NR 447.07(4)(a)
(a) An indication of whether the notice is the original or a revised notification.
NR 447.07(4)(b)
(b) Name, address and telephone number of both the facility owner and operator and the asbestos removal contractor owner or operator.
NR 447.07(4)(d)
(d) Description of the facility or affected part of the facility including the size (square meters [square feet] and number of floors), age and present and prior use of the facility.
NR 447.07(4)(e)
(e) Procedure, including analytical methods, employed to detect the presence of RACM and Category I and Category II nonfriable ACM.
NR 447.07(4)(f)
(f) Estimate of the approximate amount of RACM to be removed from the facility in terms of length of pipe in linear meters (linear feet), surface area in square meters (square feet) on other facility components, or volume in cubic meters (cubic feet) if off the facility components. Also, estimate the approximate amount of Category I and Category II nonfriable ACM in the affected part of the facility that will not be removed before demolition.
NR 447.07(4)(g)
(g) Location and street address, including building number or name and floor or room number, if appropriate, city, county and state of the facility being demolished or renovated.
NR 447.07(4)(h)
(h) Scheduled starting and completion dates of asbestos removal work, or any other activity, such as site preparation that would break up, dislodge or similarly disturb asbestos material, in a demolition or renovation; planned renovation operations involving individual nonscheduled operations shall only include the beginning and ending dates of the report period as described in
s. NR 447.06 (2) (d) 2.
NR 447.07(4)(i)
(i) Scheduled starting and completion dates of demolition or renovation.
NR 447.07(4)(j)
(j) Description of planned demolition or renovation work to be performed and methods to be employed, including demolition or renovation techniques to be used and description of affected facility components.
NR 447.07(4)(k)
(k) Description of work practices and engineering controls to be used to comply with the requirements of this chapter, including asbestos removal and waste-handling emission control procedures.
NR 447.07(4)(L)
(L) Name and location of the waste disposal site where the asbestos-containing waste material will be deposited.
NR 447.07(4)(m)
(m) A certification that at least one person trained as required by
s. NR 447.08 (8) will supervise the stripping and removal described by this notification. This requirement shall become effective one year after November 1, 1992.
NR 447.07(4)(n)
(n) For facilities described in
s. NR 447.06 (2) (c), the name, title and authority of the state or local government representative who has ordered the demolition, the date that the order was issued, and the date on which the demolition was ordered to begin. A copy of the order shall be attached to the notification.
NR 447.07(4)(o)
(o) For emergency renovations referred to in
s. NR 447.06 (2) (d) 3., the date and hour that the emergency occurred, a description of the sudden, unexpected event, and an explanation of how the event caused an unsafe condition, or would cause equipment damage or an unreasonable financial burden.
NR 447.07(4)(p)
(p) Description of procedures to be followed in the event that unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized or reduced to powder.
NR 447.07(4)(q)
(q) Name, address and telephone number of the waste transporter.
NR 447.07 History
History: Cr.
Register, October, 1992, No. 442, eff. 11-1-92; correction in (3) and (4) made under s. 13.93 (2m) (b) 7., Stats.,
Register, May, 1993, No. 449; am. (3) (a), (d) (intro.),
Register, December, 1995, No. 480, eff. 1-1-96.
NR 447.08
NR 447.08 Demolition and renovation; procedures for asbestos emission control. Each owner or operator of a demolition or renovation activity to whom this section applies, according to
s. NR 447.06, shall comply with the following procedures:
NR 447.08(1)
(1) Remove all RACM from a facility being demolished or renovated before any activity begins that would break up, dislodge or similarly disturb the material or preclude access to the material for subsequent removal. RACM need not be removed before demolition if any of the following apply:
NR 447.08(1)(a)
(a) It is Category I nonfriable ACM that is not in poor condition and is not friable.
NR 447.08(1)(am)
(am) Removal of category I roofing shall meet the specifications in the Interpretive Rule Governing Roof Removal Operations,
40 CFR part 61, Appendix A to Subpart M, incorporated by reference in
s. NR 484.04 (21s).
NR 447.08(1)(b)
(b) It is on a facility component that is encased in concrete or other similarly hard material and is adequately wet whenever exposed during demolition.
NR 447.08(1)(c)
(c) It was not accessible for testing and was, therefore, not discovered until after demolition began and, as a result of the demolition, the material cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris shall be treated as asbestos-containing waste material and adequately wet at all times until disposed of.
NR 447.08(1)(d)
(d) It is Category II nonfriable ACM and the probability is low that the materials will become crumbled, pulverized or reduced to powder during demolition.
NR 447.08(2)
(2) When a facility component that contains, is covered with or is coated with RACM is being taken out of the facility as a unit or in sections:
NR 447.08(2)(a)
(a) Adequately wet all RACM exposed during cutting or disjoining operations; and
NR 447.08(2)(b)
(b) Carefully lower each unit or section to the floor and to ground level, not dropping, throwing, sliding or otherwise damaging or disturbing the RACM.
NR 447.08(3)
(3) When RACM is stripped from a facility component while it remains in place in the facility, adequately wet the RACM during the stripping operation.
NR 447.08(3)(a)1.
1. The owner or operator has obtained prior written approval from the department based on a written application that wetting to comply with this subsection would unavoidably damage equipment or present a safety hazard; and
NR 447.08(3)(a)2.
2. The owner or operator uses one of the following emission control methods:
NR 447.08(3)(a)2.a.
a. A local exhaust ventilation and collection system designed and operated to capture the particulate asbestos material produced by the stripping and removal of the asbestos materials. The system shall exhibit no visible emissions to the outside air or be designed and operated in accordance with the requirements in
s. NR 447.15.
NR 447.08(3)(a)2.b.
b. A glove-bag system designed and operated to contain the particulate asbestos material produced by the stripping of the asbestos materials.
NR 447.08(3)(b)
(b) In renovation operations where wetting would result in equipment damage or a safety hazard, and the methods allowed in
par. (a) cannot be used, another method may be used after obtaining written approval from the department based upon a determination that it is equivalent to wetting in controlling emissions or to the methods allowed in
par. (a).
NR 447.08(3)(c)
(c) A copy of the department's written approval shall be kept at the work site and made available for inspection.
NR 447.08(4)
(4) After a facility component covered with, coated with or containing RACM has been taken out of the facility as a unit or in sections pursuant to
sub. (2), it shall be stripped or contained in leak-tight wrapping, except as described in
sub. (5). If stripped, either:
NR 447.08(4)(b)
(b) Use a local exhaust ventilation and collection system designed and operated to capture the particulate asbestos material produced by the stripping. The system shall exhibit no visible emissions to the outside air or be designed and operated in accordance with the requirements in
s. NR 447.15.
NR 447.08(5)
(5) For large facility components such as reactor vessels, large tanks and steam generators, but not beams, which shall be handled in accordance with
subs. (2) to
(4), the RACM is not required to be stripped if the following requirements are met:
NR 447.08(5)(a)
(a) The component is removed, transported, stored, disposed of or reused without disturbing or damaging the RACM.
NR 447.08(5)(c)
(c) The leak-tight wrapping is labeled according to
s. NR 447.12 during all loading and unloading operations and during storage.
NR 447.08(6)
(6) For all RACM, including material that has been removed or stripped:
NR 447.08(6)(a)
(a) Adequately wet the material and ensure that it remains wet until collected and contained or treated in preparation for disposal in accordance with
s. NR 447.13; and
NR 447.08(6)(b)
(b) Carefully lower the material to the ground and floor, not dropping, throwing, sliding or otherwise damaging or disturbing the material.
NR 447.08(6)(c)
(c) Transport the material to the ground via leak-tight chutes or containers if it has been removed or stripped more than 50 feet above ground level and was not removed as units or in sections.
NR 447.08(7)
(7) When the temperature at the point of wetting is below 0
°C (32
°F):
NR 447.08(7)(b)
(b) The owner or operator shall remove facility components containing, coated with, or covered with RACM as unit or in sections to the maximum extent possible.
NR 447.08(7)(c)
(c) During periods when wetting operations are suspended due to freezing temperatures, the owner or operator shall record the temperature in the area containing the facility components at the beginning, middle and end of each working day and keep daily temperature records available for inspection by the department during normal business hours at the demolition or renovation site. The owner or operator shall retain the temperature records for at least 2 years.
NR 447.08(8)
(8) No RACM may be stripped, removed or otherwise handled or disturbed at a facility regulated by this chapter unless at least one on-site representative, such as a foreman or management-level person or other authorized representative, trained in the provisions of this chapter and the means of complying with them, is present. Every 2 years, the trained on-site individual shall receive refresher training in the provisions of this chapter. The required training shall include at a minimum: applicability; notifications; material identification; control procedures for removals including, at least, wetting, local exhaust ventilation, negative pressure enclosures, glove-bag procedures, and High Efficiency Particulate Air (HEPA) filters; waste disposal work practices; reporting and recordkeeping; and asbestos hazards and worker protection. Each owner or operator shall post evidence that the required training has been completed and make such evidence available for inspection by the department at the demolition or renovation site.
NR 447.08(9)
(9) For facilities described in
s. NR 447.06 (2) (c), adequately wet the portion of the facility that contains RACM during the wrecking operation.
NR 447.08(10)
(10) If a facility is demolished by intentional burning, all RACM including Category I and Category II nonfriable ACM shall be removed in accordance with this chapter before burning.
NR 447.08 History
History: Cr.
Register, October, 1992, No. 442, eff. 11-1-92; correction in (9) made under s. 13.93 (2m) (b) 7., Stats.,
Register, May, 1993, No. 449; am. (2) (a), (3) (a) 1., (4) (intro.), (a) and (6) (a),
Register, November, 1999, No. 527, eff. 12-1-99;
CR 02-146: cr. (1) (am)
Register October 2003 No. 574, eff. 11-1-03.
NR 447.09(1)
(1) Except as provided in
sub. (2), the owner or operator of an operation in which asbestos-containing materials are spray applied shall comply with the following requirements:
NR 447.09(1)(a)
(a) For spray-on application on buildings, structures, pipes and conduits, the owner or operator may not use material containing more than 1% asbestos as determined using the method specified in Appendix E to Subpart E,
40 CFR part 763, section 1, Polarized Light Microscopy, incorporated by reference in
s. NR 484.04 (28).
NR 447.09(1)(b)
(b) For spray-on application of materials that contain more than 1% asbestos as determined using the method specified in Appendix E to Subpart E,
40 CFR part 763, section 1, Polarized Light Microscopy, on equipment and machinery, the owner or operator shall:
NR 447.09(1)(b)1.
1. Notify the department at least 20 days before beginning the spraying operation. Include the following information in the notice:
NR 447.09(1)(b)2.
2. Discharge no visible emissions to the outside air from spray-on application of the asbestos-containing material or use the methods specified by
s. NR 447.15 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air.
NR 447.09(2)
(2) The requirements of
sub. (1) do not apply to the spray-on application of materials where the asbestos fibers in the materials are encapsulated with a bituminous or resinous binder during spraying and the materials are not friable after drying.
NR 447.09 History
History: Cr.
Register, October, 1992, No. 442, eff. 11-1-92; am. (1) (a),
Register, December, 1995, No. 480, eff. 1-1-96.
NR 447.10(1)
(1)
Applicability. This section applies to the following fabricating operations using commercial asbestos:
NR 447.10(1)(b)
(b) The fabrication of friction products, except those operations that primarily install asbestos friction materials on motor vehicles.
NR 447.10(1)(c)
(c) The fabrication of cement or silicate board for ventilation hoods; ovens; electrical panels; laboratory furniture, bulkheads, partitions and ceilings for marine construction; and flow control devices for the molten metal industry.
NR 447.10(2)
(2) Standard. Each owner or operator of any of the fabricating operations to which this section applies shall:
NR 447.10(2)(a)1.
1. Discharge no visible emissions to the outside air from any of the operations or from any building or structure in which they are conducted or from any other fugitive sources; or
NR 447.10(2)(a)2.
2. Use the methods specified by
s. NR 447.15 to clean emissions containing particulate asbestos material before they escape to, or are vented to, the outside air.
NR 447.10(2)(b)
(b) Monitor each potential source of asbestos emissions from any part of the fabricating facility, including air cleaning devices, process equipment and buildings that house equipment for material processing and handling, at least once each day, during daylight hours, for visible emissions to the outside air during periods of operation. The monitoring shall be by visual observation of at least 15 seconds duration per source of emissions.
NR 447.10(2)(c)
(c) Inspect each air cleaning device at least once each week for proper operation and for changes that signal the potential for malfunctions, including, to the maximum extent possible without dismantling other than opening the device, the presence of tears, holes and abrasions in filter bags and for dust deposits on the clean side of bags. For air cleaning devices that cannot be inspected on a weekly basis according to this section, submit to the department, and revise as necessary, a written maintenance plan to include, at a minimum, the following:
NR 447.10(2)(d)
(d) Maintain records of the results of visible emission monitoring and air cleaning device inspections using a format acceptable to the department and include the following:
NR 447.10(2)(d)3.
3. Condition of fabric filters, including presence of any tears, holes and abrasions.
NR 447.10(2)(d)5.
5. Brief description of corrective actions taken, including date and time.