This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 667.0073(2)(e) (e) Records and results of inspections as required by s. NR 667.0015 (4) (keep these data for a minimum of 3 years).
NR 667.0073(2)(f) (f) Monitoring, testing or analytical data and corrective action when required by subch. F and ss. NR 667.0191, 667.0193, 667.0195, 664.1034 (3) to 664.1034 (6), 664.1035, 664.1063 (4) to 664.1063 (9), 664.1064, 664.1088, 664.1089, and 664.1090.
NR 667.0073(2)(g) (g) All closure cost estimates under s. NR 667.0142.
NR 667.0073(2)(h) (h) A certification, at least annually, that you have a program in place to reduce the volume and toxicity of hazardous waste generated, to the degree that you determine to be economically practicable, and that the proposed method of treatment or storage is that practicable method currently available to minimize the present and future threat to human health and the environment.
NR 667.0073(2)(i) (i) For an on-site treatment facility, the information contained in the notice (except the manifest number) and the certification and demonstration, if applicable, required under s. NR 668.07.
NR 667.0073(2)(j) (j) For an on-site storage facility, the information in the notice (except the manifest number) and the certification and demonstration, if applicable, required under s. NR 668.07.
NR 667.0073(2)(k) (k) For an off-site treatment facility, a copy of the notice and the certification and demonstration, if applicable, required by the generator or the owner or operator under s. NR 668.07.
NR 667.0073(2)(L) (L) For an off-site storage facility, a copy of the notice and the certification and demonstration, if applicable, required by the generator or the owner or operator under ss. NR 668.07.
NR 667.0073 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction in (2) (a) made under s. 35.17, Stats., and correction in (2) (k), (L) made under s. 13.92 (4) (b) 7., Stats., Register July 2017 No. 739.
NR 667.0074 NR 667.0074Who sees the records?
NR 667.0074(1)(1)You shall furnish all records, including plans, required under this chapter upon the request of any officer, employee, or representative of the department and make them available at all reasonable times for inspection.
NR 667.0074(2) (2)The retention period for all records required under this chapter is extended automatically during the course of any unresolved enforcement action involving the facility or as requested by the department.
NR 667.0074 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17.
NR 667.0075 NR 667.0075What reports shall I prepare and to whom do I send them? The owner or operator shall prepare an annual report and other reports listed in sub. (2).
NR 667.0075(1) (1)Annual report. Prepare and submit a single copy of an annual report to the department by March 1 of each year. The annual report shall be submitted on forms specified by the department. The report shall cover facility activities during the previous calendar year and shall include:
NR 667.0075(1)(a) (a) The EPA identification number, name, and address of the facility.
NR 667.0075(1)(b) (b) The calendar year covered by the report.
NR 667.0075(1)(c) (c) The method of treatment or storage for each hazardous waste.
NR 667.0075(1)(d) (d) The most recent closure cost estimate under s. NR 667.0142.
NR 667.0075(1)(e) (e) A description of the efforts undertaken during the year to reduce the volume and toxicity of generated waste.
NR 667.0075(1)(f) (f) A description of the changes in volume and toxicity of waste actually achieved during the year in comparison to previous years to the extent such information is available for the years prior to 1984.
NR 667.0075(1)(g) (g) The certification signed by you.
NR 667.0075 Note Note: Information on annual reporting is available at: http://dnr.wi.gov/topic/waste/annualreport.html
NR 667.0075(2) (2)Additional reports. In addition to submitting the annual reports, you shall also report to the department:
NR 667.0075(2)(a) (a) Releases, fires, and explosions as specified in s. NR 667.0058 (2).
NR 667.0075(2)(b) (b) Facility closures specified in s. NR 667.0117.
NR 667.0075(2)(c) (c) As otherwise required by subchs. I, J, and DD and subchs. AA, BB, and CC of ch. NR 664.
NR 667.0075(3) (3)For off-site facilities, the EPA identification number of each hazardous waste generator from which the facility received a hazardous waste during the year; for imported shipments, the report shall give the name and address of the foreign generator.
NR 667.0075(4) (4)A description and the quantity of each hazardous waste the facility received during the year. For off-site facilities, this information shall be listed by EPA identification number of each generator.
NR 667.0075 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction in (2) (c) made under s. 35.17, Stats., Register July 2017 No. 739.
NR 667.0076 NR 667.0076What notifications shall I make? Before transferring ownership or operation of a facility during its operating life, the owner or operator shall notify the new owner or operator in writing of the requirements of this chapter and subch. J of ch. NR 670.
NR 667.0076 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction made under s. 35.17, Stats., Register July 2017 No. 739.
subch. F of ch. NR 667 Subchapter F — Releases from Solid Waste Management Units
NR 667.0090 NR 667.0090Who shall comply with this section? This subchapter applies to you if you own or operate a facility that treats or stores hazardous waste under a subch. J of ch. NR 670 standardized license, except as provided in s. NR 667.0001 (2), or unless your facility already has a license that imposes requirements for corrective action under s. NR 664.0101.
NR 667.0090 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction made under s. 35.17, Stats., Register July 2017 No. 739.
NR 667.0101 NR 667.0101What shall I do to address corrective action for solid waste management units?
NR 667.0101(1)(1)You shall institute corrective action as necessary to protect human health and the environment for all releases of hazardous waste or constituents from any solid waste management unit at the facility, regardless of the time at which waste was placed in such unit.
NR 667.0101(2) (2)The department shall specify corrective action in the supplemental portion of your standardized license in accordance with this section and subch. S of ch. NR 664. The department shall include in the supplemental portion of your standardized license schedules of compliance for corrective action (where corrective action cannot be completed prior to issuance of the license) and assurances of financial responsibility for completing corrective action.
NR 667.0101(3) (3)You shall implement corrective action beyond the facility property boundary, where necessary to protect human health and the environment, unless you demonstrate to the satisfaction of the department that, despite your best efforts, you were unable to obtain the necessary permission to undertake such actions. You are not relieved of all responsibility to clean up a release that has migrated beyond the facility boundary where off-site access is denied. On-site measures to address such releases will be determined on a case-by-case basis. You shall provide assurances of financial responsibility for corrective action.
NR 667.0101(4) (4)You are not required to comply with this section if you are the owner or operator of a remediation waste site unless your site is part of a facility that is subject to a license for treating, storing, or disposing of hazardous wastes that are not remediation wastes.
NR 667.0101 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction in (2) made under s. 35.17, Stats., Register July 2017 No. 739.
subch. G of ch. NR 667 Subchapter G — Closure
NR 667.0110 NR 667.0110Does this subchapter apply to me? This subchapter applies to you if you own or operate a facility that treats or stores hazardous waste under a subch. J of ch. NR 670 standardized license, except as provided in s. NR 667.0001 (2).
NR 667.0110 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction made under s. 35.17, Stats., Register July 2017 No. 739.
NR 667.0111 NR 667.0111What general standards shall I meet when I stop operating the unit?
NR 667.0111(1)(1)Minimizes the need for further maintenance.
NR 667.0111(2) (2)Controls, minimizes, or eliminates, to the extent necessary to protect human health and the environment, postclosure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition products to the ground or surface waters or to the atmosphere.
NR 667.0111(3) (3)Meets the closure requirements of this subchapter and the requirements of ss. NR 667.0176, 667.0201, and 667.1108. If you determine that, when applicable, the closure requirements of ss. NR 667.0201 (tanks), or 667.1108 (containment buildings) cannot be met, then you shall close the unit according to the requirements that apply to landfills (s. NR 664.0310). In addition, for the purposes of postclosure care and financial responsibility, the tank system or containment building is then considered to be a landfill and you shall apply for a long-term care license according to ch. NR 670.
NR 667.0111 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17.
NR 667.0112 NR 667.0112What procedures shall I follow?
NR 667.0112(1)(1)To close a facility, follow your department-approved closure plan and follow notification requirements.
NR 667.0112(1)(a) (a) Submit your closure plan at the time you submit your notice of intent to operate under a standardized license. Final issuance of the standardized license constitutes approval of the closure plan and the plan becomes a condition of the standardized license.
NR 667.0112(1)(b) (b) The department's approval of the plan shall ensure that the approved plan is consistent with ss. NR 667.0111 to 667.0115, 667.0176, 667.0201, and 667.1108.
NR 667.0112(2) (2)Satisfy the requirements for content of closure plan. The closure plan shall identify steps necessary to perform partial and final closure of the facility. The closure plan shall include, at least:
NR 667.0112(2)(a) (a) A description of how each hazardous waste management unit at the facility subject to this subchapter will be closed according to s. NR 667.0111.
NR 667.0112(2)(b) (b) A description of how final closure of the facility will be conducted according to s. NR 667.0111. The description shall identify the maximum extent of the operations which will be unclosed during the active life of the facility.
NR 667.0112(2)(c) (c) An estimate of the maximum inventory of hazardous wastes ever on site during the active life of the facility and a detailed description of the methods you shall use during partial and final closure, such as methods for removing, transporting, treating, storing, or disposing of all hazardous wastes and identification of the types of off-site hazardous waste management units to be used, if applicable.
NR 667.0112(2)(d) (d) A detailed description of the steps necessary to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during partial or final closure. These steps may include procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standards.
NR 667.0112(2)(e) (e) A detailed description of other activities necessary during the closure period to ensure that partial or final closure satisfies the closure performance standards.
NR 667.0112(2)(f) (f) A schedule for closure of each hazardous waste management unit and for final closure of the facility. The schedule shall include, at a minimum, the total time required to close each hazardous waste management unit and the time required for intervening closure activities that allow tracking of progress of partial or final closure.
NR 667.0112(2)(g) (g) For facilities that use trust funds to establish financial assurance under s. NR 667.0143 and that are expected to close prior to the expiration of the license, an estimate of the expected year of final closure.
NR 667.0112(3) (3)You may submit a written notification to the department for a license modification to amend the closure plan at any time prior to the notification of partial or final closure of the facility, following the applicable procedures in s. NR 670.320.
NR 667.0112(3)(a) (a) Events leading to a change in the closure plan, and therefore requiring a modification, may include:
NR 667.0112(3)(a)1. 1. A change in the operating plan or facility design.
NR 667.0112(3)(a)2. 2. A change in the expected year of closure, if applicable.
NR 667.0112(3)(a)3. 3. In conducting partial or final closure activities, an unexpected event requiring a modification of the approved closure plan.
NR 667.0112(3)(b) (b) The written notification or request shall include a copy of the amended closure plan for review or approval by the department. The department shall approve, disapprove, or modify the amended plan according to the procedures in s. NR 670.320.
NR 667.0112(4) (4)Notification before final closure.
NR 667.0112(4)(a) (a) Notify the department in writing at least 45 days before the date that you expect to begin final closure of a treatment or storage tank, container storage area, or containment building.
NR 667.0112(4)(b) (b) The date when you expect to begin closure shall be no later than 30 days after the date that any hazardous waste management unit receives the known final volume of hazardous wastes.
NR 667.0112(4)(c) (c) If your facility's license is terminated, or if you are otherwise ordered, by the department, or required by judicial decree or final order under 42 USC 6928 to cease receiving hazardous wastes or to close then the requirements of this subsection do not apply. However, you shall close the facility following the deadlines established in s. NR 667.0115 unless earlier deadlines are set in a department order, judicial decree, or final order under 42 USC 6928.
NR 667.0112 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17.
NR 667.0113 NR 667.0113Will the public have the opportunity to comment on the plan? The department shall provide the owner or operator and the public, when the draft standardized license is public noticed, the opportunity to submit written comments on the plan and to the draft license as allowed by s. NR 670.508. The department shall also, in response to a request or at the owner or operator's own discretion, hold a public hearing whenever such a hearing might clarify one or more issues concerning the closure plan and the license.
NR 667.0113(2) (2)The department shall give public notice of the hearing 30 days before it occurs. Public notice of the hearing may be given at the same time as notice of the opportunity for the public to submit written comments and the two notices may be combined.
NR 667.0113 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17.
NR 667.0115 NR 667.0115After I stop operating, how long until I shall close?
NR 667.0115(1)(1)Within 90 days after the final volume of hazardous waste is sent to a unit, treat or remove from the unit all hazardous wastes following the approved closure plan.
NR 667.0115(2) (2)You shall complete final closure activities according to the approved closure plan within 180 days after the final volume of hazardous wastes is sent to the unit. The department may approve an extension of 180 days to the closure period if you comply with all applicable requirements for requesting a modification to the license and demonstrate that:
NR 667.0115(2)(a) (a) The final closure activities will take longer than 180 days to complete due to circumstances beyond your control, excluding ground water contamination.
NR 667.0115(2)(b) (b) You have taken and will continue to take all steps to prevent threats to human health and the environment from the unclosed, but not operating hazardous waste management unit or facility, including compliance with all applicable license requirements.
NR 667.0115(2)(c) (c) The demonstration shall be made at least 30 days prior to the expiration of the initial 180-day period.
NR 667.0115(3) (3)Nothing in this subsection precludes you from removing hazardous wastes and decontaminating or dismantling equipment according to the approved final closure plan at any time before or after notification of final closure.
NR 667.0115 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17.
NR 667.0116 NR 667.0116What shall I do with contaminated equipment, structure and soils? You shall properly dispose of or decontaminate all contaminated equipment, structures, and soils during the partial and final closure periods. By removing any hazardous wastes or hazardous constituents during partial and final closure, you may become a generator of hazardous waste and shall handle that waste following all applicable requirements of ch. NR 662.
NR 667.0116 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17.
NR 667.0117 NR 667.0117How do I certify closure? Within 60 days of the completion of final closure of each unit under a subch. J of ch. NR 670 standardized license, you shall submit to the department, by registered mail, a certification that each hazardous waste management unit or facility, as applicable, has been closed following the specifications in the closure plan. Both you and a qualified professional engineer shall sign the certification. You shall furnish documentation supporting the independent registered professional engineer's certification to the department upon request until the department releases you from the financial assurance requirements for closure under s. NR 667.0143 (9).
NR 667.0117 History History: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction made under s. 35.17, Stats., Register July 2017 No. 739.
subch. H of ch. NR 667 Subchapter H — Financial Requirements
NR 667.0140 NR 667.0140Who must comply with this subchapter, and briefly, what do they have to do?
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.