NR 162.04(2)(om) (om) No construction. All costs of a project if the municipality does not finance some construction costs through the CWFP, unless the department is cooperating with another governmental funding agency to provide an affordable financing package for the project, the other funding agency is financing the construction costs, and the department receives acceptable documentation of the other agency's commitment.
NR 162.04(2)(p) (p) O&M. Operations and maintenance expenses as defined in s. NR 162.003 (50) and (40), respectively.
NR 162.04(2)(pm) (pm) Ordinary municipal operating expenses. Ordinary operating expenses of a municipality, such as salaries and expenses of elected officials and on-staff attorneys, postage, utility bills, and annual financial audits.
NR 162.04(2)(q) (q) Other funding. Costs for which payment has been or will be received from another funding source, including costs for which funds from the U.S. department of agriculture's rural development program or a community development block grant program are committed or costs covered by a focus on energy grant. If the municipality does not receive the funds expected from the other source, the department may consider the costs of the work that was to be funded through the other source to be eligible for CWFP financial assistance unless the costs are considered ineligible under another paragraph in this subsection. This paragraph does not apply to a municipality receiving a loan from the BCPL for a scored project receiving interest subsidy under subch. IV.
NR 162.04(2)(qm) (qm) Outside of scope. Costs outside the scope of the scored project unless the department approves the costs as necessary and reasonable to improve the overall integrity, operation, or functionality of the treatment works or BMP.
NR 162.04(2)(r) (r) Personal injury. Personal injury compensation or damages arising out of the project, whether determined by adjudication, arbitration, negotiation, or otherwise.
NR 162.04(2)(rm) (rm) Post-closeout. Expenses incurred after the project completion date of the scored project.
NR 162.04(2)(s) (s) Private septic payments. Credits or payments to private septic owners made as a result of complying with s. 60.726, Stats.
NR 162.04(2)(sm) (sm) Sludge removal. Removing sludge from a wastewater facility unless it is part of the activities necessary for a scored project.
NR 162.04(2)(t) (t) Special devices. Waste-generating fixtures and associated plumbing from a residence or commercial establishment to a treatment unit, and modifications to homes or other buildings for installation of special devices.
NR 162.04(2)(tm) (tm) Special districts. Costs of establishing special purpose districts or commissions, such as sanitary districts, utility districts, and joint commissions.
NR 162.04(2)(u) (u) Storm water pipes. Storm sewer pipes unless the pipes are carrying water to treatment. Portions of storm sewer pipe construction may be eligible in a scored project if the pipes need repair or replacement due to breakage during construction of the scored project, as determined by the department.
NR 162.04(2)(um) (um) Violation penalties. Fines and penalties due to violations of, or failure to comply with, federal, state, or local laws.
NR 162.04(2)(v) (v) Warranty inspections after construction completion. Costs related to post-construction warranty inspections, including costs of a consulting engineer or a third-party inspector, and costs of extended warranties or service contracts that go beyond construction completion.
NR 162.04(2)(vm) (vm) Watermains. Watermain construction, replacement, or repair unless the watermain is needed to carry water to a part of the treatment works, or the watermain work is necessary as a direct result of work performed for a scored project, such as moving a watermain to allow appropriate distance between it and a sanitary sewer pipe being constructed in the scored project or repairing or replacing a watermain damaged during construction of the scored project.
NR 162.04(2)(w) (w) Wisconsin fund facilities. The acquisition of a treatment works built with Wisconsin fund grant program monies.
NR 162.04 Note Note: The Wisconsin fund grant program was created to fund municipal wastewater treatment facility projects required to achieve the federal goal of “fishable and swimmable” for the state's waters. The grant program was administered under ch. NR 128, which was created in 1978. Final grant closeouts of Wisconsin fund projects occurred during the 1990s. This grant program preceded the CWFP which was created in 1987 Wisconsin Act 399.
NR 162.04(2)(x) (x) WPDES permit fees. The cost of a WPDES permit unless it is a special permit specific to the project construction.
NR 162.04(3) (3)Limitation on eligibility of interim debt costs.
NR 162.04(3)(a) (a) Net interest expense. Interim debt interest expenses shall be offset with any interest earnings from the investment of the proceeds from the interim debt to determine the amount eligible for CWFP financial assistance.
NR 162.04(3)(b) (b) Interim debt issuance costs. The amount of interim debt issuance costs eligible for financial assistance is limited to $15,000 plus 0.5 percent of the total eligible face amount of the interim debt. If interim debt is rolled over or renewed, the face amount may not be counted multiple times in calculating the eligible face amount of interim debt for purposes of this limit.
NR 162.04(3)(c) (c) Interim interest costs. The period of time for which interest on interim debt is eligible for financial assistance shall run from no earlier than 18 months prior to the start of construction to the earliest of the following:
NR 162.04(3)(c)1. 1. The date of the first disbursement of the financial assistance.
NR 162.04(3)(c)2. 2. One year following substantial completion of the project.
NR 162.04(3)(d) (d) Cost proration. If the term of the interim debt exceeds the limit in par. (c), the interim debt costs shall be prorated using the length of the eligible term divided by the total time that the interim debt is outstanding. If the interim debt is not exclusively for the CWFP scored project, costs shall be prorated according to the proportion of the total debt that is for the scored project.
NR 162.04(3)(e) (e) Maximum principal. The amount of interim debt principal that may be refinanced with CWFP financial assistance shall not exceed the total amount of the interim debt that was spent on eligible project costs.
NR 162.04 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23; correction in (1) (a) 11. d., 24. g. made under s. 35.17, Stats., Register October 2023 No. 814.
NR 162.05 NR 162.05Application process.
NR 162.05(1)(1)Notice of intent to apply submittal. If required by the department, a municipality shall submit notice of its intent to apply for financial assistance via the department's online application systems by any applicable deadline set in the CWFP annual intended use plan under s. NR 162.02 (1). The municipality or its designated representatives shall complete the requirements established by the department for gaining access to and submitting information through the department's online application systems. The department may require the municipality to submit through the online systems any of the following:
NR 162.05 Note Note: Instructions regarding the online application systems are available on the Environmental Improvement Fund website at dnr.wi.gov/Aid/EIF.html.
NR 162.05(1)(a) (a) A clear, concise, and comprehensive project description that includes the problem or concern being addressed, the general solution proposed through a single project, and detailed information regarding what structures are to be constructed, what equipment is to be purchased and installed, and project location, including detailed information for purposes of eligibility determinations regarding storm sewer or watermain construction being done at the same time as sanitary sewer construction on the same block of a street or in the same intersection.
NR 162.05(1)(b) (b) Contact information.
NR 162.05(1)(c) (c) An estimate of the total project cost and what amount of the cost is likely to be requested from the CWFP.
NR 162.05(1)(d) (d) Estimated or actual dates related to the bidding and construction timeline of the project.
NR 162.05(1)(dm) (dm) Date and number of the department approval of plans and specifications for each set of plans and specifications associated with the project, if available at time of intent to apply or priority evaluation and ranking information submittal.
NR 162.05(1)(e) (e) Any other information required to complete the submission in the department's online application systems.
NR 162.05(2) (2)Facilities plan. A municipality shall submit a facilities plan or other applicable plan to the department for approval. The municipality shall receive approval of the facilities plan or other applicable plan prior to submitting an application for financial assistance under this subchapter.
NR 162.05(3) (3)Application procedures. A municipality shall apply for financial assistance in accordance with s. 281.58 (9), Stats. All applicants must submit the required information and documentation through the department's online application system.
NR 162.05 Note Note: Directions regarding online submittal are available on the Environmental Improvement Fund website at https://dnr.wisconsin.gov/aid/EIF.html. An interest rate subsidy application is a different form and must be submitted in accordance with s. NR 162.40.
NR 162.05(4) (4)Contents of application. The applicant shall submit a complete application, including each of the following items, if applicable to the project:
NR 162.05(4)(a) (a) Evidence of compliance with sub. (2).
NR 162.05(4)(b) (b) Construction plans and specifications submitted to the department in accordance with chs. NR 108 and 110 that are approvable under ch. 281, Stats. An applicant may be denied funding if the applicant does not provide appropriately complete project plans and specifications to the department prior to or with the application. The applicant shall submit a copy of approvable plans and specifications with the application in addition to the plans and specifications submitted to the department for plan review under chs. NR 108 and 110.
NR 162.05(4)(c) (c) Completion of the required fields in and upload of required documentation to the department's online application system, including all of the following:
NR 162.05(4)(c)1. 1. A clear, concise, and comprehensive project description, including any modifications to the project description previously provided in the online application systems.
NR 162.05(4)(c)2. 2. Estimated or actual construction costs.
NR 162.05(4)(c)3. 3. Identification of known ineligible costs included within the total budget provided in the online application.
NR 162.05(4)(c)4. 4. Information regarding assistance received or expected from another funding source.
NR 162.05 Note Note: The project description may already be included in the online application as it should transfer over to the application if previously provided with intent to apply or priority evaluation and ranking information. When that transfer of information is successful, the applicant must only provide information regarding any modifications to the project description that is already included in the application rather than providing an additional complete project description.
NR 162.05 Note Note: Under s. NR 162.04 (2) (om), the CWFP shall not provide any financial assistance for a project if construction costs are not included as part of the project costs to be funded by the CWFP, with the exception of certain situations in which other funding sources are also participating in the financing of the project or the project is the purchase of a package wastewater treatment plant or solely the purchase of equipment in a phase of a multi-phase project.
NR 162.05(4)(d) (d) Items or information for compliance with federal regulations identified by the department in the online application system as required for a complete application; these items may include documentation of compliance with wage rate laws, completed federal forms, and information regarding green project components, cost and effectiveness of the project, or procuring American-made products for use in the project.
NR 162.05(4)(e) (e) A copy of each executed engineering contract and any associated existing contract amendments for planning and design of the project if funds are requested for planning and design in the application project budget.
NR 162.05(4)(f) (f) A copy of each executed engineering contract and any associated contract amendments for construction management if funds are requested for construction management in the application project budget and the contract or amendment is available at the time of application submittal.
NR 162.05(4)(g) (g) A copy of each executed non-engineering professional services contract related to the project and any associated amendments if funds are requested in the application project budget for services included in the contract and the contract or amendment is available at the time of application submittal.
NR 162.05(4)(h) (h) A proposed or an executed intermunicipal agreement for each municipality served by the project when 2 or more municipalities utilize shared or interconnected wastewater treatment works. This paragraph does not apply to a metropolitan sewerage district in which all municipalities being served have been annexed into the sewerage district or to a situation in which the intermunicipal exception established in sub. (5) has been met. This paragraph does apply to biosolids or other treatment facilities when the applicant has ownership in the facility or has purchased capacity in the facility. Prior to receiving financial assistance, the applicant shall ensure that each required intermunicipal agreement does all of the following that are applicable to the project:
NR 162.05(4)(h)1. 1. Identify ownership for each individual portion of the wastewater treatment works, including wastewater treatment plants, interceptors, sewage collection systems, lift stations, biosolids facilities, and privately-owned treatment works.
NR 162.05(4)(h)2. 2. Establish the term of the intermunicipal agreement unless it is effective in perpetuity. If the intermunicipal agreement is new or being negotiated specifically for the project for which financial assistance is being requested, the term shall be for at least the term of the loan. If there is an existing intermunicipal agreement in place that meets the requirements of this paragraph but expires during the term of the loan, the municipality shall renegotiate or extend the existing agreement prior to the end of its term and maintain the intermunicipal agreement throughout the term of the loan.
NR 162.05(4)(h)3. 3. Demonstrate the basis for generating revenue for operation, maintenance, and replacement costs based on actual use or another equitable method, and state the parties that are responsible for paying these charges.
NR 162.05(4)(h)4. 4. Indicate the method for generating revenue for capital costs and indicate who is responsible for payment.
NR 162.05(4)(h)5. 5. Indicate that the owner of the regional facility shall accept the applicant's wastewater and identify the boundary from which the applicant's discharge originates.
NR 162.05(4)(i) (i) Financial information required by DOA to be used in determining the affordability of the proposed project, the financial capability of the municipality, and the adequacy of the pledge of revenues to repay the obligation securing the proposed financial assistance.
NR 162.05(4)(j) (j) A copy of the existing user charge system and sewer use ordinance, and information regarding the proposed user charge system and sewer use ordinance if they are new or if the existing user charge system or sewer use ordinance will be revised for the CWFP project.
NR 162.05(4)(k) (k) Any existing or proposed contracts with users of the wastewater treatment works.
NR 162.05(4)(L) (L) Documentation applicable to U.S. internal revenue service tax information as indicated in the department's online application system.
NR 162.05(4)(m) (m) A resolution declaring intent to reimburse municipal accounts with financial assistance proceeds that meets the requirements established in U.S. treasury reimbursement regulations 26 CFR 1.150-2.
NR 162.05(4)(n) (n) A copy of the debt instrument of any interim debt to be refinanced with CWFP financial assistance.
NR 162.05(4)(o) (o) A completed design life calculation worksheet if the applicant at the time of application requests or is interested in a loan term that is greater than 20 years. All of the following apply to applicants requesting a loan term greater than 20 years:
NR 162.05(4)(o)1. 1. An applicant requesting a loan term greater than 20 years shall pledge system revenues to secure the CWFP loan.
NR 162.05(4)(o)2. 2. A loan term greater than 20 years is not available for projects for which the applicant pledges general obligation bonds to secure the loan.
NR 162.05 Note Note: The design life calculation worksheet is an excel spreadsheet that is available on the department's website at https://dnr.wisconsin.gov/aid/documents/EIF/Forms/forms.html#cwform.
NR 162.05(5) (5)Intermunicipal exception. The department may waive the requirement of an intermunicipal agreement if an order under s. 281.43 (1), Stats., has been issued, or if the department has obtained executed intermunicipal agreements for subscribing municipalities and the receiving municipality whose annual debt payments, design flow capacities, design suspended solids capacities, and wastewater projects' design biochemical oxygen demand (BOD) capacities total at least 90 percent of the total for the regional treatment works or BMP.
NR 162.05(6) (6)Application submittal deadline. In fiscal years for which the department sets an application submittal deadline for all or a specific type of funding, the applicant shall submit the items and information required in the department's online application system by the application submittal deadline in order to be considered eligible to obtain financial assistance from funds available during the funding cycle for which the deadline is set. The department may set application submittal deadlines in the intended use plan.
NR 162.05(7) (7)Application acceptance. The department shall accept an application as complete after all of the following occur:
NR 162.05(7)(a) (a) The department determines that it received all the applicable items and information required under sub. (4) for the scored project. The department may consider a submitted application complete for purposes of acceptability if the application is otherwise complete but a wrong document was uploaded to the department's online application system, the proper document existed at the time of application submittal, and the applicant uploads the proper document to the system within a timeframe specified by the department.
NR 162.05(7)(b) (b) The department receives a certification worksheet documenting DOA's initial determination that there is a reasonable likelihood the municipality will be financially capable of repaying a loan from the CWFP.
NR 162.05(8) (8)Projects funded jointly with other agencies. If a project is receiving funding from another state or federal agency, and the department is unable to obtain the same type of documentation typically submitted for a specific project requirement due to differences between agencies in items or procedures, including a project that is let with a group of projects by the Wisconsin department of transportation or a project for which the contents of a contract includes language specific to another agency, the department may determine what documentation is appropriate to satisfy the application requirements.
NR 162.05(9) (9)Deadline for signing financial assistance agreement. The department shall set in the CWFP annual intended use plan a deadline for signing a financial assistance agreement. An applicant shall sign the financial assistance agreement within the timeframe set by the department. An applicant shall time its submittal of the application accordingly. If a financial assistance agreement is not signed within the established timeframe, the applicant's project shall lose its CWFP allocated subsidy.
NR 162.05 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23; correction in (4) (b) made under 35.17, Stats., Register October 2023 No. 814.
NR 162.055 NR 162.055Land ownership and easements documentation.
NR 162.055(1)(1)For projects for which an applicant requests financial assistance through the application process under s. NR 162.05 or 162.24, the applicant shall sign and submit a certification regarding ownership of the land or required easements and permits for access to the land, or both, on which the project takes place.
NR 162.055(2) (2) The department may require the applicant in addition to or in lieu of a certification under sub. (1) to submit a legal opinion when it is necessary, as determined by the department, to establish land ownership or easement rights, or both, of the project site.
NR 162.055 Note Note: Examples of when the department may require a legal opinion in addition to or in lieu of a certification include projects for which new land is being purchased by the applicant or the applicant is extending its facilities onto land on which no municipally owned infrastructure was previously located.
NR 162.055 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23; correction in numbering of (1) made under s. 13.92 (4) (b) 7., Stats., Register October 2023 No. 814.
NR 162.06 NR 162.06Financial assistance requirements. Before executing a financial assistance agreement for any project under this subchapter, the department shall determine that all of the applicable requirements of s. NR 162.05 are met and that all of the following are satisfied:
NR 162.06(1) (1) All of the following documentation, if applicable to the scored project, is submitted to the department:
NR 162.06(1)(a) (a) Certification for force account work as required by s. NR 162.08 (5).
NR 162.06(1)(b) (b) Initial flow documentation, if the scored project or a portion of the scored project is to construct a sewage collection system in or extend an interceptor to an unsewered area.
NR 162.06(1)(c) (c) A certification or legal opinion regarding land ownership and acquisition of easements and rights-of-way necessary for the project. The certification or legal opinion must include all the applicable information required under s. NR 162.055.
NR 162.06(1)(d) (d) Items related to bids for each prime contract, including all of the following:
NR 162.06(1)(d)1. 1. The proposal of the successful bidder.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.