Register October 2023 No. 814
Chapter NR 812
WELL CONSTRUCTION AND PUMP INSTALLATION
Subchapter I — General
NR 812.03 Cooperation with the department.
NR 812.04 Contracts for noncomplying installations.
NR 812.05 Disposal of pollutants; injection prohibition.
NR 812.06 Drinking water standards.
NR 812.08 Water well, reservoir and spring location.
NR 812.09 Department approvals.
NR 812.091 Product and component approvals.
Subchapter II — New Water Well and Heat Exchange Drillhole Construction and Reconstruction and Filling and Sealing of Wells and Drillholes
NR 812.10 Well driller and well constructor requirements.
NR 812.11 Well construction equipment and materials.
NR 812.12 General drilled type well construction requirements.
NR 812.13 Drilled wells terminating in unconsolidated formations.
NR 812.14 Drilled wells in bedrock formations.
NR 812.151 Heat exchange drillhole location and construction requirements.
NR 812.152 Construction requirements for potable high capacity wells, potable school wells, and wastewater treatment plant wells.
NR 812.18 Welding procedures.
NR 812.19 Well plumbness and alignment.
NR 812.20 Grouting and sealing.
NR 812.22 Well rehabilitation and batch chlorination.
NR 812.23 Driven point wells.
NR 812.24 Dug type well design and construction.
NR 812.26 Well and drillhole filling and sealing.
Subchapter III — Requirements for New Pump Installations and Water Treatment
NR 812.27 Pump installer requirements.
NR 812.28 Pump installation equipment and supply pipe.
NR 812.29 Height of finished well.
NR 812.30 Vermin-proof well caps and seals.
NR 812.31 Pitless adapters and pitless units.
NR 812.33 Water storage vessels.
NR 812.34 Sample faucets.
NR 812.37 Water treatment.
NR 812.38 Injection of fertilizers or pesticides for agricultural purposes.
NR 812.39 High capacity well water level and water usage measurement.
NR 812.40 Above ground pumphouses.
NR 812.41 Disinfection, flushing and sampling.
Subchapter IV — Standards for Existing Installations
NR 812.42 Criteria for evaluation.
Subchapter V — Variances
Subchapter VI — Property Transfer Well Inspections
NR 812.44 Property transfer well inspections.
Subchapter VII — Citations
Subchapter VIII — Water sampling, analysis and reporting requirements
NR 812.46 Water sampling, analysis and reporting requirements.
Ch. NR 812 Note
Note: Chapter NR 112 as it existed on September 30, 1975 was repealed and a new Chapter NR 112 was created effective October 1, 1975. Chapter NR 112 as it existed on January 31, 1991 was repealed and a new Chapter NR 112 was created effective February 1, 1991; Chapter NR 112 was renumbered Chapter NR 812 under s. 13.93 (2m) (b) 1., Stats.,
Register, September, 1994, No. 465.
NR 812.01(1)(1)
The purpose of this chapter is to establish uniform minimum standards and methods in conformity with chs.
280 and
281, Stats., for:
NR 812.01(1)(a)
(a) Obtaining or extracting groundwater for any purpose; and
NR 812.01(1)(b)
(b) Protecting groundwater and aquifers from contamination through adequate construction and reconstruction of water systems.
NR 812.01(1)(c)
(c) Evaluating, locating, and identifying wells and pressure systems at the time of a property transfer.
NR 812.01(2)
(2) This chapter shall govern the location, construction or reconstruction, maintenance and inspection of wells and water systems and heat exchange drillholes, the filling and sealing of wells and drillholes and the installation and maintenance of pumping and treatment equipment.
NR 812.01 History
History: Cr.
Register, January, 1991, No. 421, eff. 2-1-91; am. (1) (a),
Register, September, 1994, No. 465, eff. 10-1-94; correction in (1) (intro.) made under s. 13.93 (2m) (b) 7., Stats.,
Register, December, 1998, No. 516;
CR 13-096: am. (2),
CR 13-099: cr. (1) (c), am. (2)
Register September 2014 No. 705, eff. 10-1-14;
2015 Wis. Act 197 s.
42 Register April 2016 No. 724.
NR 812.02(1)(1)
For the purposes of construction and installation, the provisions of this chapter apply to all new and existing water systems and drillholes with the following exceptions: