This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 440.20(7)(j) (j) The owner or operator may use the following as alternatives to the reference methods and procedures specified in this subsection. All test methods are in Appendix A of 40 CFR part 60, incorporated by reference in s. NR 440.17.
NR 440.20(7)(j)1. 1. For Method 6, Method 6A or 6B (whenever Methods 6 and 3 or 3B data are used) or 6C may be used. Each Method 6B sample obtained over 24 hours represents 24 1-hour averages. If Method 6A or 6B is used under par. (i), the conditions under s. NR 440.19 (7) (d) 1. apply; these conditions do not apply under par. (h).
NR 440.20(7)(j)2. 2. For Method 7, Method 7A, 7C, 7D or 7E may be used. If Method 7C, 7D or 7E is used, the sampling time for each run shall be 1 hour.
NR 440.20(7)(j)3. 3. For Method 3, Method 3A may be used if the sampling time is 1 hour.
NR 440.20(7)(j)4. 4. For Method 3B, Method 3A may be used.
NR 440.20(7)(k) (k) The procedures specified in subds. 1. to 3. shall be used to determine gross output for sources demonstrating compliance with the output-based standard under sub. (5) (d) 1.
NR 440.20(7)(k)1. 1. The owner or operator of an affected facility with electricity generation shall install, calibrate, maintain and operate a wattmeter; measure gross electrical output in megawatt-hours on a continuous basis and record the output of the monitor.
NR 440.20(7)(k)2. 2. The owner or operator of an affected facility with process steam generation shall install, calibrate, maintain and operate meters for steam flow, temperature and pressure; measure gross process steam output in joules per hour (Btu per hour) on a continuous basis and record the output of the monitor.
NR 440.20(7)(k)3. 3. For affected facilities generating process steam in combination with electrical generation, the gross energy output is determined from the gross electrical output measured in accordance with subd. 1. plus 50% of the gross thermal output of the process steam measured in accordance with subd. 2.
NR 440.20(7)(L) (L) The owner or operator of an affected facility demonstrating compliance with the output-based standard under sub. (5) (d) 1. shall do one of the following:
NR 440.20(7)(L)1. 1. Install, certify, operate and maintain a continuous flow monitoring system meeting the requirements of Performance Specification 6 in 40 CFR part 60, Appendix B, and Procedure 1 in 40 CFR part 60, Appendix F, both incorporated by reference in s. NR 440.17 (1), and record the output of the system for measuring the flow of exhaust gases discharged to the atmosphere.
NR 440.20(7)(L)2. 2. Use data from a continuous flow monitoring system certified according to the requirements of 40 CFR 75.20, meeting the applicable quality control and quality assurance requirement of 40 CFR 75.21 and validated according to 40 CFR 75.23.
NR 440.20(7)(m) (m) The owner or operator of an affected unit that qualifies as a gas-fired or oil-fired unit, as defined in 40 CFR 72.2, may use, as an alternative to the requirements specified in either par. (L) 1. or 2., a fuel flow monitoring system certified and operated according to the requirements of 40 CFR part 75, Appendix D, incorporated by reference in s. NR 440.17 (1).
NR 440.20(7)(n) (n) The owner or operator of a duct burner which is subject to the NOx standards of sub. (5) (a) 1. or (d) 1. is not required to install or operate a continuous emissions monitoring system to measure NOx emissions; a wattmeter to measure gross electrical output; meters to measure steam flow, temperature and pressure; and a continuous flow monitoring system to measure the flow of exhaust gases discharged to the atmosphere.
NR 440.20(8) (8)Compliance determination procedures and methods.
NR 440.20(8)(a)(a) In conducting the performance tests required in s. NR 440.08, the owner or operator shall use as reference methods and procedures the methods in Appendix A of 40 CFR part 60, incorporated by reference in s. NR 440.17, or the methods and procedures as specified in this subsection, except as provided in s. NR 440.08 (2). Section NR 440.08 (6) does not apply to this subsection for SO2 and NOx. Acceptable alternative methods are given in par. (e).
NR 440.20(8)(b) (b) The owner or operator shall determine compliance with the particulate matter standards in sub. (3) as follows:
NR 440.20(8)(b)1. 1. The dry basis F factor (O2) procedures in Method 19 shall be used to compute the emission rate of particulate matter.
NR 440.20(8)(b)2. 2. For the particulate matter concentration, Method 5 shall be used at affected facilities without wet FGD systems and Method 5B shall be used after wet FGD systems.
NR 440.20(8)(b)2.a. a. The sampling time and sample volume for each run shall be at least 120 minutes and 1.70 dscm (60 dscf). The probe and filter holder heating system in the sampling train may be set to provide an average gas temperature of no greater than 160"14°C (320"25°F).
NR 440.20(8)(b)2.b. b. For each particulate run, the emission rate correction factor, integrated or grab sampling and analysis procedures of Method 3B shall be used to determine the O2 concentration. The O2 sample shall be obtained simultaneously with, and at the same traverse points as, the particulate run. If the particulate run has more than 12 traverse points, the O2 simultaneous traverse points may be reduced to 12 provided that Method 1 is used to locate the 12 O2 traverse points. If the grab sampling procedure is used, the O2 concentration for the run shall be the arithmetic mean of the sample O2 concentrations at all traverse points.
NR 440.20(8)(b)3. 3. Method 9 and the procedures in s. NR 440.11 shall be used to determine opacity.
NR 440.20(8)(c) (c) The owner or operator shall determine compliance with the SO2 standards in sub. (4) as follows:
NR 440.20(8)(c)1. 1. The percent of potential SO2 emissions (% Ps) to the atmosphere shall be computed using the following equation:
% Ps = [(100 - %Rf) (100 - %Rg)]/100
where:
%Ps is the percent of potential SO2 emissions, percent
%Rf is the percent reduction from fuel pretreatment, percent
%Rg is the percent reduction by SO2 control system, percent
NR 440.20(8)(c)2. 2. The procedures in Method 19 may be used to determine percent reduction (%Rf) of sulfur by such processes as fuel pretreatment (physical coal cleaning, hydrodesulfurization of fuel oil, etc.), coal pulverizers, and bottom and flyash interactions. This determination is optional.
NR 440.20(8)(c)3. 3. The procedures in Method 19 shall be used to determine the percent SO2 reduction (%Rg) of any SO2 control system. Alternatively, a combination of an`as fired' fuel monitor and emission rates measured after the control system, following the procedures in Method 19, may be used if the percent reduction is calculated using the average emission rate from the SO2 control device and the average SO2 input rate from the `as fired' fuel analysis for 30 successive boiler operating days.
NR 440.20(8)(c)4. 4. The appropriate procedures in Method 19 shall be used to determine the emission rate.
NR 440.20(8)(c)5. 5. The continuous monitoring system in sub. (7) (b) and (d) shall be used to determine the concentrations of SO2 and CO2 or O2.
NR 440.20(8)(d) (d) The owner or operator shall determine compliance with the NOx standard in sub. (5) as follows:
NR 440.20(8)(d)1. 1. The appropriate procedures in Method 19 shall be used to determine the emission rate of NOx.
NR 440.20(8)(d)2. 2. The continuous monitoring system in sub. (7) (c) and (d) shall be used to determine the concentrations of NOx and CO2 or O2.
NR 440.20(8)(e) (e) The owner or operator may use the following as alternatives to the reference methods and procedures specified in this subsection:
NR 440.20(8)(e)1. 1. For Method 5 or 5B, Method 17 may be used at facilities with or without wet FGD systems if the stack temperature at the sampling location does not exceed an average temperature of 160°C (320 °F). The procedures of sections 2.1 and 2.3 of Method 5B may be used in Method 17 only if it is used after wet FGD systems. Method 17 may not be used after wet FGD systems if the effluent is saturated or laden with water droplets.
NR 440.20(8)(e)2. 2. The Fc factor (CO2 ) procedures in Method 19 may be used to compute the emission rate of particulate matter under the stipulations of s. NR 440.19 (7) (d) 1. The CO2 shall be determined in the same manner as the O2 concentration.
NR 440.20(8)(f) (f) Electric utility combined cycle gas turbines are performance tested for particulate matter, sulfur dioxide and nitrogen oxides using the procedures of Method 19 of 40 CFR part 60, Appendix A, incorporated by reference in s. NR 440.17 (1). The sulfur dioxide and nitrogen oxides emission rates from the gas turbine used in Method 19 calculations are determined when the gas turbine is performance tested under s. NR 440.50. The potential uncontrolled particulate matter emission rate from a gas turbine is defined as 17 ng/J (0.04 lb/million Btu) heat input.
NR 440.20(9) (9)Reporting requirements.
NR 440.20(9)(a)(a) For sulfur dioxide, nitrogen oxides and particulate matter emissions, the performance test data from the initial performance test and from the performance evaluation of the continuous monitors (including the transmissometer) shall be submitted to the department.
NR 440.20(9)(b) (b) For sulfur dioxide and nitrogen oxides the following information shall be reported to the department for each 24-hour period.
NR 440.20(9)(b)1. 1. Calendar date.
NR 440.20(9)(b)2. 2. The average sulfur dioxide and nitrogen oxide emission rates (ng/J or lb/million Btu) for each 30 successive boiler operating days, ending with the last 30-day period in the quarter; reasons for noncompliance with the emission standards; and description of corrective actions taken.
NR 440.20(9)(b)3. 3. Percent reduction of the potential combustion concentration of sulfur dioxide for each 30 successive boiler operating days, ending with the last 30-day period in the quarter; reasons for noncompliance with the standard; and description of corrective actions taken.
NR 440.20(9)(b)4. 4. Identification of the boiler operating days for which pollutant or diluent data have not been obtained by an approved method for at least 18 hours of operation of the facility; justification for not obtaining sufficient data; and description of corrective actions taken.
NR 440.20(9)(b)5. 5. Identification of the times when emissions data have been excluded from the calculation of average emission rates because of startup, shutdown, malfunction (NOx only), emergency conditions (SO2 only) or other reasons, and justification for excluding data for reasons other than startup, shutdown, malfunction or emergency conditions.
NR 440.20(9)(b)6. 6. Identification of “F" factor used for calculations, method of determination and type of fuel combusted.
NR 440.20(9)(b)7. 7. Identification of times when hourly averages have been obtained based on manual sampling methods.
NR 440.20(9)(b)8. 8. Identification of the times when the pollutant concentration exceeded full span of the continuous monitoring system.
NR 440.20(9)(b)9. 9. Description of any modifications to the continuous monitoring system which could affect the ability of the continuous monitoring system to comply with Performance Specification 2 or 3 of 40 CFR part 60, Appendix B, incorporated by reference in s. NR 440.17.
NR 440.20(9)(c) (c) If the minimum quantity of emission data as required by sub. (7) is not obtained for any 30 successive boiler operating days, the following information obtained under the requirements of sub. (6) (h) shall be reported to the department for that 30-day period:
NR 440.20(9)(c)1. 1. The number of hourly averages available for outlet emissions rates (no) and inlet emission rates (n i), as applicable.
NR 440.20(9)(c)2. 2. The standard deviation of hourly averages for outlet emission rates (So) and inlet emission rates (S i), as applicable.
NR 440.20(9)(c)3. 3. The lower confidence limit for the mean outlet emission rate (Eo*) and the upper confidence limit for the mean inlet emission rate (Ei*), as applicable.
NR 440.20(9)(c)4. 4. The applicable potential combustion concentration.
NR 440.20(9)(c)5. 5. The ratio of the upper confidence limit for the mean outlet emission rate (Eo*) and the allowable emission rate (Estd), as applicable.
NR 440.20(9)(d) (d) If any standards under sub. (4) are exceeded during emergency conditions because of control system malfunction, the owner or operator of the affected facility shall submit a signed statement:
NR 440.20(9)(d)1. 1. Indicating if emergency conditions existed and requirements under sub. (6) (d) were met during each period, and
NR 440.20(9)(d)2. 2. Listing the following information:
NR 440.20(9)(d)2.a. a. Time periods the emergency condition existed;
NR 440.20(9)(d)2.b. b. Electrical output and demand on the owner or operator's electric utility system and the affected facility;
NR 440.20(9)(d)2.c. c. Amount of power purchased from interconnected neighboring utility companies during the emergency period;
NR 440.20(9)(d)2.d. d. Percent reduction in emissions achieved;
NR 440.20(9)(d)2.e. e. Atmospheric emission rate (ng/J) of the pollutant discharged; and
NR 440.20(9)(d)2.f. f. Actions taken to correct control system malfunction.
NR 440.20(9)(e) (e) If fuel pretreatment credit toward the sulfur dioxide emission standard under sub. (4) is claimed, the owner or operator of the affected facility shall submit a signed statement:
NR 440.20(9)(e)1. 1. Indicating what percentage cleaning credit was taken for the calendar quarter, and whether the credit was determined in accordance with the provisions of sub. (8) and Method 19 of 40 CFR part 60, Appendix A, incorporated by reference in s. NR 440.17; and
NR 440.20(9)(e)2. 2. Listing the quantity, heat content, and date each pretreated fuel shipment was received during the previous quarter; the name and location of the fuel pretreatment facility; and the total quantity and total heat content of all fuels received at the affected facility during the previous quarter.
NR 440.20(9)(f) (f) For any periods for which opacity, sulfur dioxide or nitrogen oxides emissions data are not available, the owner or operator of the affected facility shall submit a signed statement indicating if any changes were made in operation of the emission control system during the period of data unavailability. Operations of the control system and affected facility during periods of data unavailability are to be compared with operation of the control system and affected facility before and following the period of data unavailability.
NR 440.20(9)(g) (g) The owner or operator of the affected facility shall submit a signed statement indicating whether:
NR 440.20(9)(g)1. 1. The required continuous monitoring system calibration, span, and drift checks or other periodic audits have or have not been performed as specified.
NR 440.20(9)(g)2. 2. The data used to show compliance was or was not obtained in accordance with approved methods and procedures of this chapter and is representative of plant performance.
NR 440.20(9)(g)3. 3. The minimum data requirements have or have not been met; or, the minimum data requirements have not been met for errors that were unavoidable.
NR 440.20(9)(g)4. 4. Compliance with the standards has or has not been achieved during the reporting period.
NR 440.20(9)(h) (h) For the purposes of the reports required under s. NR 440.07, periods of excess emissions are defined as all 6-minute periods during which the average opacity exceeds the applicable opacity standards under sub. (3) (b). Opacity levels in excess of the applicable opacity standard and the date of such excesses shall be submitted to the department each calendar quarter.
NR 440.20(9)(i) (i) The owner or operator of an affected facility shall submit the written reports required under this subsection and ss. NR 440.01 to 440.15 to the department semiannually for each 6-month period. All semiannual reports shall be postmarked by the 30th day following the end of each 6-month period.
NR 440.20(9)(j) (j) The owner or operator of an affected facility may submit electronic quarterly reports for SO2, NOx and opacity in lieu of submitting the written reports required under pars. (b) and (h). The format of each quarterly electronic report shall be coordinated with the department. The electronic report shall be submitted no later than 30 days after the end of the calendar quarter and shall be accompanied by a certification statement from the owner or operator, indicating whether compliance with the applicable emission standards and minimum data requirements of this section was achieved during the reporting period. Before submitting reports in the electronic format, the owner or operator shall coordinate with the department to obtain agreement to submit reports in this alternative format.
NR 440.20 History History: Cr. Register, January, 1984, No. 337, eff. 2-1-84; am. (7) (h) 1., 3., 4., (L) 1. and (8) (a) 1., Register, September, 1986, No. 369, eff. 10-1-86; am. (2) (intro.), (7) (h) 1. to 3., (i) 1., (8) (a) 1. to 6., r. (8) (a) 7., Register, September, 1990, No. 417, eff. 10-1-90; am. (4) (h) 1. and 2., (5) (a) 1., (c), (6) (d) 3. (intro.) and (h), r. and recr. (7) (f), (h), (i) (intro.) to 2. and (8), cr. (7) (j), Register, July, 1993, No. 451, eff. 8-1-93; am. (2) (n), (y), (5) (a) 1., (7) (h) 2., (8) (b) 2., Register, December, 1995, No. 480, eff. 1-1-96; correction in (4) (b) (intro.) made under s. 13.93 (2m) (b) 7., Stats., Register, November, 1999, No. 527; CR 06-109: am. (1) (b), (2) (b), (n), (q) 1. b. and (y), (4) (d) 2., (f), (5) (a) (intro.), 1. and 2., (b) and (c), (7) (e) and (i) 1. and 3., (8) (title) and (b) 2. b. and (9) (i), cr. (2) (gr) and (Lm), (5) (d), (6) (a) (title), (b) (title), (c) (title), (d) (title), (e) (title), (f) (title), (g) (title) and (h) (title), (i) to (k), (7) (c) 2. and (k) to (n), (8) (f) and (9) (j), renum. (7) (c) to be (7) (c) 1. Register May 2008 No. 629, eff. 6-1-08.
NR 440.205 NR 440.205Industrial - commercial - institutional steam generating units.
NR 440.205(1) (1)Applicability.
NR 440.205(1)(a)(a) The affected facility to which this section applies is each steam generating unit that commences construction, modification, or reconstruction after June 19, 1984, and that has a heat input capacity from fuels combusted in the steam generating unit of more than 29 MW (100 million Btu/hour).
NR 440.205(1)(b) (b) Any affected facility meeting the applicability requirements under par. (a) and commencing construction, modification, or reconstruction after June 19, 1984, but on or before June 19, 1986, is subject to the following standards:
NR 440.205(1)(b)1. 1. Coal-fired affected facilities having a heat input capacity between 29 and 73 MW (100 and 250 million Btu/hour), inclusive, are subject to the particulate matter and nitrogen oxides standards under this section.
NR 440.205(1)(b)2. 2. Coal-fired affected facilities having a heat input capacity greater than 73 MW (250 million Btu/hour) and meeting the applicability requirements under s. NR 440.19 (standards of performance for fossil fuel-fired steam generators) are subject to the particulate matter and nitrogen oxides standards under this section and to the sulfur dioxide standards in s. NR 440.19 (4).
NR 440.205(1)(b)3. 3. Oil-fired affected facilities having a heat input capacity between 29 and 73 MW (100 and 250 million Btu/hour), inclusive, are subject to the nitrogen oxides standards in this section.
NR 440.205(1)(b)4. 4. Oil-fired affected facilities having a heat input capacity greater than 73 MW (250 million Btu/hour) and meeting the applicability requirements in s. NR 440.19 (standards of performance for fossil fuel-fired steam generators) are also subject to the nitrogen oxides standards in this section and the particulate matter and sulfur dioxide standards in s. NR 440.19 (3) and (4).
NR 440.205(1)(c) (c) Affected facilities which also meet the applicability requirements under s. NR 440.26 (standards of performance for petroleum refineries) are subject to the particulate matter and nitrogen oxides standards under this section and the sulfur dioxide standards under s. NR 440.26 (5).
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.