Table 5
Performance Testing Requirements
As stated in s. NR 462.05 (3), you shall comply with the following requirements for performance testing for existing, new or reconstructed affected sources: Table 5 (Continued)
a All test methods from Appendix A to 40 CFR part 60 listed in this column are incorporated by reference in s. NR 484.04(13), (15) and (20m), all ASTM standard test methods listed in this column are incorporated by reference in s. NR 484.10., and ASME PTC 19, Part 10 (1981) is incorporated by reference in s. NR 484.11 (6) (b). Table 6
Fuel Analysis Requirements
As stated in s. NR 462.05 (4), you shall comply with the following requirements for fuel analysis testing for existing, new or reconstructed affected sources: Table 6 (Continued)
a All ASTM standard test methods in this column are incorporated by reference in s. NR 484.10. All SW-846 test methods in this column are incorporated by reference in s. NR 484.06 (4) (e). Table 7
Establishing Operating Limits
As stated in s. NR 462.05 (3), you shall comply with the following requirements for establishing operating limits: Table 7 (Continued)
Table 8
Demonstrating Continuous Compliance
As stated in s. NR 462.06 (2), you shall show continuous compliance with the emission limitations for affected sources according to the following: Table 9
Reporting Requirements
As stated in s. NR 462.07 (2), you shall comply with the following requirements for reports: NR 462.07 HistoryHistory: CR 05-116: cr. Register November 2006 No. 611, eff. 12-1-06.
/code/admin_code/nr/400/462
true
administrativecode
/code/admin_code/nr/400/462/07/5/_46
Department of Natural Resources (NR)
Chs. NR 400-499; Environmental Protection – Air Pollution Control
section
true