NR 811.89(4)
(4) Each aquifer storage recovery well shall be enclosed within a lockable protective structure that is secured from tampering or unauthorized entry in a manner that is approved by the department.
NR 811.89(5)
(5) Each monitoring well shall be enclosed within a lockable protective covering and secured from tampering or unauthorized entry in a manner that is approved by the department.
NR 811.89 History
History: CR 09-073: cr.
Register November 2010 No. 659, eff. 12-1-10.
NR 811.90
NR 811.90 Equipment, appurtenances and piping for ASR wells and ASR systems. NR 811.90(1)(1)
Pumping equipment, appurtenances and piping that are to be installed as part of an ASR system shall comply with the requirements of ss.
NR 811.30 to
811.37.
NR 811.90(2)
(2) Department approval shall be obtained prior to installation or modification of any well, pumping equipment, appurtenances or piping for the purpose of aquifer storage recovery.
NR 811.90(3)
(3) Security shall be provided for each ASR well site in a manner that is approved by the department.
NR 811.90 History
History: CR 09-073: cr.
Register November 2010 No. 659, eff. 12-1-10.
NR 811.91
NR 811.91 ASR system pilot studies. NR 811.91(1)(1)
Department approval is required prior to conducting any ASR system pilot study.
NR 811.91(2)
(2) Only a municipal water system may perform an ASR system pilot study.
NR 811.91(3)
(3) A request to conduct an ASR system pilot study shall be submitted to the department in writing. The request shall identify the location of each existing well that is being considered for use as an ASR well within the proposed ASR system, the location of any new well that is anticipated to be constructed for use as an ASR well within the proposed ASR system and any additional wells that are to be used or constructed as part of the ASR system pilot study.
NR 811.91(4)
(4) Each request to conduct an ASR system pilot study shall contain all of the following:
NR 811.91(4)(a)
(a) A preliminary hydrogeologic report that describes the methods and results of any hydrologic investigation, aquifer testing, hydrogeologic modeling or geochemical modeling performed to identify the location of the proposed ASR system well sites. The preliminary hydrogeologic report shall identify the location of each existing public or private water well and each potential source of groundwater contamination that is located within 1200 feet of the outer perimeter of the displacement zone that is calculated to be established around each of the proposed ASR wells within the proposed ASR system. The report shall also identify the well selected for further evaluation during the ASR well pilot test, identify the dimensions of the displacement zone that will be created around the designated test well, and describe the current and anticipated groundwater flow patterns found in the vicinity of the designated test well.
NR 811.91(4)(b)
(b) A preliminary engineering report that provides an analysis of the technical feasibility for developing each of the potential ASR wells identified for the proposed ASR system and estimates the probable percentage of treated drinking water that would be recovered from each of the potential ASR wells during an ASR cycle.
NR 811.91(4)(c)
(c) Plans and specifications for any well equipment, pumping equipment, appurtenances or piping that is to be constructed or altered in order to complete the proposed ASR system pilot study.
NR 811.91(4)(d)
(d) A description of all operating procedures to be followed during the ASR well pilot study. This description shall contain details including the maximum volume of water to be placed underground, the flow rate and pressure of underground injection, the expected water storage period, anticipated water retrieval rates, and methods proposed for disposing of the water recovered during the ASR system pilot study.
NR 811.91(4)(e)
(e) A description of all performance and compliance monitoring procedures to be followed during the ASR system pilot study. This description shall include a listing of the sampling locations, methods and schedules that will be used to ensure that the aquifer storage recovery well remains in compliance with the performance requirements set forth in s.
NR 811.88.
NR 811.91(4)(f)
(f) Plans and specifications for each monitoring well proposed as part of the ASR system pilot study. A minimum of one monitoring well is required as part of the ASR system pilot study. The department may require additional monitoring wells should the proposed ASR system encompass multiple or otherwise unique geologic formations. The department may also waive the monitoring well requirement if water quality data from other ASR system pilot studies conducted in similar geologic conditions is submitted as part of the ASR system pilot study request and is determined to be applicable by the department.
NR 811.91(5)
(5) The department may require modification of plans and specifications, operating procedures or compliance and monitoring procedures required in sub.
(4) to ensure that compliance with the performance requirements in s.
NR 811.88 can be determined.
NR 811.91(6)
(6) Within 180 days after completing an approved ASR system pilot study or prior to recovering any water retrieved through an ASR well into a water distribution system, a municipal water system shall submit a final report on the ASR system pilot study to the department.
NR 811.91 History
History: CR 09-073: cr.
Register November 2010 No. 659, eff. 12-1-10.
NR 811.92
NR 811.92 ASR system development testing. NR 811.92(1)(1)
Department approval shall be obtained prior to any ASR system development testing.
NR 811.92(2)
(2) Following the completion of an approved ASR system pilot study, each additional ASR well that is to be developed within an ASR system shall be subject to ASR system development testing.
NR 811.92(3)
(3) The department may require monitoring wells to be installed as part of an ASR system development test if it finds any of the following:
NR 811.92(3)(a)
(a) Geologic conditions in the vicinity of the proposed ASR well are not consistent with the conditions examined during the municipal water system's ASR system pilot study.
NR 811.92(3)(b)
(b) Geologic conditions in the vicinity of the proposed ASR well are not consistent with the conditions reported in other ASR system pilot studies or ASR system development tests performed by other municipal water systems.
NR 811.92(3)(c)
(c) Results obtained during the municipal water system's ASR system pilot study or other aquifer tests indicate that additional monitoring is warranted to ensure compliance with the water quality standards established in chs.
NR 140 and
809.
NR 811.92(4)
(4) Each request for an ASR system development test shall include a report or testing plan that contains the following:
NR 811.92(4)(a)
(a) A comparison of the hydrogeologic conditions and formations found at the ASR system pilot study well site and any well site that is to be evaluated as part of the ASR system development testing request.
NR 811.92(4)(b)
(b) An evaluation of the municipal water system's ASR system pilot test results and the transferability of those results to any well that is to be included as part of the ASR system development test.
NR 811.92(4)(c)
(c) Plans and specifications for any well equipment, pumping equipment, appurtenances or piping that is to be constructed or altered as part of the ASR system development test.
NR 811.92(4)(d)
(d) A description of all operating procedures to be followed during the ASR system development test. This description shall contain details such as, but not limited to, the volume of water to be placed underground, the flow rate and pressure of underground injection, backflushing schedules, the expected water storage period, anticipated water retrieval rates and methods for disposing of water recovered during the ASR system development test.
NR 811.92(4)(e)
(e) A description of all performance and compliance monitoring procedures to be followed during the ASR system development test.
NR 811.92(4)(f)
(f) A description of any monitoring wells proposed to be constructed or utilized during the ASR system development test.
NR 811.92(5)
(5) The department may require modification of plans and specifications, operating procedures or compliance and monitoring procedures required under sub.
(4) to ensure that compliance with the performance requirements in s.
NR 811.88 can be determined.
NR 811.92(6)
(6) Within 180 days after completing an approved ASR system development test or prior to recovering any water retrieved through any newly developed aquifer storage recovery well into a water distribution system, the municipal water system conducting the test shall submit a final report containing the final results of the investigation to the department.
NR 811.92(7)
(7) The department may deny a request to perform an ASR system development test if it determines that the test cannot be conducted in a manner that is protective of human health or the environment. Whenever a request to perform an ASR system development test is denied, the department shall provide the person who submitted the request for an ASR development test with a written explanation of the reasons for denying the request.
NR 811.92 History
History: CR 09-073: cr.
Register November 2010 No. 659, eff. 12-1-10.
NR 811.93(1)(1)
Department approval to operate an ASR system shall be obtained prior to recovery of any water retrieved through an aquifer storage recovery well into a municipal water system.
NR 811.93(2)
(2) Only the owner of a municipal water system may submit a request to operate an ASR system.
NR 811.93(3)
(3) Completion of an ASR pilot study is required before a municipal water system may submit a request to operate an ASR system.
NR 811.93(4)
(4) Completion of an ASR system development test and approval of the department is required before any additional aquifer storage recovery well that was not approved as part of an original request to operate an ASR system is connected to the existing ASR system.
NR 811.93(5)
(5) A request to operate an ASR system shall be submitted to the department in writing and shall contain the following:
NR 811.93(5)(a)
(a) A copy of the final report of the approved ASR system pilot study and copies of any approved ASR system development studies conducted by the municipal water system.
NR 811.93(5)(b)
(b) A final plans and specifications report that describes the components of the ASR system. The final plans and specifications report shall include as built drawings for each aquifer storage recovery well and each monitoring well that was constructed as part of the ASR system pilot study or ASR system development study. The report shall also include descriptions of pumping equipment, piping and other appurtenances that are installed or required for ASR system operation.
NR 811.93(5)(c)
(c) A proposed final operating plan that describes the entire ASR cycle and shows how the ASR system will be integrated into municipal water system operations. The proposed final operating plan shall contain details including the total volume of water to be injected, rate of injection, pressure of injection, length of the water storage period, rate of recovery, post-recovery water treatment techniques necessary to maintain a distribution system disinfectant residual, and methods for disposing of any water that cannot be recovered into the water distribution system.
NR 811.93(5)(d)
(d) A proposed demand management and water accountability plan that describes actions which the municipal water system is currently conducting or will be initiating to ensure that groundwater and surface water resources are conserved and used as efficiently as possible.
NR 811.93(5)(e)
(e) A proposed compliance and monitoring plan that lists all sampling parameters and provides details on monitoring schedules, monitoring locations, sampling methods and quality assurance techniques that will be followed to ensure that compliance with the requirements set forth in s.
NR 811.88 is maintained. The compliance and monitoring plan shall provide for testing of the water that is to be injected, stored and recovered through each aquifer storage recovery well and for the groundwater present in any monitoring well that is installed as part of the ASR system. Parameters to be analyzed for each water quality sample collected, the locations for sample collection and the frequency at which water quality samples are to be collected shall be determined by the department following a review of the final ASR system pilot study report or ASR system development study report, the proposed operating plan, the proposed monitoring plan and the drinking water quality monitoring schedule currently followed by the municipal water system. Unless otherwise specified by the department, all water quality results obtained from ASR system compliance monitoring activities shall be compiled and submitted to the department on an annual basis and at least 45 days prior to the start of each new ASR cycle.
NR 811.93(6)
(6) The department may require modification of any plans and specifications, operating plans, demand management and water accountability plans or compliance and monitoring plans required in sub.
(5) in any manner necessary to ensure compliance with the performance standards set forth in s.
NR 811.88.
NR 811.93(7)
(7) If requested, the department may consider and approve the modification of plans and specifications, operating plans, demand management and water accountability plans or compliance and monitoring plans required in sub.
(5) if information submitted in support of a requested modification demonstrates to the satisfaction of the department that the proposed modifications will continue to ensure compliance with the standards set forth in s.
NR 811.88 and any other applicable requirements contained in ch.
NR 811.
NR 811.93 History
History: CR 09-073: cr.
Register November 2010 No. 659, eff. 12-1-10.