NR 162.03(4)(a) (a) Projects of a municipality that is failing to substantially comply with conditions or requirements of s. 281.58 or 281.59, Stats., ch. Adm 35, ch. NR 162, an existing financial assistance agreement or interest rate subsidy agreement with the CWFP, a financial assistance agreement with the safe drinking water loan program under s. 281.61, Stats., or the terms of a federal or state grant used to pay the costs to plan, design, or construct a treatment works or BMP.
NR 162.03(4)(b) (b) As specified in s. 281.58 (8) (a) 2., Stats., privately-owned connection laterals and sewer lines that transport wastewater from structures to municipally-owned or privately-owned wastewater systems.
NR 162.03(4)(c) (c) Public sanitary sewer mains, interceptors, and individual systems that exclusively serve development not in existence as of the date the department receives an application submitted by a municipality under this chapter.
NR 162.03(4)(d) (d) Any project from which no construction costs are to be funded through the CWFP, unless another governmental agency is providing financing for the construction costs and the department receives acceptable documentation of the other agency's commitment, as determined by the department, except if purchasing existing treatment works is the general scope of the project.
NR 162.03(4)(e) (e) Dams, pipes, conveyance systems, and BMPs, including storm sewer rerouting and land acquisition, when intended solely for drainage and flood control.
NR 162.03(4)(f) (f) Any project of an unsewered municipality that will be disposing of wastewater in the treatment works of another municipality and the unsewered municipality has not executed an intermunicipal agreement under s. 66.0301, Stats., with the other municipality to receive, treat, and dispose of the wastewater of the unsewered municipality.
NR 162.03(4)(g) (g) Any project that includes 2 or more municipalities that utilize shared or interconnected treatment works or a BMP, unless the municipalities served by the project execute an intermunicipal agreement that meets the requirements described in s. NR 162.05 (4) (h). This paragraph does not apply to a metropolitan sewerage district in which all municipalities being served have been annexed into the sewerage district or to a situation in which the intermunicipal exception under s. NR 162.05 (5) has been met.
NR 162.03(4)(h) (h) Projects that have been substantially complete for 3 years or longer.
NR 162.03 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23; correction in (1) (a) 1. made under s. 35.17, Stats., Register October 2023 No. 814.
NR 162.04 NR 162.04Cost eligibility.
NR 162.04(1)(1)Eligible costs.
NR 162.04(1)(a)(a) Eligible at a subsidized rate. Allocable project-specific costs that are necessary and reasonable are eligible for financial assistance. Eligible costs include expenses incurred by the municipality for any of the following items and activities when specific to the scope of a scored project, or when approved by the department as necessary and reasonable for the efficient operation or integrity of the overall treatment works:
NR 162.04(1)(a)1. 1. `Abandonment.' Abandonment of treatment works if approved in the plans and specifications of a scored project or by department staff, including activities such as demolition, re-landscaping, and removal and disposal of municipal waste or other debris.
NR 162.04(1)(a)2. 2. `Access roads.' Construction of roadways necessary to provide appropriate access to facilities such as lift stations and treatment plants.
NR 162.04(1)(a)3. 3. `Acquisition of facilities.' Costs associated with acquiring facilities of an existing treatment works if the municipality will own, operate, and maintain the facilities throughout the term of the financial assistance agreement.
NR 162.04(1)(a)4. 4. `Administrative buildings and equipment.' Buildings, offices, and office equipment and furnishings used for purposes of operating a treatment works, such as administration and storage buildings, if included in the approved plans and specifications or otherwise approved by department staff. The department may prorate costs for buildings, offices, and office equipment and furnishings that are partially used for purposes not related to the treatment works.
NR 162.04(1)(a)5. 5. `Administrative costs of a commission.' Administrative, legal, and other costs incurred by a commission solely for the scored project if identifiable in a contract or agreement between the member municipalities.
NR 162.04(1)(a)6. 6. `Compliance with state and federal requirements.' Costs incurred for activities associated with complying with state and federal requirements related to the scored project.
NR 162.04 Note Note: Federal and state requirements may include any of the following: Americans with Disabilities Act design and construction; green project reserve documentation; Davis-Bacon and Related Acts administration as required under Section 513 of the Federal Water Pollution Control Act 33 USC 1372 or other activities associated with wage rate requirements; DBE solicitation and documentation; activities associated with the use of products made in the United States; environmental review of project sites and other activities related to ch. NR 150 compliance, including costs of public notices and hearings; historical, architectural, archaeological, and cultural resources work identified during planning, design, or construction of the project and incurred prior to project closeout; signage requirements, including on a website or at a wastewater treatment facility or project site; audit activities related to the federal single audit act portion of the municipality's annual audit report until the project is complete.
NR 162.04(1)(a)7. 7. `Construction activities.' Activities defined in s. NR 162.003 (16) and included in construction contracts or performed as force account work, including any of the following:
NR 162.04(1)(a)7.a. a. Replacing, repairing, or rehabilitating a treatment works if identified in the plans and specifications as cost-effective and necessary.
NR 162.04(1)(a)7.b. b. Restoring streets and rights-of-way and repairing damage to items such as pavement, sidewalks, watermains, and storm sewers necessary as a direct result of construction of the scored project.
NR 162.04(1)(a)7.c. c. Punch list item activities.
NR 162.04(1)(a)7.d. d. Acquiring, consuming, or expending materials.
NR 162.04(1)(a)7.e. e. Obtaining products that comply with federal requirements to use products made in the United States in CWFP projects.
NR 162.04(1)(a)7.f. f. Other capital costs incurred solely for purposes of the scored project.
NR 162.04(1)(a)8. 8. `Demolition.' Demolishing existing structures if the demolition is part of a scored project and any of the following applies:
NR 162.04(1)(a)8.a. a. The existing structure is part of the wastewater treatment works.
NR 162.04(1)(a)8.b. b. The demolition is necessary for site preparation.
NR 162.04(1)(a)8.c. c. The demolition is included in abandonment procedures as approved in the plans and specifications of the scored project or when otherwise approved by department staff.
NR 162.04(1)(a)8.d. d. The demolition entails removal of equipment or materials, or both, from inside an existing building or other structure that is part of the treatment works being modified or repurposed as part of the scored project.
NR 162.04(1)(a)9. 9. `Discharge monitoring.' The cost of equipment owned or to be owned by the municipality for monitoring, sampling, and analyzing industrial discharges to a municipal wastewater treatment works.
NR 162.04(1)(a)10. 10. `Easements and rights-of-way.' Acquisition of easements and rights–of–way, including purchase cost and administrative and legal expenses.
NR 162.04(1)(a)11. 11. `Equipment.' Equipment related to the scored project, the costs of which the department may prorate if the municipality intends to use the equipment for multiple purposes rather than solely for the treatment works. Eligible equipment includes any of the following:
NR 162.04(1)(a)11.a. a. Mobile equipment, such as portable stand-by generators, portable emergency pumps, and grounds and maintenance equipment for mowing and snow removal, for the treatment works.
NR 162.04(1)(a)11.b. b. Spare parts if included in the plans and specifications or otherwise approved by the department.
NR 162.04(1)(a)11.c. c. Machinery for manufacturing or repairing necessary tools or equipment for the treatment works.
NR 162.04(1)(a)11.d. d. Computers, tablets, and related equipment, including purchasing, installing, programming, or upgrading computers, printers, control systems, and other computer-related equipment necessary for operating and maintaining the treatment works. Equipment and systems for accounting, billing, public notification, testing, monitoring, reporting, emergency alerts, communications, geographic information, and supervisory control and data acquisition are included under this subd. 11. d.
NR 162.04(1)(a)12. 12. `Fees.' Fees paid by the municipality for any of the following:
NR 162.04(1)(a)12.a. a. Permits obtained for construction, including building, electrical, and plumbing permits, pit or trench dewatering permits, construction site storm water permits, and railroad crossing permits.
NR 162.04 Note Note: Permit fees are not required by the department for waterway projects authorized under ch. 30, Stats., that are funded in whole or in part by any federal or state agency. Therefore, if a municipality at the time of purchase of a permit under ch. 30, Stats., pays a fee for the permit due to not identifying the project as being funded with state or federal funds, the fee is not eligible for reimbursement by the CWFP.
NR 162.04(1)(a)12.b. b. Legal fees of an attorney that is not an on-staff municipal attorney, including costs of legal reviews of architectural, engineering, or construction contracts, user charge systems and sewer use ordinances, management plans, intermunicipal agreements, and legal work necessary for securing eligible permits.
NR 162.04(1)(a)12.c. c. Service fees paid to a state or federal agency, except administrative fees paid annually along with principal and interest payments on a CWFP loan.
NR 162.04(1)(a)13. 13. `Groundwater monitoring.' Installing groundwater monitoring equipment or facilities.
NR 162.04(1)(a)14. 14. `Insurance.' Purchasing insurance necessary during construction of the scored project, including property, liability, builder's risk, and construction insurance.
NR 162.04(1)(a)15. 15. `Interim debt.' Costs associated with interim debt for the scored project as delineated in sub. (3).
NR 162.04(1)(a)16. 16. `Laboratories.' Laboratory equipment related to initial setup or a significant upgrade or expansion of an on-site laboratory if requested in the financial assistance application.
NR 162.04(1)(a)17. 17. `Land acquisition.' Acquiring land, including purchase cost and administrative and legal expenses if any of the following applies:
NR 162.04(1)(a)17.a. a. The land will be used for storage of treated wastewater in land treatment systems before land application.
NR 162.04(1)(a)17.b. b. The land will be used for composting or temporary storage of compost residues that result from wastewater treatment if the department has approved a program for use of the compost.
NR 162.04(1)(a)17.c. c. The land is property on which the wastewater treatment works, biosolids facility, or lift stations will be located.
NR 162.04(1)(a)17.d. d. The land will serve to isolate a treatment facility as required under s. NR 110.15 (3) (d).
NR 162.04(1)(a)17.e. e. The land will be used for sludge spreading.
NR 162.04(1)(a)17.f. f. The land is the property on which individual systems are or will be located if the systems are publicly owned and maintained.
NR 162.04(1)(a)18. 18. `Lines to public sewer mains.' Pumping units and pressurized lines from the pumping units to the public sanitary sewer main, or holding and septic tanks and their sewer lines to the public sanitary sewer main, that are included in a sewage collection system, are cost–effective, and are owned and maintained by the applicant municipality.
NR 162.04(1)(a)19. 19. `Management plans.' Developing a detailed management plan related to a scored project.
NR 162.04(1)(a)20. 20. `Municipal staff, equipment, and materials.' Municipal expenses incurred solely for the scored project and documented by the municipality as force account work, including any of the following:
NR 162.04(1)(a)20.a. a. Salary and benefits of municipal employees, except elected officials or on-staff attorneys, for time spent working directly on the scored project.
NR 162.04(1)(a)20.b. b. Expendable material costs incurred by the municipality.
NR 162.04(1)(a)20.c. c. Estimated costs incurred using equipment owned by the municipality.
NR 162.04(1)(a)21. 21. `Municipally owned facilities on private property.' Grinder pumps, sewer laterals, service connections, service branches, risers, and riser pipes if located on private property and municipally owned and municipally maintained or if located on municipally owned land.
NR 162.04(1)(a)22. 22. `Pretreatment or toxicity reduction.' Developing a municipal pretreatment or toxicity reduction program and constructing facilities to be used by the municipal treatment works in the program, including monitoring equipment.
NR 162.04(1)(a)23. 23. `Professional services.' Engineering, architectural, legal, and other professional services and fees, including any of the following:
NR 162.04(1)(a)23.a. a. Conducting value engineering studies or analyses during the design phase.
NR 162.04(1)(a)23.b. b. Conducting system evaluations and studies.
NR 162.04(1)(a)23.c. c. Developing facilities plans and engineering reports.
NR 162.04(1)(a)23.d. d. Developing, preparing, and submitting plans and specifications.
NR 162.04(1)(a)23.e. e. Preparing, printing, and distributing bidding documents.
NR 162.04(1)(a)23.f. f. Gathering documents and information for, completing, and submitting CWFP financial assistance applications or interest rate subsidy applications and other forms required for financial assistance.
NR 162.04(1)(a)23.g. g. Developing or revising an operations and maintenance manual.
NR 162.04(1)(a)23.h. h. Preparing a plan of operation for the project.
NR 162.04(1)(a)23.i. i. Advertising for and conducting bid lettings.
NR 162.04(1)(a)23.j. j. Analyzing bids, preparing award recommendations, and preparing contracts.
NR 162.04(1)(a)23.k. k. Providing construction management, observation, and inspection.
NR 162.04(1)(a)23.L. L. Preparing for and facilitating public education and participation opportunities.
NR 162.04(1)(a)23.m. m. Travel, indirect costs, and labor for services provided for the scored project.
NR 162.04(1)(a)23.n. n. Developing or updating a user charge system or a sewer use ordinance for wastewater treatment and the sewerage system in the municipality.
NR 162.04(1)(a)23.o. o. Preparing environmental assessment reports and evaluations.
NR 162.04(1)(a)23.p. p. Conducting archaeological surveys and gathering historical site information.
NR 162.04(1)(a)23.q. q. Providing municipal advisor or bond counsel services related to loan closing or the issuance of bonds.
NR 162.04(1)(a)23.r. r. Preparing a water conservation plan.
NR 162.04(1)(a)23.s. s. Producing record drawings.
NR 162.04(1)(a)23.t. t. Updating or upgrading treatment works maps of the areas impacted by the scored project.
NR 162.04(1)(a)23.u. u. Monitoring required use of American-made products.
NR 162.04(1)(a)23.v. v. Providing administration of activities related to the federal Davis-Bacon and Related Acts or other wage requirements.
NR 162.04 Note Note: Links to the Davis-Bacon and Related Acts can be found on the U.S. department of labor's website at https://www.dol.gov/agencies/whd/government-contracts/construction/laws. The Davis-Bacon Act is found in 40 USC 3141 et seq. with procedures and rules in 29 CFR Parts 1 to 7.
NR 162.04(1)(a)23.w. w. Conducting research or energy audits for incorporation of energy and water efficiency and conservation into the planning and design of a project.
NR 162.04 Note Note: When 10 percent or more of the project's construction and equipment costs are deemed ineligible for CWFP financial assistance, the costs associated with engineering for those ineligible construction and equipment costs are also ineligible under sub. (2) (h).
NR 162.04(1)(a)24. 24. `Project site.' Construction-related work activities at the project site of a scored project, including any of the following: