SPS 382.365(3)(e)1.1. Stormwater and clearwater subsurface infiltration plumbing systems shall be designed to drain within 72 hours after a storm event.
SPS 382.365(3)(e)2.
2. By design, ground surface ponding shall drain within 24 hours after a storm event.
SPS 382.365(3)(f)1.1. Stormwater and clearwater subsurface infiltration plumbing systems shall be located as provided in Table 382.365-4, except for irrigation systems.
-
See PDF for table SPS 382.365(3)(f)2.
2. All stormwater and clearwater subsurface infiltration plumbing systems shall be separated from water wells by the applicable separation distances contained in chs.
NR 811 and
812 or as otherwise approved by the department of natural resources.
SPS 382.365(4)(a)
(a)
Orientation. Except for subsurface irrigation systems, all of the following shall apply:
SPS 382.365(4)(a)1.
1. The longest dimension of a stormwater or clearwater subsurface infiltration plumbing system consisting in part of in situ soil shall be oriented along the surface contour of the site location, unless otherwise approved by the department.
SPS 382.365(4)(a)2.
2. The infiltrative surface of a stormwater or clearwater subsurface infiltration plumbing system consisting in part of in situ soil and located below the surface of the original grade shall be level.
SPS 382.365(4)(b)1.1. A stormwater or clearwater subsurface infiltration plumbing system consisting in part of in situ soil may not be installed if the soil is frozen at the infiltrative surface.
SPS 382.365(4)(b)2.
2. Snow cover shall be removed before excavating or installing a stormwater or clearwater system component consisting in part of in situ soil.
SPS 382.365(4)(b)3.
3. For a stormwater or clearwater subsurface infiltration plumbing system consisting in part of in situ soil, the soil moisture content shall be evaluated immediately prior to installation of the component. If the soil evaluation at the infiltrative surface results in the sample capable of being rolled into a
¼ –inch wire, the installation may not proceed.
SPS 382.365 Note
Note: To accomplish a field test for soil wetness, a soil sample the size of one's palm may be rolled to form at least a ¼-inch wire.
SPS 382.365(4)(b)4.
4. All vessels and pipes of a stormwater or clearwater subsurface infiltration plumbing system shall be bedded in accordance with a product approval under s.
SPS 384.10 or a plan approval under s.
SPS 382.20.
SPS 382.365(5)(a)
(a)
General. Operation and maintenance shall be performed in accordance with the operation and maintenance plan submitted with the stormwater and clearwater subsurface infiltration plumbing system design and s.
SPS 382.36 (13), where applicable.
SPS 382.365(5)(b)1.1. Except as provided in subd.
2., no substance shall be discharged into a stormwater or clearwater subsurface infiltration plumbing system that results in exceeding the enforcement standards and preventive action limits specified in ch.
NR 140 Tables 1 and 2 at a point of standards application, pursuant to s.
160.21 (2), Stats.
SPS 382.365 Note
Note: For groundwater standard limits on various substances, refer to ch.
NR 140 Table 1.
SPS 382.365(5)(b)2.
2. Pursuant to s.
160.19 (2) (a), Stats., the department has determined that it is not technically or economically feasible to require that a stormwater or clearwater subsurface infiltration plumbing system treat wastewater to comply with the preventive action limit for chloride specified in ch.
NR 140 Table 2, as existed on June 1, 1998.
SPS 382.365 Note
Note: Section
160.19 (2) (a), Stats., reads: “Each regulatory agency shall promulgate rules which define design and management practice criteria for facilities, activities and practices affecting groundwater which are designed, to the extent technically and economically feasible, to minimize the level of substances in groundwater and to maintain compliance by these facilities, activities and practices with preventive action limits, unless compliance with the preventive action limits is not technically and economically feasible."
SPS 382.365(5)(b)3.
3. Pursuant to s.
160.21 (2), Stats., the point of standards application relative to the performance of stormwater and clearwater subsurface infiltration plumbing systems is any of the following:
SPS 382.365(5)(b)3.b.
b. Any point beyond the boundary of the property on which the facility, practice or activity is located.
SPS 382.365(5)(c)
(c)
Deleterious substance. Substances deleterious to a stormwater or clearwater subsurface infiltration plumbing system shall be intercepted, diluted or treated in accordance with s.
SPS 382.34 prior to the substance discharging into a stormwater or clearwater infiltration system.
SPS 382.365 History
History: CR 04-035: cr.
Register November 2004 No. 587, eff. 12-1-04; correction in (2) (a), (b) 1., 2., (3) (a), (b) 1., (c) 1., 2., (f) 1., (4) (b) 4., (5) (a), (c), Table 382.365-3 made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672;
CR 23-006: cr. (3) (am), renum. (3) (b) 1. to (3) (b) 1. (intro.) and am., cr. (3) (b) 1. a., b., (bm), r. (3) (c), Table 382.365-1 to Table 382.65-3 Register September 2023 No. 813, eff. 10-1-23; correction in (3) (b) 1. (intro.) made under s. 35.17, Stats., Register September 2023 No. 813. SPS 382.37
SPS 382.37 Sanitation facilities and campgrounds. SPS 382.37(1)(a)(a) Composting systems which employ water or other liquids as a transport medium for wastes shall conform with this subsection.
SPS 382.37 Note
Note: Composting systems where water or other liquids are not employed as a transport medium are addressed under ch.
SPS 391.
SPS 382.37(1)(b)
(b) The materials, design, construction and performance of a composting system which employs water or other liquids as a transport medium for wastes shall conform to NSF Standard 41.
SPS 382.37(1)(c)
(c) All composting systems shall be listed by a testing agency acceptable to the department.
SPS 382.37 Note
Note: For a listing of agencies acceptable to the department, see ch.
SPS 382 Appendix A-384.11.
SPS 382.37(1)(d)1.1. Components for the storage or treatment of wastes shall be continuously ventilated.
SPS 382.37(1)(e)1.1. The disposal of the end product from a composting system shall be in accordance with
40 CFR Part 503, Standards for the Use or Disposal of Sewage Sludge.
SPS 382.37 Note
Note: EPA materials relating to EPA 503, including, “Domestic Septage Regulatory Guidance: A Guide to the EPA 503 Rule", are available from the Office of Water Resource, US EPA, 401 M Street SW, Washington D.C. 20460.
SPS 382.37(1)(e)2.
2. The disposal of any liquid from a composting system shall be either to a publicly owned treatment works or a POWTS conforming to ch.
SPS 383.
SPS 382.37(1)(f)
(f) The connection of potable water supplies to a composting system shall be protected in accordance with s.
SPS 382.41.
SPS 382.37(1)(g)
(g) The drainage systems for the composting system shall conform to the applicable requirements of ss.
SPS 382.30 to
382.36 and the manufacturer's specifications.
SPS 382.37(2)(a)
(a) Sanitary dump stations which are used to receive domestic wastes and domestic wastewater from camping unit transfer tanks, RV transfer tanks, the holding tanks of travel trailers, recreational vehicles or other similar mobile vehicles, and transfer containers shall conform with this subsection.
SPS 382.37 Note
Note: See ch.
SPS 382 Appendix A-382.37 (2) for further explanatory material.
SPS 382.37(2)(b)
(b) The drain receptor for a sanitary dump station shall be at least 4
‶ in diameter.
SPS 382.37(2)(c)2.
2. The cover for the drain receptor shall be operable without touching the cover with one's hands.
SPS 382.37(2)(d)
(d) The drain receptor shall be surrounded by an impervious pad at least 6 feet in diameter. The pad shall be:
SPS 382.37(2)(d)1.
1. Pitched toward the drain receptor with a minimum slope of
¼‶ per foot; and
SPS 382.37(2)(f)
(f) The drain receptor for a sanitary dump station that is installed within an enclosed structure shall be vented in accordance with s.
SPS 382.31.
SPS 382.37(2)(g)
(g) A permanent supply of water shall be provided to wash down the drain receptor and pad. The water supply shall be:
SPS 382.37(2)(g)3.
3. The non-potable supply water for the wash down for the drain receptor must be located at least 50 feet from a potable water supply unless a variance is approved by the department under s.
SPS 382.20 (11).
SPS 382.37(3)(a)
(a)
Drain systems. Sewers serving campgrounds shall comply with the provisions in s.
SPS 382.30 and all of the following:
SPS 382.37(3)(a)1.
1. A drain line serving a recreational vehicle shall discharge to a minimum 4-inch diameter campsite receptor by means of an indirect waste pipe.
SPS 382.37(3)(a)2.
2. One campsite receptor shall be designed to serve no more than 4 recreational vehicles.
SPS 382.37(3)(a)3.
3. Where 2 or more drain lines are designed to discharge into the same campsite receptor, an increaser shall be installed in the vertical portion of the trap riser to accommodate the drains.
SPS 382.37(3)(a)4.
4. The rim of a campsite receptor shall terminate no less than 4 inches above the finished grade.
SPS 382.37(3)(a)5.
5. The rim of a campsite receptor shall not terminate at an elevation that is higher than the water supply termination serving the same site.
SPS 382.37(3)(a)6.
6. A vent is not required to serve the trap serving a campsite receptor.
SPS 382.37(3)(b)
(b) Water supply systems. Water supply systems serving campgrounds shall comply with the provisions in s.
SPS 382.40 and all of the following:
SPS 382.37(3)(b)1.
1. An accessible control valve shall be installed at the most upstream point of the campground water supply distribution system and downstream of the municipal meter or pressure tank.
SPS 382.37(3)(b)2.
2. If water is provided to a campsite, individual approved backflow protection shall serve each hose connection in accordance with s.
SPS 382.41.
SPS 382.37(3)(b)3.
3. A campsite water supply riser shall terminate no less than 18 inches above finished grade.
SPS 382.37(3)(b)4.
4. If a water supply is provided for individual campsites, water distribution to each individual campsite must comply with the requirements of chs.
SPS 381 to
387 and the water supplied may be used for the served campsite only.
SPS 382.37(3)(b)5.
5. The water connection to a camping unit may be plumbed directly if the fixtures comply with provisions of chs.
SPS 382 and
384.
SPS 382.37(3)(b)6.
6. A water connection to a camping unit may be made by NSF/ANSI 51 or 61 compliant hose if each camping unit is individually protected by approved cross connection control.
SPS 382.37 Note
Note: See ch.
SPS 382 Appendix for further explanatory material.
SPS 382.37 History
History: Cr.
Register, April, 2000, No. 532, eff. 7-1-00;
CR 02-002: cr. (2) (h) and (3)
Register April 2003 No. 568, eff. 5-1-03;
CR 08-055: am. (3) (b) 3.
Register February 2009 No. 638, eff. 3-1-09; correction in (1) (d) 2., (e) 2., (f), (g), (2) (e), (f), (g) 1., (h) 1., 2., (3) (a) (intro.), (b) (intro.), 2. made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672;
CR 23-006: am. (2) (a), (g) (intro.), cr. (2) (g) 3., (3) (b) 4. to 6. Register September 2023 No. 813, eff. 10-1-23; correction in (3) (b) 4. made under s. 35.17, Stats., Register September 2023 No. 813. SPS 382.38(1)(1)
Purpose. The purpose of this section is to establish allowable discharge points for wastewater discharging from plumbing systems.
SPS 382.38(2)
(2) Scope. The provisions of this section set forth the requirements for the discharge points for wastewater based on the use of the fixtures, appurtenances, appliances and devices discharging into the plumbing system.
SPS 382.38(3)(a)
(a) Wastewater from plumbing systems shall be discharged as specified in Table 382.38-1.
SPS 382.38(3)(b)
(b) Wastewater from uses other than those listed in Table 382.38-1, shall be discharged as specified by the department on a site-specific basis.
-
See PDF for table SPS 382.38 History
History: CR 02-002: cr.
Register April 2003 No. 568, eff. 5-1-03;
CR 02-129: am. Table 82.38-1 line 15
Register January 2004 No. 577, eff. 2-1-04;
CR 04-035: am. Table 82.38-1
Register November 2004 No. 587, eff. 12-1-04;
CR 08-055: am. Table 82.38-1
Register February 2009 No. 638, eff. 3-1-09; correction in (3) (a), (b), Table 382.38-1 made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672;
CR 23-006: cr. Table 382.38-1 lines 4m, 9g., 9r., footnote k Register September 2023 No. 813, eff. 10-1-23.