where:
N
i is the annual allocation of CAIR NO
x set-aside allowances for new unit i for the calendar year rounded to the nearest whole ton, adjusted by the department as needed to ensure that the sum of the allowances to all units does not exceed 7% of the trading budget in
40 CFR 97.140
Ri is the amount of CAIR NOx allowances the department determined unit i is eligible for under subd. 1.
NUSA is the new unit set-aside established under par. (a)
k is the number of units for which the department established an amount greater than 0 under subd. 1.
NR 432.03(3)(e)
(e) The department shall notify each CAIR designated representative that submitted an allocation request under
par. (b) of the amount of CAIR NO
x allowances allocated for the calendar year to the CAIR NO
x unit covered by the request.
NR 432.03(4)
(4) Allocation of remaining new unit set-aside allowances. After completion of the procedures under
sub. (3), any CAIR NO
x allowances remaining in the new unit set-aside for the calendar year shall be allocated to the CAIR NO
x units and CAIR renewable units that were allocated CAIR NO
x allowances under
sub. (2) for the calendar year in an amount determined using equation 5:
where:
Xi is the allocation of remaining CAIR NOx new unit set-aside annual allowances for unit i rounded to the nearest whole ton, adjusted by the department as needed to ensure that the sum of the allowances to all units does not exceed the amount of U
U is the amount of unallocated CAIR NOx new unit set-aside allowances in tons
Ai is the annual allocation of CAIR NOx allowances for unit i calculated using equation 3
MAP is the main allocation pool of CAIR NO
x allowances in tons which is the trading budget for Wisconsin in
40 CFR 97.140 minus the new unit set-aside established in
sub. (3)
NR 432.03(5)
(5) CAIR NOx allocations for 2009 to 2014.
The CAIR NO
x allocations for 2009 to 2014 for individual CAIR NO
x units are listed in Table 1.
-
See PDF for table NR 432.03 History
History: CR 06-104: cr. Register July 2007 No. 619, eff. 8-1-07. NR 432.04
NR 432.04
Compliance supplement pool. In addition to the CAIR NO
x allowances allocated under
s. NR 432.03, the department may allocate for calendar year 2009 only, additional allowances from the compliance supplement pool up to the amount designated by the EPA in
40 CFR 97.143 for Wisconsin for the purposes identified in this section.
NR 432.04(1)(a)(a) The department may allocate CAIR NO
x allowances from the compliance supplement pool to a CAIR NO
x unit if the unit's CAIR designated representative demonstrates that it achieved early reductions of NO
x emissions. To be eligible for early reduction credits, the unit's CAIR designated representative shall demonstrate all of the following:
NR 432.04(1)(a)1.
1. The CAIR NO
x unit's average annual NO
x emission rate for 2007 or 2008 is less than 0.25 lb/mmBtu based on heat input.
NR 432.04(1)(a)2.
2. If the unit is included in a NO
x averaging plan under
s. NR 409.065 (7) for 2007 or 2008, the NO
x averaging plan has an actual weighted average NO
x emission rate for 2007 or 2008 equal to or less than the actual weighted average NO
x emission rate for preceding year.
NR 432.04(1)(a)3.
3. Compared to the preceding year, the CAIR NO
x unit achieves NO
x emission reductions in both 2007 and 2008.
NR 432.04(1)(b)
(b) The CAIR designated representative of the unit may request early reduction credits, and allocation of CAIR NO
x allowances from the compliance supplement pool for early reduction credits, in accordance with the following:
NR 432.04(1)(b)1.
1. The CAIR designated representative shall monitor and report the NO
x emissions rate and the heat input of the unit based on monitoring data required in accordance with
40 CFR part 97, Subpart HH in each calendar year for which early reduction credits are requested.
NR 432.04(1)(b)2.
2. The CAIR designated representative of a CAIR NO
x unit shall submit to the department by July 31, 2009 a request for allocation of an amount of CAIR NO
x allowances from the compliance supplement pool. The request may not exceed the value determined using equation 6:
Equation 6
where:
ER is the amount of CAIR NOx allowances a CAIR designated representative may request based on early emission reductions in 2007 and 2008 rounded to the nearest ton
HI2007 is the total heat input to the unit for the calendar year 2007 in mmBtu
HI2008 is the total heat input to the unit for the calendar year 2008 in mmBtu
2000 is a conversion factor in lb/ton
DEM2007 and DEM
2008 are the differences between the actual emission rates for 2007 and 2008 respectively and the target emission rate for early reductions in lbs NOx/mmBtu. If the unit's actual average emission rate for the calendar year is greater than 0.25, DEMyear is equal to 0. If the unit's actual average emission rate for the calendar year is equal to or less than 0.25, then DEMyear is calculated using equation 7
where:
Actual
year is the unit's actual average emission rate for calendar year for 2007 or 2008 in lbs NO
x/mmBtu determined in accordance with
40 CFR part 97, Subpart HH
0.25 is the target emission rate for early reductions in lbs NOx/mmBtu
NR 432.04(2)
(2) Electric reliability. The department may allocate CAIR NO
x allowances from the compliance supplement pool to any CAIR NO
x unit for which the unit's CAIR designated representative demonstrates that compliance with the CAIR NO
x allocation under
s. NR 432.03, Table 1 for calendar year 2009 would create an undue risk to the reliability of electricity supply during 2009. The CAIR designated representative of the unit may request the allocation of CAIR NO
x allowances from the compliance supplement pool in order to avoid an undue risk to the reliability of electricity supply during 2009 in accordance with the following requirements:
NR 432.04(2)(a)
(a) The CAIR designated representative of the CAIR NO
x unit shall submit to the department by July 31, 2009 a request for allocation of an amount of CAIR NO
x allowances from the compliance supplement pool not exceeding the minimum amount of CAIR NO
x allowances necessary to remove the undue risk to the reliability of electricity supply.
NR 432.04(2)(b)
(b) In the request under
par. (a), the CAIR designated representative of the CAIR NO
x unit shall demonstrate that, in the absence of an allocation to the unit in the amount of CAIR NO
x allowances requested, the unit's compliance with CAIR NO
x allocation under
s. NR 432.03, Table 1 for calendar year 2009 would create an undue risk to the reliability of electricity supply during that year. This demonstration shall include a showing by the unit's CAIR designated representative that it would not be feasible to do both of the following:
NR 432.04(2)(b)1.
1. Obtain a sufficient amount of electricity from other electricity generation facilities for compliance with the CAIR NO
x allocations under
s. NR 432.03, Table 1 to prevent the undue risk.
NR 432.04(2)(b)2.
2. Obtain under
subs. (1) and
(3), or otherwise obtain, a sufficient amount of CAIR NO
x allowances to prevent the undue risk.
NR 432.04(3)
(3) Allocation procedure. The department shall review each request submitted under
subs. (1) and
(2) and shall allocate CAIR NO
x allowances for calendar year 2009 to CAIR NO
x units covered by the requests as follows:
NR 432.04(3)(a)
(a) Upon receipt of each request, the department shall determine whether the amount of the CAIR NO
x allowances requested from the compliance supplement pool meets the requirements of
sub. (1) or
(2).
NR 432.04(3)(b)
(b) If the amount of CAIR NO
x allowances in the compliance supplement pool is greater than or equal to the total amount of CAIR NO
x allowances in all requests submitted under
subs. (1) and
(2), the department shall allocate to each CAIR NO
x unit covered by the requests the amount of CAIR NO
x allowances requested, and determined eligible for under
par. (a).
NR 432.04(3)(c)
(c) If the state's compliance supplement pool has a smaller amount of CAIR NO
x allowances than the total amount of CAIR NO
x allowances in all requests submitted under
subs. (1) and
(2), as adjusted under
par. (a), the department shall allocate CAIR NO
x allowances to each CAIR NO
x unit covered by the requests according to equation 8:
where:
Zi is the amount of CAIR NOx allowances allocated to unit i from the state's compliance supplement pool rounded to the nearest whole ton, adjusted by the department as needed to ensure that the sum of the allowances to all units does not exceed the CSP
Yi is the amount of CAIR NOx allowances requested for unit i under subs. (1) and (2), as determined eligible under par. (a)
CSP is the amount of CAIR NO
x allowances in the state's compliance supplement pool as provided in
40 CFR 97.143
k is the number of units which the department deemed eligible for requests made under subs. (1) and (2)
NR 432.04(3)(d)
(d) By November 15, 2009, the department shall determine the allocations under
par. (b) or
(c), as applicable. The department shall make available to the public each determination of CAIR NO
x allowances under
par. (c) and shall provide an opportunity for submission of objections to the determination. Objections shall be limited to addressing whether the determination is in accordance with
sub. (1) or
(2) and
par. (b) or
(c) and data correction. Based on any objections, the department may adjust each determination to the extent necessary to ensure that it is in accordance with
sub. (1) or
(2) and
par. (b) or
(c) and the data is correct.
NR 432.04(3)(e)
(e) By December 15, 2009, the department shall notify the administrator of the allocations made under
par. (d).
NR 432.04 History
History: CR 06-104: cr. Register July 2007 No. 619, eff. 8-1-07. NR 432.05
NR 432.05
CAIR NOx ozone season allowance allocation. The department shall use the procedures in this section for calculating and allocating CAIR NO
x ozone season allowances for CAIR NO
x units and CAIR renewable units.
NR 432.05(1)(a)(a)
Calculating baseline energy output. The department shall calculate the baseline energy output of each CAIR NO
x unit and each CAIR renewable unit, in MWh according to the following equations as appropriate:
NR 432.05(1)(a)1.
1. For a CAIR NO
x unit that is a cogeneration unit and that has operated for 5 or more consecutive calendar years, by using one of the following equations:
NR 432.05(1)(a)1.a.
a. Use equation 1a if the unit is the only unit serving a generator or, if more than one unit serves the same generator and unit-level data for equation 9a is available for all units:
where:
B is the unit baseline energy output made available by the cogeneration unit in MWh
GEavg is the average of the 3 highest annual amounts of the unit's ozone season gross electric output in MWh over the 5-year period identified in par. (b)
TEavg is the average of the 3 highest annual amounts of the unit's ozone season useful thermal energy in mmBtu over the 5-year period identified in par. (b)
3.4 is a conversion factor in mmBtu/MWh
NR 432.05(1)(a)1.b.
b. Use equation 9b if more than one unit serves the same generator and unit-level data for equation 9a is not available for all units:
where:
Bi is the baseline energy output made available by cogeneration unit i in MWh
GEGen is the average of the 3 highest annual amounts of the ozone season gross electric output in MWh for the generator served over the 5-year period identified in par. (b)
TET is the average of the 3 highest annual amounts of ozone season useful thermal energy in mmBtu for the generator served over the 5-year period defined in par. (b)
3.4 is a conversion factor in mmBtu/MWh
NCi is the nameplate capacity of unit i
n is the number of units serving the same generator
NR 432.05(1)(a)2.
2. For a CAIR NO
x unit that is not a cogeneration unit and that has operated for 5 or more consecutive calendar years and for a CAIR renewable unit that has operated for 5 or more consecutive calendar years, by using one of the following equations as appropriate:
NR 432.05(1)(a)2.a.
a. Use equation 10a if the unit is the only unit serving a generator or, if more than one unit serves the same generator and unit-level data for equation 10a is available for all units:
where:
B is the unit baseline energy output made available by the CAIR NOx unit or the CAIR renewable unit in MWh
GEavg is the average of the 3 highest annual amounts of the unit's ozone season gross electric output in MWh over the 5-year period identified in par. (b)
NR 432.05(1)(a)2.b.
b. Use equation 10b if more than one unit serves the same generator and unit-level data for equation 10a is not available for all units:
where:
Bi is the baseline energy output made available by CAIR NOx unit i or CAIR renewable unit i in MWh
GEGen is the average of the 3 highest annual amounts of the ozone season gross electric output in MWh for the generator served over the 5-year period identified in par. (b)
NCi is the nameplate capacity of unit i
n is the number of units serving the same generator
NR 432.05(1)(b)
(b)
Periodic updates of baseline energy output for units with more than 5 years operating data. The department shall use the procedures in this paragraph for calculating the unit baseline energy output for each CAIR NO