This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
SPS 302.66(1)(a)(a) Except as provided in par. (b), the fee for the request of a review by the department for a plumbing product under s. SPS 384.10 (2) or for an alternate standard under s. SPS 381.20 (2) shall be determined in accordance with Table 302.66. - See PDF for table PDF
SPS 302.66(1)(b) (b) The fee for a minor revision to a previously issued approval for an exterior grease interceptor, or prefabricated holding or treatment component for a POWTS shall be $70.00 plus $10.00 for each approval affected in lieu of the fee specified in Table 302.66. For the purpose of this subdivision, a minor revision shall be considered a modification that does not affect the function, retention capacity, basic shape or size of the tank. The expiration date of the original approval shall not be extended if the minor revision is approved.
SPS 302.66(1)(c)1.1. The fee for the request of an alternate approval to be issued by the department for a plumbing product shall be $400.00.
SPS 302.66(1)(c)2.a.a. Except as provided in subd. 2. b., the fee for the request of a revision or renewal of an alternate approval to be issued by the department for a plumbing product shall be $200.00.
SPS 302.66(1)(c)2.b. b. The fee for a minor revision to a previously issued alternate approval for an exterior grease interceptor, holding, septic or other sewage treatment tank shall be $70.00 plus $10.00 for each approval affected in lieu of the fee specified in subd. 2. a. For the purpose of this subparagraph, a minor revision shall be considered a modification that does not affect the function, retention capacity, basic shape or size of the tank, or the basis of the approval being classified as an alternate. The expiration date of the original approval shall not be extended if the minor revision is approved.
SPS 302.66(1)(d)1.1. The fee for the request of an experimental approval to be issued by the department for a plumbing product shall be $1,000.00.
SPS 302.66(1)(d)2. 2. The fee for the request of a revision or renewal of an experimental approval to be issued by the department for a plumbing material or product shall be $500.00.
SPS 302.66(1)(e) (e) The fee for a special inspection of an installation of a product, for which an experimental approval has been issued in accordance with s. SPS 384.50, shall be determined in accordance with s. SPS 302.04 (2).
SPS 302.66(2) (2)POWTS approvals and manufacturer changes.
SPS 302.66(2)(a)1.1. The fee for the request to have a method or technology reviewed as a POWTS holding, treatment or dispersal component or site constructed private onsite wastewater treatment system component by the department, in accordance with s. SPS 384.10 (3), shall be $400.00 per method, technology, or site constructed component.
SPS 302.66(2)(a)2. 2. The fee for the request of a revision or renewal of a method or technology reviewed as a POWTS holding, treatment or dispersal component or site constructed private onsite wastewater treatment system component by the department, in accordance with s. SPS 384.10 (3), shall be $150.00 per method, technology, or site constructed component.
SPS 302.66(2)(b) (b) The fee for the request of a change of manufacturer's name or address on an approval issued by the department for a plumbing product shall be $20.00. The expiration date of the original approval shall not be extended.
SPS 302.66 History History: Cr. Register, June, 1992, No. 438, eff. 7-1-92; emerg. am. Table 2.66 and (1) (b) 1., eff. 5-12-94; am. Table 2.66, (1) (b) 1., Register, October, 1994, No. 466, eff. 11-1-94; am. Table 2.66, (1) (d) 2. and r. and recr. (2) (a), Register, April, 2000, No. 532, eff. 7-1-00; am. (1) (e) and Table 2.66, Register, July, 2000, No. 535, eff. 9-1-00; CR 02-002: am. Table Register April 2003 No. 568, eff. 5-1-03; CR 02-129: am. (1) (a) Register January 2004 No. 577, eff. 2-1-04; CR 04-035: am. Table 2.66, r. (1) (b) 1., renum. (1) (b) 2. to be (1) (b) Register November 2004 No. 587, eff. 12-1-04; CR 07-100: am. Table 2.66 and (2) Register September 2008 No. 633, eff. 10-1-08; CR 08-039: am. (1) (b) to (d), (2) (a) 1., (b) and Table 2.66 Register November 2008 No. 635, eff. 12-1-08; correction in (1) (a), (b), (e), (2) (a) 1., 2. made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
SPS 302.67 SPS 302.67Sanitary permits.
SPS 302.67(1)(1)Fee.
SPS 302.67(1)(a)(a) Pursuant to s. 145.19 (5), Stats., the fee for a sanitary permit issued by a governmental unit shall be at least $141.00.
SPS 302.67 Note Note: Section 145.19 (5) of the Statutes was repealed in 2012; however, section 145.19 (2) of the Statutes requires a permit fee that is no less than the amount determined under the department's rules.
SPS 302.67(1)(b) (b) The fee for a sanitary permit issued by the department under s. SPS 383.21 shall be $300.00.
SPS 302.67(2) (2)Portion forwarded to the department. The governmental unit responsible for the regulation of private onsite wastewater treatment systems shall forward to the department $100.00 of each sanitary permit fee, determined in accord with s. 145.19, Stats.
SPS 302.67 Note Note: The $100.00 includes the $25.00 groundwater fee, required by s. 145.19 (6), Stats., that is forwarded to the department of natural resources.
SPS 302.67 History History: Cr. Register, June, 1992, No. 438, eff. 7-1-92; renum. and am. (1) to be (1) (a), cr. (1) (b) and am. (2), Register, April, 2000, No. 532, eff. 7-1-00; CR 08-039: am. Register November 2008 No. 635, eff. 12-1-08; correction in (1) (b) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
SPS 302.675 SPS 302.675Privy registrations.
SPS 302.675(1)(1)Vault privy. The fee for registering a vault privy that is to serve a state-owned facility shall be $70.00.
SPS 302.675(2) (2)Pit privy. The fee for registering a pit privy that is to serve a state-owned facility shall be $90.00.
SPS 302.675 History History: CR 02-129: cr. Register January 2004 No. 577, eff. 2-1-04; CR 08-039: am. Register November 2008 No. 635, eff. 12-1-08.
SPS 302.68 SPS 302.68Public swimming pool and water attraction plan review and inspection fees.
SPS 302.68(1)(1)Plan examination and inspection fees for public swimming pools, water attractions and associated slides shall accompany plans and specifications when submitted to the department for review. If the department determines, upon review of the plans, that inadequate fees were received, the necessary additional fees shall be received by the department prior to plan review and determination.
SPS 302.68(2) (2)Except as provided in sub. (3), plan examination and inspection fees for the construction or modification of public swimming pools, water attractions and associated slides shall be as listed in Tables 302.68-1 and 302.68-2.
SPS 302.68(3)(a)(a) Virginia Graeme Baker alterations.
SPS 302.68(3)(a)1.1. Fees for the review and approval of modifications to existing pools involving circulation systems or submerged suction outlets for the sole purpose of complying with the federal Virginia Graeme Baker Consumer Product Safety Commission rules shall be one of the following:
SPS 302.68(3)(a)1.a. a. Three hundred fifty dollars, if the modification inspection is performed by department staff.
SPS 302.68(3)(a)1.b. b. Two hundred dollars, if the modification inspection is not performed by department staff.
SPS 302.68(3)(a)2. 2. Modification inspections, beyond the initial modification inspection, performed by department staff for modifications to existing pools involving circulation systems or submerged suction outlets for the sole purpose of complying with the federal Virginia Graeme Baker Consumer Product Safety Commission rules shall be assessed in accordance with s. SPS 302.04 (2).
SPS 302.68(3)(b) (b) Alternate and experimental system design review. Fees for the review and approval of alternate and experimental system designs shall be as specified in Table 302.68-1. A fee for the minor revision to a previously approved alternate or experimental system design may be assessed. The expiration date of the original approval may not be extended if a minor revision is approved.
SPS 302.68(3)(d) (d) Reinspection fee. A fee of $300.00 may be assessed for a second or subsequent final inspection where the initial final inspection is scheduled and partially conducted by the inspector, and the pool installation is found to be incomplete. - See PDF for table PDF
a No additional fee required if submitted with public swimming pool or water attraction.
b Fee required per submittal of pool slides or drop slides.
c Applies to pool slides over 6 feet (1.8 m) in height measured from the slide entrance to the deck of the pool or water attraction. - See PDF for table PDF
a No additional fee required if submitted with public swimming pool or water attraction.
b Fee required per submittal of pool slides or drop slides.
c Applies to pool slides over 6 feet (1.8 m) in height measured from the slide entrance to the deck of the pool or water attraction.
SPS 302.68 History History: Emerg. cr. eff. 10-1-93; cr. Register, March, 1994, No. 459, eff. 4-1-94; r. and recr., Register, November, 2000, No. 539, eff. 12-1-00; CR 02-002: am. (1), (2) and Table 2.68-1, cr. Table 2.68-2 Register April 2003 No. 568, eff. 5-1-03; CR 04-052: am. (1) and (2) and Tables 2.68-1 and 2.68-2, cr. (3) (d) Register January 2005 No. 589, eff. 2-1-05; CR 05-038: r. (3) (a) and (c) Register October 2005 No. 598, eff. 11-1-05; CR 08-039: am. (3) (d) and Tables 2.68-1 and 2.68-2 Register November 2008 No. 635, eff. 12-1-08; EmR0934: emerg. cr. (3) (a), eff. 1-1-10; CR 09-116: cr. (3) (a), am. (3) (d) and Tables 2.68-1 and 2.68-2 Register May 2010 No. 653, eff. 6-1-10; correction in (2), (3) (a) 2., (b) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.