which is collected voluntarily and which is not being collected to determine compliance with this chapter.
SPS 383.55(5)(a)(a) The governmental unit or designated agent shall maintain records relating to the inspection, evaluation, maintenance and servicing of POWTS as specified in this section for a period of not less than 6 years.
SPS 383.55(5)(b) (b) Upon request by a governmental unit and the agreement of the department, the governmental unit may delegate to the department the responsibility to maintain records relating to the inspection, evaluation, maintenance and servicing of POWTS as specified in this section.
SPS 383.55 History History: Cr. Register, April, 2000, No. 532, eff. 7-1-00; CR 02-129: am. (1), (2), and (5) Register January 2004 No. 577, eff. 2-1-04; CR 07-100: am. (1), (2) (intro.), (b), (3) (intro.), (c), (d), (4) and (5), cr. (1) (c) Register September 2008 No. 633, eff. 10-1-08; correction in (1) (b) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 11-031: am. (1) (a), (b) Register June 2013 No. 690, eff. 7-1-13.
subch. VI of ch. SPS 383 Subchapter VI — Recognized Methods and Technologies
SPS 383.60 SPS 383.60Purpose.
SPS 383.60(1)(1)Specific types of methods and technologies may be recognized by the department under the voluntary product approval process in s. SPS 384.10 (3) as conforming with subchs. IV and V and may be utilized in the design of POWTS for a specific project.
SPS 383.60 Note Note: Subsection SPS 384.10 (3) delineates a process for the voluntary submittal of specific methods and technologies that are proposed to be utilized as POWTS holding, treatment or dispersal components and for the department's evaluation of such submittals. Methods and technologies recognized under this process may be utilized in any POWTS within the specifications and parameters of the method or technology. Methods and technologies recognized under this process do not require the submittal of data at the time of plan review and approval process under s. SPS 383.22 to substantiate the performance of the specific method or technology.
SPS 383.60 Note Note: Information regarding recognized methods and technologies may be downloaded at: dsps.wi.gov.
SPS 383.60(2) (2)This subchapter does not limit the use of other methods and technologies for POWTS or POWTS components the performance of which has been recognized under the plan review and approval process of s. SPS 383.22 or the voluntary product approval process of s. SPS 384.10 (3) or both.
SPS 383.60 Note Note: Section SPS 383.22 delineates the process for the submittal of a plan for a POWTS design to be utilized for a specific project at a specific site. Under this section methods and technologies for POWTS holding, treatment or dispersal components that have not been recognized under s. SPS 384.10 (3), require the submittal to the department of data or information to substantiate performance claims. The approval of a POWTS plan by the department under this section covers only a specific project at a specific site, and does not constitute the recognition of a method or technology for other projects or sites.
SPS 383.60 History History: Cr. Register, April, 2000, No. 532, eff. 7-1-00; CR 07-100: am. (1) Register September 2008 No. 633, eff. 10-1-08; correction in (1), (2) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
SPS 383.61 SPS 383.61Parameters for using acceptable methods and technologies. When a design of a POWTS for a specific project utilizes a method or technology recognized under s. SPS 384.10 (3), a deviation from the specifications and limitations relative to the installation and maintenance of that method or technology shall constitute a violation of this chapter.
SPS 383.61 History History: Cr. Register, April, 2000, No. 532, eff. 7-1-00; CR 07-100: renum. from Comm 83.62 Register September 2008 No. 633, eff. 10-1-08; correction made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
subch. VII of ch. SPS 383 Subchapter VII — Department Performance Monitoring
SPS 383.70 SPS 383.70Purpose.
SPS 383.70(1)(1)To address the desire for an ongoing source of information on the performance of POWTS system designs, the department shall maintain an ongoing performance-monitoring program for the various POWTS methods and technologies. The monitoring program shall be in addition to the periodic inspection and monitoring of POWTS under subch. V. The monitoring program shall be coordinated by the department in conjunction with the ongoing POWTS experimental and research program.
SPS 383.70(2) (2)The purpose of the performance monitoring program is to:
SPS 383.70(2)(a) (a) Provide additional information on the long-term performance of the various POWTS methods and technologies, to confirm their reliability, and to provide data for improvements; and
SPS 383.70(2)(b) (b) Monitor the various methods and technologies relative to long-term compliance with the groundwater standards.
SPS 383.70 History History: Cr. Register, April, 2000, No. 532, eff. 7-1-00.
SPS 383.71 SPS 383.71Department procedures.
SPS 383.71(1)(1)Both currently installed POWTS and newly installed POWTS may be included in the performance monitoring program conducted by the department.
SPS 383.71(2) (2)The department may include both the performance of individual POWTS treatment components as well as the output of components at the edge of the design treatment zone as part of the monitoring program.
SPS 383.71(4) (4)The department shall utilize the technical advisory committee assembled under s. SPS 384.10 (3) (c) 2. to advise the department on the performance-monitoring program. The committee shall advise the department in at least the following areas:
SPS 383.71(4)(a) (a) Development of performance monitoring protocols.
SPS 383.71(4)(b) (b) Selection of the POWTS methods and technologies to be monitored.
SPS 383.71(4)(c) (c) Identification of funding sources.
SPS 383.71(4)(d) (d) The interpretation of the results of the monitoring program.
SPS 383.71(5) (5)The decision by the department on the number, types and locations of methods and technologies to be monitored shall take into consideration at least the following factors:
SPS 383.71(5)(a) (a) The availability of other scientific data on the performance of a specific method or technology.
SPS 383.71(5)(b) (b) The number times of each method or technology may be utilized annually.
SPS 383.71(5)(c) (c) The likelihood that the method or technology will be adapted for soil and site conditions not previously utilized.
SPS 383.71(5)(e) (e) The risk factors associated with public health concerns and groundwater and surface water standards.
SPS 383.71(6) (6)The initial performance monitoring program undertaken by the department shall emphasize at least the following two circumstances:
SPS 383.71(6)(a) (a) Monitoring where there is a high density of systems.
SPS 383.71 Note Note: The initial focus would be on subdivisions with lots of 1.5 acres or less.
SPS 383.71(6)(b) (b) Monitoring where the depth of suitable in situ soil is near the minimum 6 inches specified under s. SPS 383.44 (3) (b) 1.
SPS 383.71(7)(a)(a) The department shall prepare an annual written report of performance-monitoring activities undertaken and the results of those activities.
SPS 383.71(7)(b) (b) The report under par. (b) shall be prepared annually and provided to the groundwater coordinating council assembled under s. 160.50, Stats.
SPS 383.71 History History: Cr. Register, April, 2000, No. 532, eff. 7-1-00; correction in (4) (intro.), (6) (b) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 23-006: r. (3), (5) (d), (7) (c) Register September 2023 No. 813, eff. 10-1-23.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.