This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 153.14(5)(b) (b) The project shall be designed to control the most critical nonpoint pollution sources within a designated watershed area.
NR 153.14 Note Note: The boundaries of the watershed area will be based on factors including the amount of funds available, the management needs identified in the TMDL and the management strategy set forth in the TMDL implementation plan.
NR 153.14(5)(c) (c) The project shall be limited to managing agricultural sources of nonpoint pollution.
NR 153.14(5)(d) (d) The project shall focus on controlling those nonpoint pollution sources in the project area that are determined to be significant based on their relative contribution to the impairment and that can be cost-effectively controlled.
NR 153.14(5)(e) (e) The intended project period may not exceed 3 years in duration, with the possibility of extension to 4 years if approved by the department.
NR 153.14(6) (6)Small-scale TMDL implementation project eligibility criteria. Small-scale TMDL implementation projects shall meet the following specific criteria:
NR 153.14(6)(a) (a) The project shall directly implement the pollutant-specific goals of either a draft TMDL, a US EPA-approved TMDL, a draft TMDL implementation plan, a department approved TMDL implementation plan, or an equivalent to any of the foregoing as identified by the department.
NR 153.14(6)(b) (b) The project may focus on one or more sites or farms.
NR 153.14(6)(c) (c) The project may address nonpoint pollution from either agricultural or urban sources.
NR 153.14(6)(d) (d) The project shall focus on controlling those nonpoint pollution sources in the project area that are determined to be significant based on their relative contribution to the impairment and that can be cost-effectively controlled.
NR 153.14(6)(e) (e) The intended project period may not exceed two years in duration, with the possibility of extension to 3 years if approved by the department.
NR 153.14(7) (7)Large-scale non-TMDL control projects eligibility criteria. Large-scale non-TMDL control projects shall meet the following specific criteria:
NR 153.14(7)(a) (a) The project shall implement water resource management goals included in a watershed plan or strategy acceptable to the department.
NR 153.14(7)(b) (b) The project shall be designed to control the most critical nonpoint pollution sources within a designated watershed area. The designated watershed area shall be not less than 8 square miles nor more than 39 square miles in areal extent.
NR 153.14 Note Note: The Wisconsin Buffer Initiative finds that watersheds in this size range provide the best opportunity for cost-effectively solving surface water resource problems in threatened or partially degraded waters using agricultural nonpoint source pollution control best management practices. The Wisconsin Buffer Initiative is published by the University of Wisconsin College of Agricultural and Life Sciences. Copies are on file with the department and the secretary of state.
NR 153.14(7)(c) (c) The project shall be limited to managing agricultural sources of nonpoint pollution.
NR 153.14(7)(d) (d) The project shall focus on controlling those nonpoint pollution sources in the project area that are determined to be significant based on their relative contribution to the impairment and that can be cost-effectively controlled.
NR 153.14(7)(e) (e) The project shall focus on attainment of performance standards and prohibitions established by the department under s. 281.16 (3), Stats.
NR 153.14(7)(f) (f) The intended project period may not exceed 3 years in duration, with the possibility of extension to a fourth year if approved by the department.
NR 153.14(8) (8)Small-scale non-TMDL control project eligibility criteria. Small-scale nonpoint source control projects shall meet the following specific criteria:
NR 153.14(8)(a) (a) The project may focus on one or more sites or farms.
NR 153.14(8)(b) (b) The project may address nonpoint pollution from either agricultural or urban sources.
NR 153.14(8)(c) (c) Agricultural projects shall be designed to achieve attainment of agricultural performance standards and prohibitions established by the department under s. 281.16 (3), Stats. Urban projects shall be designed to achieve attainment of non-agricultural performance standards established by the department under s. 281.16 (2), Stats.
NR 153.14(8)(d) (d) The intended project period may not exceed 2 years in duration, with the possibility of extension to 3 years if approved by the department.
NR 153.14 Note Note: TMDL implementation projects contribute to the cost-effective removal of surface waters from the state's impaired waters list in a way that is consistent with TMDLs and TMDL implementation plans. The degree to which compliance with state performance standards and prohibitions is needed to address these impairments will vary by waterbody.
NR 153.14 Note Non-TMDL control projects improve degraded surface waters (including surface waters on the section 303 (d) list that do not yet have TMDLs or TMDL implementation plans), to improve degraded groundwater and to protect threatened and high quality surface and ground waters from degradation. These projects achieve their goals by implementing state performance standards and prohibitions.
NR 153.14 Note Large-scale projects and small-scale TMDL implementation projects set control priorities based on a watershed plan or other process to identify needs and cost-effective strategies. Small-scale non-TMDL control projects implement state performance standards and prohibitions wherever they may occur, leading to a general reduction in nonpoint source pollution.
NR 153.14 History History: CR 00-025: cr. Register September 2002 No. 561, eff. 10-1-02; CR 09-112: r. and recr. Register December 2010 No. 660, eff. 1-1-11; correction in (7) (title), (8) (title) made under s. 13.92 (4) (b) 2., Stats., Register December 2010 No. 660.
NR 153.145 NR 153.145Eligible notice of discharge projects.
NR 153.145(1)(1) This section applies only to notice of discharge projects.
NR 153.145(2) (2) Eligibility for funding under this section includes notice of discharge projects that implement best management practices for animal waste management at animal feeding operations for which the department has issued a notice required under s. 281.65 (4e), Stats. Notice of discharge projects shall be designed to meet the water quality goals established in s. 281.65 (4e), Stats.
NR 153.145 Note Note: The department may fund management practices to meet notice of discharge requirements in two ways. It may fund required management practices through a notice of discharge project authorized under s. 281.65 (4e), Stats. Alternatively, it may fund the required management practices under a targeted runoff management project authorized under s. 281.65 (4c), Stats. This chapter establishes separate requirements and procedures for each of these alternative funding mechanisms.
NR 153.145 History History: CR 09-112: cr. Register December 2010 No. 660, eff. 1-1-11.
NR 153.15 NR 153.15Cost sharing for best management practices.
NR 153.15(1)(1)Eligible costs.
NR 153.15(1)(a)(a) The department may provide cost sharing for the construction or implementation of best management practices in any project selected for funding under the chapter. The department may attribute design and construction services costs to the cost of construction or implementation of the best management practice. State and local administrative permit fees are not reimbursable as part of the construction cost.
NR 153.15 Note Note: Although local administrative fees are not reimbursable, the department may reimburse governmental units for design and construction services subject to the limitations of s. NR 153.27 (4).
NR 153.15(1)(b)1.1. If the purpose of the best management practice is to comply with agricultural performance standards and prohibitions identified in subch. II of ch. NR 151, technical standards for the best management practice shall be included in subch. VIII of ch. ATCP 50 in order for the best management practice to be considered eligible for cost sharing under this chapter.
NR 153.15(1)(b)2. 2. Subd.1 does not apply if the department determines there is no technical standard in subch. VIII of ch. ATCP 50 capable of meeting the performance standard or prohibition.
NR 153.15(1)(c) (c) If the purpose of the best management practice is to comply with a non-agricultural performance standard under subch. III or IV of ch. NR 151, or if the purpose of the best management practice is to reduce pollution from a source for which a performance standard is not included in ch. NR 151, the best management practice shall meet one of the following criteria to be considered eligible for cost sharing under this chapter:
NR 153.15(1)(c)1. 1. Be included in ch. NR 154.
NR 153.15(1)(c)2. 2. Be included in subch. VIII of ch. ATCP 50.
NR 153.15(1)(c)3. 3. Be available in accordance with the technical standards development and dissemination requirements of subch. V of ch. NR 151.
NR 153.15(1)(c)4. 4. Be identified by the department as an interim best management practice or alternative design criteria in accordance with sub. (3) (b) 4.
NR 153.15(1)(d) (d) The best management practice shall be constructed in accordance with applicable technical standards and conditions identified in this chapter, subch. VIII of ch. ATCP 50, ch. NR 154, in a document that meets the requirements of subch. V of ch. NR 151 or a runoff management grant agreement as provided for under sub. (3) in order to be considered eligible for cost sharing under this chapter.
NR 153.15(1)(e) (e) The best management practice shall be included as an eligible item for cost sharing on a runoff management grant agreement, signed by the department and the governmental unit or state agency, in order to be considered eligible for cost sharing under this chapter.
NR 153.15(1)(f) (f) If a cost-share agreement is required, the best management practice shall be included as an eligible item on the cost-share agreement, signed by the governmental unit and a landowner, land operator or state agency in order to be considered eligible for cost sharing under this chapter.
NR 153.15(1)(g) (g) Best management practices funded under s. 20.866 (2) (te) or (tf), Stats., shall meet requirements for use of bond-sourced funding.
NR 153.15 Note Note: This section governs what pollution sources are eligible for cost sharing under ch. NR 153. It does not address requirements for compliance with performance standards, nor does it address cost-share funding as a precondition for compliance. Compliance requirements, including when cost-share funding must be made available as a precondition of compliance, are set forth in ss. NR 151.09 and 151.095.
NR 153.15(2) (2)Ineligible costs. All of the following practices, sources or activities are ineligible for cost sharing under this chapter unless approved by the department as part of a demonstration project in accordance with sub. (4):
NR 153.15(2)(a) (a) Best management practices for croplands classified as “new" under s. NR 151.09 (4) (b) 3. or best management practices for livestock facilities classified as “new" under s. NR 151.095 (5) (b) 2.
NR 153.15(2)(ag) (ag) Best management practices to address pollution from a livestock facility or cropland practice that was previously in compliance with standards and prohibitions on or after the date the standard or prohibition became effective under ch. NR 151, regardless of cost share history. The department may make an exception and provide cost sharing to replace practices or practice components previously cost shared by the department that are ineffective during the operation and maintenance period due to unforeseen design problems.
NR 153.15 Note Note: If a source loses its compliance status because of changes to the standard, cost sharing may be offered for management measures needed to bring the source into compliance with the new standard.
NR 153.15(2)(ar) (ar) Best management practices to address a pollution source for which the department included a previous offer of cost sharing as part of a notice issued pursuant to ch. NR 151 and the management practices were not installed within the required compliance period.
NR 153.15(2)(b) (b) Routine operation and maintenance of best management practices. The department may provide cost sharing one time to re-establish an agricultural best management practice cost shared after October 1, 2002, that is damaged within the cost-share operation and maintenance period by natural causes beyond the control of the landowner or land operator.
NR 153.15(2)(d) (d) Significant expansions of livestock operations are not eligible for cost sharing. The department shall use the criteria in this paragraph for determining whether an increase in the size of the livestock population constitutes a significant expansion and is ineligible for cost sharing. In this paragraph, “livestock population size" means the size of the livestock population, in animal units. In this paragraph, “base livestock population size" means the livestock population size determined when the department or governmental unit, including a county land conservation committee, documents the size of the livestock population. In this paragraph, “animal unit" has the meaning given it in ch. NR 243.
NR 153.15(2)(d)1. 1. If the base livestock population size is less than or equal to 250 animal units, that portion of the expansion that results in a livestock population size exceeding 300 animal units is considered to be significant and ineligible for cost sharing under this chapter.
NR 153.15(2)(d)2. 2. If the base livestock population size is greater than 250 animal units but less than that required to apply for a WPDES permit under s. NR 243.12 (1) (a) or (b), and the expanded livestock population size will be less than that required to apply for a WPDES permit under s. NR 243.12 (1) (a) or (b), that portion of the expansion that is greater than 20% of the base livestock population size is considered to be significant and ineligible for cost sharing under this chapter.
NR 153.15(2)(d)3. 3. Any expansion to a base livestock population size that results in a livestock population size required to apply for a WPDES permit under s. NR 243.12 (1) (a) or (b) is considered to be significant and ineligible for cost sharing under this chapter, and shall also render the base livestock population component ineligible for cost sharing in accordance with par. (f) 2.
NR 153.15 Note Note: The department may not provide cost sharing under this chapter for activities requiring coverage under a WPDES permit for livestock operations.
NR 153.15(2)(e) (e) Best management practice installation activities conducted prior to the signing of the runoff management grant agreement and the cost-share agreement. This paragraph does not preclude the department from providing reimbursement for structural best management practice design work commenced or completed prior to signing the runoff management grant agreement and the cost-share agreement, provided that practice construction commences after the grant agreement is signed by all parties.
NR 153.15(2)(f) (f) Activities requiring coverage under a WPDES permit including any of the following:
NR 153.15(2)(f)1. 1. Activities requiring WPDES permit coverage at livestock operations with less than 1,000 animal units that have been issued a WPDES permit by the department under ch. 283, Stats. In this paragraph, “livestock operation" has the meaning given in s. 281.16 (1) (c), Stats. In this paragraph, “animal unit" has the meaning given in ch. NR 243.
NR 153.15(2)(f)2. 2. Activities requiring WPDES permit coverage at livestock operations that have, or will have within 12 months, at least 1,000 animal units and are required to apply for a WPDES permit under s. NR 243.12 (1) (a) or (b).
NR 153.15(2)(f)3. 3. All other activities requiring coverage under a WPDES permit issued under chs. NR 200 to 240 and 245 to 299 except for activities required of the city of Racine to comply with municipal storm water permit requirements under ch. NR 216.
NR 153.15 Note Note: A municipality required to comply with storm water permitting requirements under ch. NR 216 may apply for grant funding under ch. NR 155.
NR 153.15(2)(g) (g) Activities required as part of or as a condition of a license for a solid waste management site.
NR 153.15(2)(h) (h) Activities funded through state or federal grants for wastewater treatment plants.
NR 153.15(2)(i) (i) Active mining activities.
NR 153.15(2)(j) (j) Urban best management practices associated with new construction or new development, including the following:
NR 153.15(2)(j)1. 1. Construction site erosion control measures subject to the requirements of s. NR 151.11, except those required by this chapter to control erosion during construction of a best management practice.
NR 153.15(2)(j)2. 2. Post-construction storm water management practices for new development subject to the requirements of subch. III of ch. NR 151.
NR 153.15(2)(j)3. 3. The department may consider redevelopment of an existing development and in-fill to be either existing development or new development for purposes of this paragraph. In making its determination, the department shall consider the type of land cover within and adjacent to the development and the areal extent of the development.
NR 153.15(2)(j)4. 4. In this paragraph, “ existing development" has the meaning given it in s. NR 151.002 (14g), “in-fill" has the meaning given it in s. NR 151.002 (18), and “new development" means development resulting from the conversion of previously undeveloped land or agricultural land uses initiated after October 1, 2004, or development for which a notice of intent was received by the department or the department of safety and professional services after October 1, 2004.
NR 153.15(2)(k) (k) Pollutant control measures needed during construction of highways and bridges.
NR 153.15(2)(L) (L) The planting of trees intended for commercial harvest.
NR 153.15(2)(m) (m) Installing, operating or repairing a small-scale on-site human domestic waste facility.
NR 153.15(2)(n) (n) Dredging of harbors, lakes, rivers and ditches.
NR 153.15(2)(o) (o) Installing dams, pipes, conveyance systems and urban best management practices, including storm sewer rerouting and land acquisition, when intended solely for flood control. In this paragraph, “dam" means any artificial barrier in or across a waterway, which has the primary purpose of impounding or diverting water. A dam includes all appurtenant works, such as a dike, canal or powerhouse.
NR 153.15(2)(p) (p) Practices other than those in ch. NR 154 that are normally and routinely used in growing crops and required for the growing of crops or the feeding of livestock.
NR 153.15(2)(q) (q) Practices whose purpose is to accelerate or increase the drainage of land or wetlands, except where drainage is required as a component of a best management practice.
NR 153.15(2)(r) (r) Practices to control spills from commercial bulk storage of pesticides, fertilizers, petroleum and similar materials required by ch. ATCP 33 or other administrative rules.
NR 153.15(2)(s) (s) Practices to be fully funded through other programs.
NR 153.15(2)(t) (t) Practices previously installed and necessary to support cost-shared practices.
NR 153.15(2)(u) (u) Changes in crop rotation unless required as a component of practices in subch. VIII of ch. ATCP 50 or ch. NR 154.
NR 153.15(2)(v) (v) Minimum levels of street sweeping and leaf collection.
NR 153.15(2)(w) (w) Changes in location of unconfined manure stacks involving no capital cost.
NR 153.15(2)(x) (x) Purchase of non-stationary manure spreading equipment.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.