Chapter PSC 111
REQUIREMENTS FOR STRATEGIC ENERGY ASSESSMENTS, CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY, AND FIXED FINANCIAL PARAMETERS FOR CERTAIN RATE BASE ELECTRIC GENERATING FACILITIES
Subchapter I — General
PSC 111.03 Period covered by SEA; data; filing date. PSC 111.05 SEA filing procedures. PSC 111.07 Supplemental data requests for SEA; waivers. PSC 111.09 Confidentiality. Subchapter II — Assessment of Electric Demand
PSC 111.11 Electric demand data. PSC 111.13 Calculation of adjusted electric demand. Subchapter III — Assessment of Electric Power Supply
PSC 111.21 Capacity data. PSC 111.23 Capacity purchase and sale data affecting electric power supply. PSC 111.25 Calculation of electric power supply. Subchapter IV — Economic, Environmental, and Conservation Data
PSC 111.31 Economic data. PSC 111.33 Pollutant data. PSC 111.35 Energy conservation data. Subchapter V — Transmission System Operation Data
PSC 111.41 Transmission system reservations data from electricity providers. PSC 111.43 Data from transmission providers. Subchapter VI — CPCN Applications
PSC 111.51 CPCN applications for facilities – general. PSC 111.53 CPCN applications for large electric generating facilities. PSC 111.55 CPCN applications for high-voltage transmission lines. PSC 111.56 Expedited review. Subchapter VII — Fixed Financial Parameter Applications
PSC 111.62 Applicability. PSC 111.63 Information required. Subchapter VIII — Pre-Construction Notices
PSC 111.71 Notification of additional work areas. Ch. PSC 111 HistoryHistory: Chapter PSC 111 as it existed on June 30, 2000 was repealed and a new chapter PSC 111 was created, Register, June, 2000, No. 534, effective July 1, 2000. PSC 111.01PSC 111.01 Definitions. The definitions specified in ss. 196.01 and 196.491 (1), Stats., apply to this chapter. In addition, in this chapter: PSC 111.01(3g)(3g) “Commence construction” means site clearing, excavation, placement of facilities, or other substantial action adversely affecting the natural environment of the site or physical modification to equipment at the site that would not be required if the proposed project was not approved, but does not include borings necessary to determine foundation conditions or other preconstruction monitoring or surveying to establish background information related to site or environmental suitability. PSC 111.01(3r)(3r) “Department” means the Wisconsin department of natural resources. PSC 111.01(4)(4) “Electricity provider” means any of the following: PSC 111.01(4)(a)(a) Any person who owns, operates, manages or controls, or expects to own, operate, manage or control generation larger than 5 MW in Wisconsin. PSC 111.01(4)(b)(b) Any person who provides retail electric service in Wisconsin. PSC 111.01(5)(5) “FERC” means the federal energy regulatory commission. PSC 111.01(10)(10) “Net rated capacity” means a generation facility’s maximum electrical output, in MW, net of electricity use internal to the generation facility, under the ambient conditions expected during peak demand. PSC 111.01(12)(12) “NOx” means all oxides of nitrogen except nitrous oxide. PSC 111.01(14)(14) “Self-provider” means any person, other than an operator of a wholesale merchant plant, who meets all of the following: PSC 111.01(14)(a)(a) The person owns, operates, manages or controls, or expects to own, operate, manage or control generation larger than 5 MW. PSC 111.01(14)(b)(b) The person uses or will use all or a portion of the generation to satisfy the person’s own demand. PSC 111.01(14)(c)(c) The person sells or will sell any excess generation only to an electric public utility. PSC 111.01(16)(16) “Transmission provider” means any person who owns, operates or controls, or expects to own, operate or control electric transmission facilities in Wisconsin. PSC 111.01(17)(17) “Wholesale electricity supplier” means any entity that is a wholesale generation and transmission cooperative or a municipal electric company under s. 66.0825, Stats. PSC 111.01 HistoryHistory: Cr. Register, June, 2000, No. 534, eff. 7-1-00; correction in (17) made under s. 13.93 (2m) (b) 7., Stats., Register September 2005 No. 597; CR 07-044: cr. (3g) and (3r) Register May 2008 No. 629, eff. 6-1-08. PSC 111.03PSC 111.03 Period covered by SEA; data; filing date. PSC 111.03(1)(a)(a) The SEA is biennial, covering 2 calendar years. All data required in subch. II, III, IV or V to be filed for the 7-year period encompassing the SEA shall cover this 2-year period, plus 5 succeeding calendar years, or fewer succeeding calendar years if a shorter time period is stated. PSC 111.03(1)(b)(b) The first SEA shall cover the period commencing January 1, 2000, and ending on December 31, 2001. PSC 111.03(1)(c)(c) Subsequent SEAs shall commence on January 1 of each even-numbered year. PSC 111.03(1)(d)(d) The commission shall issue its draft of the SEA on or before July 1 of each even-numbered year, as required by s. 196.491 (2) (b), Stats. PSC 111.03(2)(c)(c) The 5 years of historical data for the initial SEA shall cover January 1, 1995, through December 31, 1999 and contain actual, historical data through December 31, 1998. To the extent actual data are unavailable for 1999, the initial SEA shall contain forecasted data and the forecasting worksheets. PSC 111.03(3)(a)(a) The initial submission of data required under this chapter shall occur no later than February 15, 2000.