This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 468.20(5)(c) (c) Each owner or operator of an area source dry cleaning facility that exceeds the solvent consumption limit reported in par. (b) shall submit to the department by registered mail, on or before the dates specified in sub. (1) (f) or (i), a notification of compliance status providing all of the following information and signed by a responsible official who shall certify its accuracy:
NR 468.20(5)(c)1. 1. The new yearly perchloroethylene solvent consumption limit based upon the yearly solvent consumption calculated according to sub. (4) (d).
NR 468.20(5)(c)2. 2. Whether or not the facility is in compliance with each applicable requirement of sub. (3).
NR 468.20(5)(c)3. 3. A statement that all information contained in the notification is accurate and true.
NR 468.20(5)(d) (d) Each owner or operator of a dry cleaning facility shall keep receipts of perchloroethylene purchases and a log of all the following information, and maintain such information on site for a period of 5 years and show it upon request to a representative of the department:
NR 468.20(5)(d)1. 1. The volume of perchloroethylene purchased each month by the dry cleaning facility as recorded from perchloroethylene purchases. If no perchloroethylene is purchased during a given month then the owner or operator would enter zero gallons into the log.
NR 468.20(5)(d)2. 2. The calculation and result of the yearly perchloroethylene consumption determined on the first day of each month as specified in sub. (4) (d).
NR 468.20(5)(d)3. 3. The dates when the dry cleaning system components are inspected for perceptible leaks, as specified in sub. (3) (k) or (L), and the name or location of dry cleaning system components where perceptible leaks are detected.
NR 468.20(5)(d)4. 4. The dates of repair and records of written or verbal orders for repair parts to demonstrate compliance with sub. (3) (m) and (n).
NR 468.20(5)(d)5. 5. The date and temperature sensor monitoring results, as specified in sub. (4), if a refrigerated condenser is used to comply with sub. (3) (a) or (b).
NR 468.20(5)(d)6. 6. The date and colorimetric detector tube monitoring results, as specified in sub. (4), if a carbon adsorber is used to comply with sub. (3) (a) 2. or (b) 3.
NR 468.20(5)(e) (e) Each owner or operator of a dry cleaning facility shall retain onsite a copy of the design specifications and the operating manuals for each dry cleaning system and each emission control device located at the dry cleaning facility.
NR 468.20 History History: Cr. Register, June, 1995, No. 474, eff. 7-1-95; am. (1) (g), (2) (mm) (intro.), 1., 2., (r) 1., 2., (3) (a) 3., (b) (intro.), 1., 2., (e) (intro.), 1., 2., (f), (g), (h), (4) (b) (intro.), 1., 2., (c) (intro.), 1., 2., (5) (b) (intro.), 1., 2., 3., 4., 5., (c) (intro.), 1. and 2., Register, November, 1999, No. 527, eff. 12-1-99.
NR 468.30 NR 468.30 Industrial process cooling towers.
NR 468.30(1)(1) Applicability. The provisions of this section apply to the owners and operators of all new and existing industrial process cooling towers that are operated with chromium-based water treatment chemicals on or after September 8, 1994, and are either major sources or are integral parts of facilities that are major sources.
NR 468.30(2) (2)Definitions. As used in this section, terms not defined in this subsection have the meanings given in ch. NR 400. In addition, the following definitions apply to the terms used in this section:
NR 468.30(2)(a) (a) “Chromium-based water treatment chemicals" means any combination of chemical substances containing chromium used to treat water.
NR 468.30(2)(b) (b) “Construction" means the onsite fabrication, erection or installation of an industrial process cooling tower.
NR 468.30(2)(c) (c) “Cooling tower" means an open water recirculating device that uses fans or natural draft to draw or force air through the device to cool warm water by direct contact.
NR 468.30(2)(d) (d) “Existing industrial process cooling tower" means any industrial process cooling tower on which construction or reconstruction commenced on or before August 12, 1993.
NR 468.30(2)(e) (e) “Industrial process cooling tower" means any cooling tower that is used to remove heat that is produced as an input or output of a chemical or industrial process, as well as any cooling tower that cools a chemical or industrial process in combination with any heating, ventilation or air conditioning system.
NR 468.30 Note Note: Cooling towers that only cool heating, ventilation and air conditioning systems and that are operated with hexavalent chromium-based water treatment chemicals are regulated by 40 CFR 749.68.
NR 468.30(2)(f) (f) “Initial startup" means the initiation of recirculation water flow within the cooling tower.
NR 468.30(2)(g) (g) “Major source" means any stationary source, or group of stationary sources, that is located on one or more contiguous or adjacent properties and is under common control of the same person or persons under common control, that emits or has the potential to emit, in the aggregate, 10 tons per year (tpy) or more of any hazardous air pollutant which has been listed pursuant to section 112 (b) of the act (42 USC 7412 (b)) or 25 tpy or more of any combination of these hazardous air pollutants.
NR 468.30(2)(h) (h) “New industrial process cooling tower" means any industrial process cooling tower on which construction or reconstruction commenced after August 12, 1993.
NR 468.30(2)(i) (i) “Reconstruction" means the replacement of components of an industrial process cooling tower to such an extent that the fixed capital cost of the new components exceeds 50% of the fixed capital cost that would be required to construct a comparable new industrial process cooling tower.
NR 468.30(2)(j) (j) “Water treatment chemicals" means any combination of chemical substances used to treat water in cooling towers, including corrosion inhibitors, antiscalants, dispersants and any other chemical substances used to treat cooling tower water.
NR 468.30(3) (3)Standards.
NR 468.30(3)(a)(a) No owner or operator of an existing industrial process cooling tower may use chromium-based water treatment chemicals in any industrial process cooling tower on or after March 8, 1996.
NR 468.30(3)(b) (b) No owner or operator of a new industrial process cooling tower may use chromium-based water treatment chemicals in any industrial process cooling tower on or after September 8, 1994, or on or after the date of the initial startup, whichever is later.
NR 468.30(4) (4) Recordkeeping and reporting requirements.
NR 468.30(4)(a)(a) Initial notification. Owners or operators of industrial process cooling towers that have an initial startup before September 8, 1994 shall submit, by registered mail, an initial notification to the department no later than October 1, 1996. Owners or operators of industrial process cooling towers that have an initial startup on or after September 8, 1994 shall submit, by registered mail, an initial notification no later than October 1, 1996, or 12 months after initial startup, whichever is later. The initial notification shall provide the following information and be signed by a responsible official who shall certify its accuracy:
NR 468.30(4)(a)1. 1. The name and address of the owner or operator.
NR 468.30(4)(a)2. 2. The address representing the physical location of the industrial process cooling tower.
NR 468.30(4)(a)3. 3. A statement that the initial notification is being submitted as required by this section.
NR 468.30(4)(a)4. 4. A description of the type of water treatment program used in the industrial process cooling tower, including the chemical name of each corrosion inhibitor ingredient used; the average concentration of those corrosion inhibitor ingredients maintained in the cooling water; and a copy of the material safety data sheet for each water treatment chemical or chemical compound used in the industrial process cooling tower.
NR 468.30(4)(b) (b) Notification of compliance status. Each owner or operator of an industrial process cooling tower shall submit to the department, by registered mail, a notification of compliance status on or before the 60th day following the date that the industrial process cooling tower is brought into compliance with sub. (3). The notification of compliance status shall:
NR 468.30(4)(b)1. 1. Be signed by a responsible official who shall also certify the accuracy of the report.
NR 468.30(4)(b)2. 2. Certify that the industrial process cooling tower or towers are in compliance with sub. (3).
NR 468.30(4)(b)3. 3. Include the information required in par. (a) 4.
NR 468.30(4)(b)4. 4. Include the following statement: “I certify that no chromium-based water treatment chemicals have been introduced since [the initial compliance date] into any industrial process cooling tower located within the facility for any purpose."
NR 468.30(4)(c) (c) Prior notification under federal regulation. If the owner or operator of an industrial process cooling tower has submitted the notification required by par. (a) or (b) to the administrator under 40 CFR 63.405 prior to October 1, 1995, that notification shall be deemed to meet the applicable requirements of par. (a) or (b).
NR 468.30(4)(d) (d) Records retained at facility. Each owner or operator of an industrial process cooling tower shall retain copies of the notifications required under pars. (a) and (b) at the facility for a minimum of 5 years. The notifications shall be made available to department staff on request during normal business hours.
NR 468.30 History History: Cr. Register, September, 1995, No. 477, eff. 10-1-95.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.