NR 747.30(2)(t) (t) Costs that exceed the maximum reimbursement established under s. NR 747.68 (7) (d).
NR 747.30(2)(u) (u) Costs for unauthorized work performed more than 5 business days after the department issues a disqualification notice under s. NR 747.70 (4) (d).
NR 747.30(2)(v) (v) Costs for any work performed between the due date of any submittal required under this subchapter and the date a past-due submittal is actually submitted.
NR 747.30(2)(w) (w) Costs for performance bonds.
NR 747.30(2)(x) (x) Costs incurred that exceed caps established by the department unless written department approval is received prior to performance of the corresponding work.
NR 747.30(3) (3)Penalized ineligibles.
NR 747.30(3)(a)1.1. The costs in par. (b) are considered to be grossly ineligible for reimbursement.
NR 747.30(3)(a)2. 2. An award for a claim which includes any costs in par. (b) and which was prepared and submitted by an owner or operator or person owning a home oil tank system shall be reduced to exclude those costs, and shall then be further reduced by 50 percent of the total amount of those costs.
NR 747.30(3)(a)3. 3. A consultant who prepares a submitted claim that includes any costs in par. (b) shall pay to the department an amount equal to 50 percent of the total amount of those costs, and the award for the claim shall be reduced to exclude those costs.
NR 747.30(3)(b)1.1. Costs incurred on or before August 1, 1987, for a remediation.
NR 747.30(3)(b)2. 2. Costs for cleanup resulting from spills from petroleum transportation equipment.
NR 747.30(3)(b)3. 3. Costs for investigations or remedial action activities conducted outside the state of Wisconsin.
NR 747.30(3)(b)4. 4. Costs associated with emptying, cleaning, or disposing of storage tank systems, and other costs associated with closing or removing any petroleum product storage tank system or home oil tank system after November 1, 1991 — unless the claimant has a contract for those services that was signed before November 1, 1991; or has a loan agreement, note, or commitment letter for a loan for the purposes of conducting those services, that was executed before November 1, 1991.
NR 747.30(3)(b)5. 5. Laboratory rush charges, unless related to an approved emergency action.
NR 747.30(3)(b)6. 6. Air travel.
NR 747.30(3)(b)7. 7. Costs associated with tank-system upgrades or retrofits, and any corresponding compliance with other state or federal rules or laws, and future business plans.
NR 747.30(3)(b)8. 8. Costs for repairing, retrofitting, or replacing a petroleum product storage system or home oil tank system, such as for tank bedding materials or fill for setting tanks, lines, or canopies.
NR 747.30(3)(b)9. 9. Costs associated with capital improvements, reinstallation of electrical power, dispensers, pumps, or other items for retrofits, upgrades, or new construction, unless written department approval is received prior to performance of the corresponding work.
NR 747.30(3)(b)10. 10. Costs associated with concrete, blacktop replacement, on-site landscaping, or other improvements; except for depreciation costs for third-party actions, or for asphalt or concrete patching associated with well abandonment, or where written department approval is received prior to performance of the corresponding work.
NR 747.30(3)(b)11. 11. Costs associated with razing of buildings, removal of roads, removal of footings and foundations, or other destruction of structures, or other redevelopment costs, unless written department approval is received prior to performance of the corresponding work.
NR 747.30(3)(b)12. 12. The opportunity cost of money, or interest income or dividend income lost because of a decision to use internal funding for a remediation.
NR 747.30(3)(b)13. 13. Subcontractor markups for work performed after January 31, 1993. This subdivision does not apply to work that is included in a public bidding contract executed under s. NR 747.69 (1).
NR 747.30(3)(b)14. 14. Costs associated with general program support and office operation which are expected to be included in the hourly staff rates, such as telephone charges, photocopying, faxes, paper, printing, postage, hand tools, personal protective equipment, computer equipment, computer-aided-design, and software charges.
NR 747.30 Note Note: For the purposes of this section, photo ionization detectors, flame ionization detectors, electronic equipment, and sampling kits are not considered hand tools.
NR 747.30(3)(b)15. 15. Costs reimbursed by insurance companies unless performing in an agent role.
NR 747.30(3)(b)16. 16. Costs associated with fees required by any other state agency, such as fees authorized by s. 292.55, Stats., and fees listed in ch. NR 749, except department closure review fees incurred prior to October 29, 1999.
NR 747.30(4) (4)Claims including ineligible costs. Claims submitted which include ineligible costs shall be considered incomplete and may be returned to the claimant for recalculation, revision and re-submittal. The claim shall be rescheduled for review when the ineligible costs have been removed and the claim received by the department. The department may disallow interest costs accrued during the non-response period, as specified in s. NR 747.12 (3) (a).
NR 747.30(5) (5)Areas of contamination containing eligible and ineligible products. When an area of contamination is identified which contains both eligible and ineligible products under the fund, the following shall apply:
NR 747.30(5)(a) (a) Costs associated with the eligible products may be claimed. Any costs that are required only because of the presence of an ineligible product may not be claimed.
NR 747.30(5)(b) (b) The owner or operator and the department shall be notified immediately. The consultant, in conjunction with the owner or operator, shall propose a methodology to the department for dividing the costs of remediation between the eligible and ineligible products. Department approval of a methodology shall be obtained by the owner or operator prior to the submittal of any claims.
NR 747.30 History History: Cr. Register, February, 1994, No. 458, eff. 3-1-94; r. and recr. (4), Register, December, 1998, No. 516, eff. 1-1-99; CR 04-058: renum. (1) (a) to be Comm 47.10 (1) (a) 3. and am., renum. (1) (intro.), (2) (a) 2., 5. to 7., 9., 10., 14., 15., (d) 3. to 5., 7., (e) 4., (3) and (4) to be (2) (a) 1. to 8., (d) 1. to 4., (e) 3., (4) and (5) and am. (1) (a), (2) (a) 7., and (5) (intro.) and (a), am. (1) (b) 2., 4., (2) (b) 7. and 8., r. (1) (b) 5., (2) (a) 1., 3., 4., 8., 11. to 13., (c) 3., (d) (intro.), 1., 2., 6., 8., and (e) 3., r. and recr. (2) (h) to (k), cr. (2) (L) to (x) and (3), Register February 2006 No. 602, eff. 5-1-06; correction in (1) (b) 1., (2) (d) 2., (i) to (u), (3) (b) 13., (4) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; corrections in (1) (b) 1., (c) 4., (2) (intro.), (a) 7., (b) 7., (c) 2., (d) 2., (h) to (u), (3) (b) 16., (4) made under s. 13.92 (4) (b) 6., 7., Stats., Register October 2013 No. 694.
NR 747.305 NR 747.305Costs associated with loans.
NR 747.305(1) (1)Interest expense.
NR 747.305(1)(a)(a) Allowability of interest costs. The fund will reimburse interest expense if a loan is specifically secured for a remediation and the proceeds are applied only to the cleanup at the site. To be eligible, interest costs cannot be combined with retrofits or construction loans and shall be site specific. Reasonable money management shall be practiced to avoid unnecessary accrual of interest charges. Interest expenses shall be managed in the most cost-effective manner possible and invoices shall be paid in a timely manner to avoid interest costs or late charges. If a line of credit is used to provide funding for a remediation, clear documentation shall be provided on the disbursements and interest expenses.
NR 747.305(1)(b) (b) Ineligible interest expenses. The PECFA fund shall not reimburse for the following items:
NR 747.305(1)(b)1. 1. The opportunity cost of money or interest income or dividend income lost because of a decision to use internal funding for a remediation;
NR 747.305(1)(b)2. 2. Interest costs which are not clearly documented;
NR 747.305(1)(b)3. 3. Interest costs or late charges on invoices or bills.
NR 747.305(1)(b)4. 4. Additional interest costs accrued for the use of PECFA loan proceeds to earn money or for investment purposes.
NR 747.305(1)(b)5. 5. Interest costs which are specified in s. 292.63 (4) (c) 8., Stats.
NR 747.305 Note Note: Section 292.63 (4) (c) 8., Stats., reads as follows: “Interest costs incurred by an applicant that exceed interest at the following rate:
NR 747.305 Note a. If the applicant has gross revenues of not more than $25,000,000 in the most recent tax year before the applicant submits a claim, 1% under the prime rate.
NR 747.305 Note b. If the applicant has gross revenues of more than $25,000,000 in the most recent tax year before the applicant submits a claim, 4%."
NR 747.305(1)(b)6. 6. Interest costs which are ineligible under s. 292.63 (4) (cc), Stats.
NR 747.305 Note Note: Section 292.63 (4) (cc), Stats., reads as follows: “Ineligibility for interest reimbursement. 1. a. Except as provided in subd. 1m. or 2., if an applicant's final claim is submitted more than 120 days after receiving written notification that no further remedial action is necessary with respect to the discharge, interest costs incurred by the applicant after the 60th day after receiving that notification are not eligible costs.
NR 747.305 Note c. Except as provided in subd. 2., if an applicant does not complete the investigation of the petroleum product discharge by the first day of the 61st month after the month in which the applicant notified the department under sub. (3) (a) 3. or October 1, 2003, whichever is later, interest costs incurred by the applicant after the later of those days are not eligible costs.
NR 747.305 Note 1m. If an applicant received written notification that no further remedial action is necessary with respect to a discharge before September 1, 2001, and the applicant's final claim is submitted more than 120 days after September 1, 2001, interest costs incurred by the applicant after the 120th day after September 1, 2001, are not eligible costs.
NR 747.305 Note 2. Subdivision 1. does not apply to any of the following:
NR 747.305 Note a. An applicant that is a local unit of government, if federal or state financial assistance other than under this section, has been provided for that expansion or redevelopment.
NR 747.305 Note b. An applicant that is engaged in the expansion or redevelopment of brownfields, as defined in s. 238.13 (1) (a), if federal or state financial assistance other than under this section, has been provided for that expansion or redevelopment."
NR 747.305 Note Note: Other sections of this code may also specify interest costs that are ineligible for reimbursement, such as ss. NR 747.12 (3) (c) and 747.30 (2) (i) and (j).
NR 747.305(1)(c) (c) Maximum interest and related costs.
NR 747.305(1)(c)1.1. The following maximum rates are established for loans secured after January 31, 1993, and before October 15, 1997, for the purposes of a remediation:
NR 747.305(1)(c)1.a. a. Interest rate shall be reimbursable at no more than 2% above the prime rate.
NR 747.305(1)(c)1.b. b. Loan origination fees from the same lender shall be reimbursable only once, and at no more than 2 points of the loan principal. Where a later, larger loan is obtained to pay off a preceding loan, the origination fee for the portion of the later loan that equals the preceding principal will not be reimbursed. A duplicative loan origination fee from a subsequent lender will not be reimbursed, unless the preceding loan was terminated by a different lender.
NR 747.305(1)(c)2. 2. The following maximum rates are established for loans secured on or after October 15, 1997, for the purposes of a remediation:
NR 747.305(1)(c)2.a. a. Interest rate shall be reimbursable at no more than 1% above the prime rate.
NR 747.305(1)(c)2.b. b. Loan origination fees from the same lender shall be reimbursable only once, and at no more than 2 points of the loan principal. Where a later, larger loan is obtained to pay off a preceding loan, the origination fee for the portion of the later loan that equals the preceding principal will not be reimbursed. A duplicative loan origination fee from a subsequent lender will not be reimbursed, unless the preceding loan was terminated by a different lender.
NR 747.305(1)(d) (d) Annual services fees. Annual loan service fees charged on or before April 20, 1998, shall be reimbursable at no more than 1% of the unreimbursed amount and remaining available loan balance. Annual loan service fees charged after April 20, 1998, shall be reimbursable at no more than 1% of the outstanding unreimbursed loan amount.
NR 747.305(1)(e) (e) Documentation. A copy of the loan agreement documenting the interest rate, loan origination fees, and other costs, shall be submitted when requested by the department.
NR 747.305(1)(f) (f) Lending agreements. In lieu of the maximum rates specified in par. (d), the department may negotiate agreements with lending institutions to obtain lower rates. The department may solicit proposals from lending institutions to supply loans for PECFA remediations.
NR 747.305(1)(g) (g) Other items. In addition to the maximum rates established in par. (c), the following shall apply:
NR 747.305(1)(g)1. 1. Annual loan service fees shall be charged no more frequently than once annually, and at a rate of no more than 1% on the outstanding balance.
NR 747.305(1)(g)2. 2. Original and re-estimated loan amounts, to the extent feasible, shall reflect a sound estimate of the cost to perform the remediation. Excessive estimates which result in excessive or unnecessary interest costs may not be reimbursed by the PECFA fund.
NR 747.305(2) (2)Minimum loan amounts. A lending institution may unilaterally establish a minimum loan amount of $100,000 or less. Minimum loan amounts of more than $100,000 and loan origination fees on minimum loans of more than $100,000 shall require prior written approval of the department.
NR 747.305 History History: Cr. Register, February, 1994, No. 458, eff. 3-1-94; r. and recr. (1) (c) to (f), cr. (1) (g), Register, December, 1998, No. 516, eff. 1-1-99; CR 04-058: am. (1) (b) 3. and 4., (c) 1. b., 2. b. and (g) 1., cr. (1) (b) 5. and 6., Register February 2006 No. 602, eff. 5-1-06; correction in (1) (b) 5. made under s. 13.92 (4) (b) 7., Stats., Register October 2013 No. 694.
NR 747.31 NR 747.31Incentives for cost-effective remediation.
NR 747.31(1)(1)General. The department may make incentives available to responsible parties who use the most cost-effective remediation methods and alternatives or participate in the voluntary bundling of sites for remediation purposes.
NR 747.31(2) (2)Incentives. For claimants who participate in the voluntary bundling of sites or for remediations that have approval as closed remedial actions and eligible costs not exceeding $60,000, excluding interest, the claim may receive priority review in the award process.
NR 747.31 History History: Cr. Register, February, 1994, No. 458, eff. 3-1-94; am. Register, December, 1998, No. 516, eff. 1-1-99; CR 04-058: am. (2) Register February 2006 No. 602, eff. 5-1-06.
NR 747.325 NR 747.325Usual and customary costs.
NR 747.325(1) (1)Application. This section applies to all work covered under this chapter, for all occurrences previously or newly reported to the department, that is performed after May 1, 2006, except it does not apply to any of the following:
NR 747.325(1)(a) (a) Work for which a reimbursement cap has been determined through the competitive public bidding process established under s. 292.63 (3) (cp), Stats.
NR 747.325(1)(b) (b) Work performed as part of an emergency action, within the initial 72 hours after the onset of the need for the action.
NR 747.325(1)(c) (c) Work performed for home oil tank systems.
NR 747.325(2) (2)Cost schedule. Any cost for items that are commonly associated with claims under this chapter, which exceeds the amounts listed in the department's schedule of usual and customary costs, as published and in effect while the work was performed, may not be reimbursed, except as provided in sub. (3).
NR 747.325 Note Note: The department of commerce promulgated rule order CR 07-032, relating to the schedule of usual and customary costs for the petroleum environmental cleanup fund awards, which was filed with the revisor of statutes bureau for publication in the October 2007 Wisconsin Administrative Register. The department directed that the schedule not be published in the Wisconsin Administrative Code as it is a “form" under s. 227.23, Stats., available as described in the next note, consistent with the requirements of s. 227.23 (3), Stats.
NR 747.325 Note Note: The department's schedule of usual and customary costs is reviewed for updating in January and July of each year to reflect changes in actual costs. The current schedule, and all preceding versions, are posted at http://dnr.wi.gov/topic/brownfields/pecfa.html, under petroleum programs and PECFA.
NR 747.325 Note Note: The schedule of usual and customary costs limits the per-unit reimbursement for various, commonly associated tasks. For caps on reimbursement for items that are not commonly associated with claims, or for caps on the scope of work for a particular task or occurrence, other sections of this chapter may apply, such as s. NR 747.337 (2), which addresses the maximum allowable cost for a site investigation and the development of a remedial action plan, and subch. VI, which addresses competitive public bidding.
NR 747.325(3) (3)Exceeding the schedule. The maximum reimbursement amounts established under sub. (2) may be exceeded only in accordance with all of the following:
NR 747.325(3)(a) (a) Higher costs must be incurred in order to comply with s. 292.63 (3) (c) 3., Stats., and with enforcement standards established under ch. 160, Stats.
NR 747.325(3)(b) (b) The higher costs, as needed under par. (a), are specifically approved in writing by the department prior to performance of the corresponding work.
NR 747.325 Note Note: Under s. 292.63 (3) (c) 3., Stats., a responsible party is required to “conduct all remedial action activities at the site of the discharge from the petroleum product storage system or home oil tank system necessary to restore the environment to the extent practicable and minimize the harmful effects from the discharge as required under s. 292.11, Stats."
NR 747.325(4) (4)Classification of occurrences.
NR 747.325(4)(a)(a) No later than 30 days after May 1, 2006, the responsible party or agent for each occurrence reported to the department by May 1, 2006, shall complete and submit to the department an occurrence-classification form prescribed by the department, except as provided in par. (c).
NR 747.325(4)(b) (b) If an occurrence-classification form required under par. (a) is not submitted in accordance with par. (a), the department may not reimburse costs for any work performed between May 1, 2006, and the date the department receives the form.
NR 747.325(4)(c) (c) An occurrence-classification form is not required where the only remaining work consists of submitting a claim or completing the conditions in a conditional closure letter from the department.