This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 503.10(2)(g)1. 1. A title sheet shall be included indicating the project title, who prepared the plans, the date the plans were prepared, the applicant for whom the plans were prepared, a table of contents, a map showing the location of the landfill within the county or multi-county area, the location of the county or multi-county area within the state and the area to be served.
NR 503.10(2)(g)2. 2. An existing conditions plan shall be included consisting of a detailed topographic map of the proposed landfill and all areas within 1,200 feet of the proposed limits of filling prior to development. The minimum scale shall be 1 = 200 feet with a maximum 2 foot contour interval. The contour interval selected shall be sufficiently small to clearly show surface water flow patterns within and around the landfill. All elevations shall be related to USGS datum. The plan shall identify and define the following:
NR 503.10(2)(g)2.a. a. Surface waters including intermittent and ephemeral streams and wetlands.
NR 503.10(2)(g)2.b. b. Property boundaries, the proposed landfill boundary and the proposed limits of filling.
NR 503.10(2)(g)2.c. c. A north arrow, landfill survey grid, a formula for converting grid locations to the state plane coordinate system and the locations of all existing and proposed survey monuments.
NR 503.10(2)(g)2.d. d. Residential and commercial structures and other buildings.
NR 503.10(2)(g)2.e. e. Locations of all soil borings, all existing and abandoned groundwater monitoring wells, all public and private water supply wells and the general locations of all known septic system drain fields within 1,000 feet of the landfill area or within 500 feet of any monitoring well.
NR 503.10(2)(g)2.f. f. The locations of all other landfills, and all other solid waste facilities for the processing, storage or composting of solid wastes.
NR 503.10(2)(g)2.g. g. Utility lines, underground pipelines and electrical lines, access control and other constructed topographic and drainage features.
NR 503.10(2)(g)3. 3. Plan sheets shall be included which depict the sub-base grades, all sub-base appurtenances such as lysimeters or drain pipes and the base grades.
NR 503.10(2)(g)4. 4. Separate plan sheets shall be included to depict the overall landfill area and the limits of liner construction and filling. The plan sheets shall depict the layout and slope of the liner system and leachate collection system including pipes, sumps, riser pipes on interior sideslopes, manholes, trenches, berms, lift stations, permanent storm water control structures, pipe cleanouts and other pertinent structures. Invert elevations shall be provided at any changes in grade for all leachate and groundwater collection and transfer systems.
NR 503.10(2)(g)5. 5. A series of phasing plan sheets shall be included to show landfill development through time. The location of peripheral features such as support buildings, access roads, drainage ditches, sedimentation basins, any other storm water management features, and screening berms shall be indicated on this plan. At a minimum, a separate plan sheet shall be provided for initial construction and for each subsequent phase of development or new area where substantial construction is to be performed. These subsequent phasing plan sheets shall present the final filling surfaces in the previous phases of development; the limits of clearing, grubbing and topsoil removal; the base grades of the new phase of filling; the anticipated surface contours of soil stockpiles at the time depicted on the plan sheet; and storm water management features. Each plan shall include a list of construction items and quantities necessary to prepare the phase of development indicated on the plan.
NR 503.10(2)(g)6. 6. Plan sheets shall be included which depict the features to be constructed for storm water management at the time of initial construction, during phased development, and after closure of the landfill. Plan sheets shall include the locations of sediment basins, drainage ditches, auxiliary sediment traps, and the anticipated extent of cleared ground and stockpiles during each major phase of landfill development. Plan sheets shall include a list of anticipated actions and materials needed for sediment and erosion control.
NR 503.10(2)(g)7. 7. A final topography plan sheet shall be included to indicate the appearance of the entire landfill following closure including surface water drainage features and the location of gas vents and all other penetrations of the final cover.
NR 503.10(2)(g)8. 8. A landfill monitoring plan shall be included to show the location of the design management zone as determined under s. NR 140.22 (3) and all devices for the monitoring of leachate quality and quantity, unsaturated zone water quality and flow rate, groundwater quality, surface water quality, gas production, gas migration and surface settlement.
NR 503.10(2)(g)9. 9. A long-term care plan sheet shall be included showing the topography of the landfill following closure. This plan shall list those items anticipated to be performed during the period of long-term care including the proposed schedule for monitoring and maintenance of the landfill. This information may be included on the final topography plan sheet if clarity is not compromised or reference may be made to the appropriate section of the operations manual and design report.
NR 503.10(2)(g)10. 10. A minimum of 2 cross-sections drawn perpendicular and parallel to the landfill baseline through the major dimensions of the landfill shall be included. These cross-sections shall be drawn on the cross-section plans required under sub. (2) (e) 2. The location of the cross-sections shall be illustrated by a reduced scale plan view on each cross-section. Each combined engineering and geologic cross-section shall show:
NR 503.10(2)(g)10.a. a. Existing grades.
NR 503.10(2)(g)10.b. b. Sub-base, base, top of leachate collection blanket grades and final grades.
NR 503.10(2)(g)10.c. c. Soil borings and monitoring wells which the section passes through or is adjacent to.
NR 503.10(2)(g)10.d. d. Soil and bedrock types. For clarity, a number or symbol shall be used to label major soil units instead of extensive shading.
NR 503.10(2)(g)10.e. e. Stabilized water table contours.
NR 503.10(2)(g)10.f. f. Leachate collection and monitoring systems.
NR 503.10(2)(g)10.g. g. Gas venting or extraction and monitoring systems.
NR 503.10(2)(g)10.h. h. Limits of waste filling.
NR 503.10(2)(g)10.i. i. Erosion, storm water and sediment control structures.
NR 503.10(2)(g)10.j. j. Access roads and ramps on the perimeter of the disposal area and within the active fill area.
NR 503.10(2)(g)10.k. k. The filling sequence or phasing interfaces, and other landfill features.
NR 503.10(2)(g)11. 11. Cross sections shall be included to illustrate all important construction features of the liner, final cover, lysimeters, leachate collection trenches and sumps, liner penetrations, sideslope risers, piping systems for gas and gas condensate and drainage systems for storm water.
NR 503.10(2)(g)12. 12. Detailed plan view sheets shall be included for header lines or drain lines outside the limits of filling, with notations of pipe slope and intersection elevations with appurtenances such as manholes, lift stations and collection tanks.
NR 503.10(2)(g)13. 13. Drawings showing details and typical sections shall be included for storm water control structures; access roads; fencing; final cover and base liner systems; leachate and gas control systems such as pipe bedding, manholes, transfer lines, force mains and storage tanks; leachate transfer lines which extend through the liner; groundwater and unsaturated zone monitoring devices; and buildings. This plan sheet shall include all other construction details such as leachate and waste containment berms between subsequent phases of development.
NR 503.10(2)(h) (h) The report shall contain an operations manual and design section which shall comply with ss. NR 500.05 and 504.05 to 504.11 and, at a minimum, shall contain the following information:
NR 503.10(2)(h)1. 1. A discussion of the considerations and rationale behind design of the discretionary aspects of the major engineering features which are not explicitly required by state or federal regulations. This shall include base grade configuration and relationship to subsurface conditions, liner design, phases of landfill development and closure, traffic routing, storm water management, erosion, and sediment control measures, gas ventilation systems, final cover systems and monitoring systems. Specific attention shall be given to sidewall penetrations, sideslope riser and sump areas, and piping located outside of the limits of filling. In addressing each of the items in this subdivision, the report shall indicate how the anticipated waste types and characteristics influenced the chosen design.
NR 503.10(2)(h)2. 2. A discussion of initial preparations and construction methods relating to clearing and grubbing, topsoil stripping and other excavations; soil storage and visual screening development; storm water control features; base liner and granular drainage layers; leachate collection and gas venting systems; access roads and entrance area screening and fencing; environmental monitoring device installation and other special design features.
NR 503.10(2)(h)3. 3. A description of storm water management at the time of initial construction, during phased development and after closure of the landfill. The report shall include narrative demonstrating compliance with s. NR 504.09. The report shall describe in detail temporary and permanent erosion and sediment control measures and indicate how these measures will accomplish the concepts in s. NR 504.09 (1) (b). The report shall include the specifications for design of sediment basins, culverts, drainage ditches, auxiliary sediment traps, and the anticipated extent of cleared ground and stockpiles during each major phase of landfill development. The report shall include a list of anticipated actions and materials needed for sediment and erosion control. The report shall describe a maintenance and follow-up program designed to meet the concepts in s. NR 504.09 (1) (b). The report shall include schedules for the following activities: cleaning sediment basins and ditches; seeding and stabilization of stockpiles and drainage channels; and topsoiling, seeding and stabilization of disturbed areas and areas affected by erosion.
NR 503.10(2)(h)4. 4. Specifications for the proposed gradations of soil materials and the proposed size of the perforations used in the leachate collection system piping. The report shall include an analysis of the pipe and soil materials to demonstrate whether the gradation of sand and gravel and the pipe opening sizes are stable and self-filtering. The report shall describe the use of filter layers or other mechanisms used to maintain the porosity in the leachate collection blanket, collection trenches and sumps.
NR 503.10(2)(h)5. 5. A description of the daily landfill operations including a discussion of the timetable for the construction of each phase of liner or final cover; waste types accepted or excluded; typical waste handling techniques and methods for handling unusual waste types; hours of operation; traffic routing; storm water management; sediment and erosion control; windy, wet and cold weather disposal operations; fire protection equipment; anticipated staffing requirements; methods for vector, dust and odor control; daily cleanup; leachate removal during hours of operation as well as nights, weekends and holidays; direction of filling; salvaging; record keeping; and parking for visitors, users and employees. The report shall describe any limitations or operational practices necessary due to the presence of other open or closed landfills, processing facilities, storage facilities, composting facilities or any other solid waste facilities located on the same property.
NR 503.10(2)(h)6. 6. A description of landfill operations and the development of subsequent phases. This discussion shall define the critical stage of waste disposal for each phase as it relates to the start of construction of subsequent phases. The scheduling of future construction shall take into account the length of the construction season, limitations imposed by weather and season, and the capacity remaining in existing phases such that an orderly transition is maintained. The report shall describe the anticipated construction in each phase for storm water management, monitoring, abandonment of fill areas, and the installation and maintenance of gas and leachate control structures.
NR 503.10(2)(h)7. 7. A description of the waste inspection and rejection procedures, including use of the inspection pad for dumping and inspecting all incoming waste, actions to be taken to reject unacceptable waste, and movement of non-salvageable material from the pad to the landfill. The report shall also describe the procedures for identifying salvageable material and moving it from the inspection pad to the adjacent salvageable material storage area, and schedules for removing salvageable material to markets.
NR 503.10(2)(h)8. 8. A description of landfill operations, actions taken when phases of the landfill reach waste final grades, and closure of phases at waste final grades. The report shall include a discussion of the anticipated sequence of the required events for closure of the landfill and a discussion of those actions necessary to prepare the landfill for long-term care and final use.
NR 503.10(2)(h)9. 9. A proposed long-term care schedule describing the procedures to be utilized for the inspection and maintenance of cover vegetation; storm water control structures; waste or ground surface settlement or siltation; erosion damage; gas and leachate control features; gas, leachate and groundwater monitoring; and other long-term care needs. The report shall include a final use plan for the landfill.
NR 503.10(2)(h)10. 10. Specifications for construction, operation and closure of the landfill. These specifications shall include detailed instructions to the operator and any contractors for all aspects of construction and operation. References to specifications on the plan sheets shall be described. This may include information such as tank manufacturer installation instructions and pump performance criteria, materials and construction methods for sideslope risers, sidewall penetrations, sump areas and all piping located outside the limits of filling.
NR 503.10(2)(h)11. 11. An explanation of all design calculations to facilitate department review and provide the necessary information on financial responsibility for closure and long-term care of the landfill. The report shall include a discussion of all calculations, such as waste to cover balance computations, base liner and final covering soils materials needs related to available borrow soil volumes, stockpile sizing estimates, shear resistance calculations for geosynthetic materials and soil layers, design of the storm water management system, infiltration and leachate collection and leakage volumes. All calculations shall be summarized with the detailed equations presented in the appendix of the report. References to the appropriate plan sheets, from which variables are obtained for these calculations shall be included in these summaries.
NR 503.10(2)(h)12. 12. A detailed analysis in accordance with ch. NR 520 shall be made of the costs associated with closure of the landfill and of performing each year of long-term care. All assumptions used in developing the cost estimates shall be listed, including sources of the cost estimates and rationale for the selected cost factors. The anticipated operating life and replacement schedule of all engineering design features shall be addressed and reflected in the cost estimates. The proposed methods of establishing proof of financial responsibility for closure and long-term care under ch. NR 520 shall also be specified.
NR 503.10(2)(h)13. 13. An appendix shall be included which lists the references used and includes any additional data not previously presented, supplemental design calculations, material specifications, operating agreements and any miscellaneous agreements such as easements, documents related to long-term care funding and other appropriate information. At a minimum, the appendix of the report shall include the following written agreements:
NR 503.10(2)(h)13.a. a. A draft leachate treatment agreement.
NR 503.10(2)(h)13.b. b. A signed clay procurement agreement or option for acquisition of the borrow source property for the volumes necessary to construct and close the first major phase of the landfill.
NR 503.10(2)(h)14. 14. Proposed environmental monitoring plan which, at a minimum, complies with the requirements of sub. (7).
NR 503.10(3) (3)DESIGN REQUIREMENTS. Intermediate size construction and demolition waste landfills shall be designed to contain and collect leachate to the maximum practical extent. This shall be accomplished by designing the landfill to meet the standards contained in the applicable portions of this subsection unless the department approves an alternate design which provides equal or greater protection.
NR 503.10(3)(a) (a) If the applicant does not complete construction of the first major phase of the landfill within 2 years from the date of the report approval, the applicant shall reapply to the department for approval to construct the landfill. The department may require additional conditions of approval and require redesign of the landfill in accordance with state-of-the-art design criteria.
NR 503.10(3)(b) (b) Except as provided in par. (c), all landfills regulated under this section shall be designed with a clay liner which meets the following requirements:
NR 503.10(3)(b)1. 1. Soil for a clay liner shall meet the following specifications:
NR 503.10(3)(b)1.a. a. A minimum of 50% by weight which passes the 200 sieve.
NR 503.10(3)(b)1.b. b. A saturated hydraulic conductivity of 1x10-7 cm/sec or less, when compacted to required moisture contents and densities based on the modified Proctor method, standard Proctor method, or a department-approved line of optimums method.
NR 503.10(3)(b)1.c. c. An average liquid limit of 25% or greater with no values less than 20%.
NR 503.10(3)(b)1.d. d. An average plasticity index of 12% or greater with no values less than 10%.
NR 503.10(3)(b)2. 2. The separation distance between the seasonal high groundwater table and the bottom of the clay liner shall be at least 10 feet except for zone-of-saturation landfills.
NR 503.10(3)(b)3. 3. The separation distance between the competent bedrock surface and the bottom of the clay liner shall be at least 10 feet.
NR 503.10(3)(b)4. 4. The slope of the clay liner surface toward the leachate collection lines shall be at least 2%.
NR 503.10(3)(b)5. 5. The minimum thickness of the clay liner at all locations shall be 3 feet.
NR 503.10(3)(b)6. 6. The clay liner shall be constructed in the following manner:
NR 503.10(3)(b)6.a. a. All clay layers in the liner shall be constructed in lift heights no greater than 6 inches after compaction using footed compaction equipment having feet at least as long as the loose lift height. As needed, clay shall be disked or otherwise mechanically processed prior to compaction to break up clods and allow for moisture content adjustment. Clod size shall be no greater than 4 inches.
NR 503.10(3)(b)6.b. b. A sufficient number of passes of the compaction equipment shall be made over each lift of clay to ensure complete remolding of the clay.
NR 503.10(3)(b)6.c. c. All clay shall be compacted to 90% modified or 95% standard Proctor density at a moisture content at least 2% wet of optimum if using the modified Proctor method and wet of optimum if using the standard Proctor method, based on the characteristics of the appropriate Proctor curve for the clay being placed. As clay placement proceeds, the minimum density and moisture content targets shall be adjusted as necessary. The department may approve alternate methods of determining the quality of clay placement.
NR 503.10(3)(b)7. 7. The slope of the interior sidewalls of a landfill may not exceed 3 horizontal to one vertical nor be less than 5 horizontal to one vertical.
NR 503.10(3)(b)8. 8. The clay liner in adjacent phases shall be keyed together to form a continuous clay seal. This shall be accomplished by excavating steps along the edge of the existing lined phase and overlapping the lifts of clay being placed for the liner of the new phase with the steps in the existing clay liner. A minimum of 4 steps shall be included, with the total width of the spliced area measuring a minimum of 15 feet.
NR 503.10(3)(c) (c) All landfills regulated under this section which are proposed with base grades beneath the groundwater table shall meet the following requirements:
NR 503.10(3)(c)1. 1. The landfill shall be located in a fine-grained soil environment.
NR 503.10 Note Note: Fine grained soil environment is defined in s. NR 500.03 (86).
NR 503.10(3)(c)2. 2. The landfill shall meet the requirements in par. (b) 1., 3., 4., 5., 6., 7. and 8.
NR 503.10(3)(c)3. 3. An analysis shall be performed of the effect which groundwater flow may have on uplift of the liner. The analysis shall evaluate the effect of an underdrain or other dewatering system.
NR 503.10(3)(d) (d) All landfills regulated under this section shall be designed with leachate collection systems which incorporate the following design features:
NR 503.10(3)(d)1. 1. A leachate collection system shall be included in each horizontal phase of the landfill. This system shall be designed to route leachate to the perimeter of the landfill in the most direct manner possible and limit the average leachate head level on the liner to one foot or less. The piping layout shall be such that leachate flows no more than 130 feet across the base of the liner before encountering a perforated leachate collection pipe.
NR 503.10(3)(d)2. 2. The minimum slope on all leachate collection pipes at the base of the landfill shall be a constant 0.5%. The department strongly recommends that greater pipe slopes be utilized whenever possible.
NR 503.10(3)(d)3. 3. The minimum diameter of all leachate collection or transfer pipes shall be 6 inches. Schedule 80 PVC pipe or an approved substitute shall be used.
NR 503.10(3)(d)4. 4. Leachate collection trenches for clay liners shall be designed as rectangular trenches. A geotextile shall be used to line the base and sidewalls of all leachate collection trenches and shall be placed directly over the clay liner. The geotextile shall have a minimum weight of 12 oz/yd2, and may not be overlapped over the top of the trench.
NR 503.10(3)(d)5. 5. The bedding material utilized in backfilling the leachate collection pipe trenches shall have a uniformity coefficient of less than 4, a maximum particle diameter of 1 1/2 inches, a maximum of 5% of the material which passes the number 4 sieve and consist of rounded to subangular gravel. A minimum depth of 4 inches of gravel shall be placed in the trenches prior to installation of the leachate pipes. The backfill shall also be placed so that a minimum of 6 inches of material exists above the top of the pipe and within the trenches. An additional 6 inches of material shall be mounded above the trench. In cases where the particle size of the drainage blanket is significantly less than the collection trench bedding, a properly designed graded soil filter or geotextile shall be utilized to minimize the migration of the drainage blanket material into the collection trenches. Limestone and dolomite may not be used in the leachate collection system unless no other suitable material is reasonably available.
NR 503.10(3)(d)6. 6. The sizing of sand, gravel, geotextiles and pipe openings shall be analyzed for control of piping of soil materials. The gradation of sand and gravel, the apparent opening size of geotextiles and the pipe opening sizes shall be selected to achieve a stable and self-filtering structure under all conditions of leachate flow.
NR 503.10(3)(d)7. 7. All leachate collection lines shall have cleanout access points installed on both ends of each line and may not exceed 1,200 feet from the end of one cleanout to the toe of the opposite slope.
NR 503.10(3)(d)8. 8. Leachate lines, manholes and other engineering structures may not penetrate the liner in the vertical direction. Leachate transfer lines may penetrate the liner in the horizontal direction only. The number of liner penetrations shall be kept to a minimum.
NR 503.10(3)(d)9. 9. Any leachate line that penetrates a clay liner shall have a 3 foot by 3 foot anti-seep collar placed around it. A minimum of 3 feet of compacted clay, as measured from the pipe, shall be placed around the collar in all directions.
NR 503.10(3)(d)10. 10. All leachate lines transporting leachate out of the landfill shall be constructed with valves so the flow of leachate can be controlled. The valves shall be compatible with the leachate and be capable of being operated from the ground surface.
NR 503.10(3)(d)11. 11. All leachate transfer lines located outside of the clay lined area shall be designed to assure groundwater protection through the use of double-cased pipe or by using another approved secondary containment method. All leachate transfer line piping shall be pressure tested prior to use. Unless otherwise approved by the department, the upslope end of the secondary pipe shall be sealed and the downslope end shall be open to allow any collected liquid to flow into the manhole.
NR 503.10(3)(d)12. 12. All leachate transfer lines, manholes, lift stations and other structures which transfer or store leachate outside the limits of waste shall be designed as shallow as practical and located far enough from the limits of filling so that excavations associated with repair of these devices would not infringe on the landfill cover system or sidewall liner. Each of these devices shall be constructed above the seasonal high groundwater table unless it is not technically feasible to do so and the design meets the requirements of subd. 11.
NR 503.10(3)(d)13. 13. Leachate collection tanks and manholes shall be designed with a secondary containment system to prevent the discharge of leachate to ground and surface waters in the event of a leak or spill. Means shall be provided to monitor the tank and manholes within the secondary containment system unless other means for leak detection are approved by the department.
NR 503.10(3)(d)14. 14. All leachate collection tanks shall be designed to contain the volume of leachate which is generated by the landfill over a 4 day period and to withstand the soil and liquid loads that will be encountered during installation and use. The installation of the tanks shall follow the recommendations of the consultant and manufacturer.
NR 503.10(3)(d)15. 15. Measures shall be proposed to prevent accidental discharges at the leachate loadout station from entering groundwater or surface water. Unless an alternate method is approved by the department, the leachate loading station shall be paved with a concrete or asphalt pad and sloped to a catch basin to direct all spills back into the leachate holding tank.
NR 503.10(3)(d)16. 16. All manholes and enclosed structures for leachate and gas control systems shall be designed to allow for proper venting and access control.
NR 503.10(3)(d)17. 17. All control systems such as pumps, valves and meters shall be designed to be operated from the ground surface.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.