NR 131.103(8)(a)(a) “Mining waste” or “nonferrous mining waste” means any refuse, sludge, or other discarded material, including solid, liquid, semi-solid, or contained gaseous material, resulting from nonferrous metallic mineral prospecting or mining, or from the cleaning or preparation of nonferrous metallic minerals during prospecting or mining operations. NR 131.103(8)(b)(b) “Mining waste” includes tailings, waste rock, mine overburden, and waste treatment sludges. NR 131.103(8)(c)(c) “Mining waste” does not include topsoil and mine overburden not disposed of in a waste site, but placed in a facility permitted under this chapter or ch. NR 132, to be returned to the mine site or used in the reclamation process, and does not include merchantable by-products. NR 131.103(8)(d)(d) “Mining waste” does not include trees and other vegetation removed from the mining site during site preparation and facility construction. NR 131.103(9)(9) “Monitoring data” means the data collected by the operator or the department after the commencement of prospecting. NR 131.103(10)(10) “Nonferrous metallic mineral” means an ore or other earthen material to be excavated from the natural deposits on or in the earth for its metallic content but not primarily for its iron oxide content. NR 131.103 NoteNote: This definition does not apply to substances mined primarily for their iron oxide content. This definition includes substances mined for the purpose of extracting a metal or metals such as copper, zinc, lead, gold, silver, titanium, vanadium, nickel, cadmium, molybdenum, chromium, manganese, cobalt, zirconium, beryllium, thorium, and uranium.
NR 131.103(11)(11) “Non-mining solid waste” means solid waste generated as part of a nonferrous prospecting or mining operation that is not mining waste and includes materials such as discarded vegetation, tires, barrels, sanitary waste, and various other solid waste materials defined in ch. NR 500, including construction and demolition waste, garbage, commercial solid waste and municipal solid waste. NR 131.103(12)(12) “Operator” means any person who is engaged in, or who has applied for or holds a permit to engage in prospecting, whether individually, jointly or through subsidiaries, agents, employees or contractors. NR 131.103(13)(13) “Ore” means a naturally occurring material from which nonferrous metallic minerals may be recovered at a profit. NR 131.103(14)(14) “Overburden” means any unconsolidated geologic material, such as till, sand and gravel, and weathered bedrock that may be removed during prospecting or mining. NR 131.103(15)(15) “Person” means an individual, owner, operator, corporation, limited liability company, partnership, association, municipality, interstate agency, state agency, or federal agency. NR 131.103(16)(16) “Principal shareholder” means any person who owns at least 10 percent of the beneficial ownership of an operator. NR 131.103 NoteNote: Section 293.01 (18), Stats., defines “prospecting” to mean: “engaging in the examination of an area for the purpose of determining the quality and quantity of nonferrous metallic minerals, other than for exploration or bulk sampling but including the obtaining of a nonferrous metallic mineral sample, by such physical means as excavating, trenching, construction of shafts, ramps and tunnels and other means, other than for exploration or bulk sampling, which the department, by rule, identifies, and the production of prospecting refuse and other associated activities. “Prospecting” shall not include such activities when the activities are, by themselves, intended for and capable of commercial exploitation of the underlying nonferrous ore body. However, the fact that prospecting activities and construction may have use ultimately in mining, if approved, shall not mean that prospecting activities and construction constitute mining within the meaning of sub. (9), provided such activities and construction are reasonably related to prospecting requirements.” NR 131.103(18)(18) “Prospecting permit” means the permit which is required of all persons as a condition precedent to commencing prospecting at a location. NR 131.103(19)(19) “Prospecting plan” means the proposal for prospecting of the prospecting site. NR 131.103(20)(20) “Prospecting site” means the lands on which prospecting is actually conducted as well as those lands on which physical disturbance will occur as a result of such activity including a mining waste facility, if one is needed, corridors for access roads and other activities related to the prospecting operation but does not include environmental monitoring sites located off of the main portion of the prospecting site. NR 131.103(21)(21) “Prospector” means any person engaged in prospecting. NR 131.103(22)(22) “Reclamation” means the process by which an area physically or environmentally affected by prospecting is rehabilitated to either its original state or, if this is shown to be physically or economically impracticable or environmentally or socially undesirable, to a state that provides long-term environmental stability. Reclamation shall provide the greatest feasible protection to the environment and shall include, but is not limited to, the criteria for reclamation set forth in s. 293.13 (2) (c), Stats. NR 131.103(23)(23) “Reclamation plan” means the proposal for the reclamation of the prospecting site that must be approved by the department under s. 293.45, Stats., as part of the prospecting permit, and includes the closure requirements of ch. NR 182 for facilities licensed under that chapter, if any. NR 131.103(24)(24) “Refuse” means all waste soil, overburden, rock, mineral, liquid, vegetation, and other material, directly resulting from or displaced by the prospecting, and from the cleaning or preparation of nonferrous metallic minerals during prospecting operations, including all waste materials deposited on or in the prospecting site from other sources. NR 131.103(25)(25) “Unsuitable” or “unsuitability” means that the land proposed for prospecting is not suitable for such activity because the prospecting activity itself may reasonably be expected to destroy or irreparably damage any of the following: NR 131.103(25)(a)(a) Habitat required for survival of species of vegetation or wildlife as designated in ch. NR 27, if such endangered species cannot be firmly reestablished elsewhere. NR 131.103(25)(b)(b) Unique features of the land, as determined by state or federal designation as any of the following, that cannot have their unique characteristic preserved by relocation or replacement elsewhere: NR 131.103(25)(c)(c) Other areas of a type designated by statute or administrative rule as unique or unsuitable for prospecting or surface mining. NR 131.103(26)(26) “Waste rock” means consolidated geologic material that has been excavated during the prospecting process but is not of sufficient value to constitute ore. NR 131.103(27)(27) “Wetlands” means an area where water is at, near or above the land surface long enough to be capable of supporting aquatic or hydrophytic vegetation and which has soils indicative of wet conditions. NR 131.103 HistoryHistory: CR 20-043: cr. Register December 2021 No. 792, eff. 1-1-22; correction in (4), (25) (b) 5., made under s. 35.17, Stats., and correction in (17) made under s. 13.92 (4) (b) 7., Stats., Register December 2021 No. 792. NR 131.104NR 131.104 Environmental baseline data collection prior to preapplication notification. NR 131.104(1)(1) A person who intends to submit a preapplication notification under s. 293.31, Stats., may, prior to obtaining, collecting, or generating environmental baseline data intended to be used to support a prospecting permit application, submit to the department a description of the methodology that the person intends to use in obtaining, collecting, or generating the data. The description shall include all of the following: NR 131.104(2)(2) Information submitted under sub. (1), shall be submitted in a format prescribed by the department, including a complete electronic version and duplicate reproducible paper copies of the information in a quantity specified by the department. NR 131.104(3)(3) Any request under sub. (1) for department review of proposed environmental data collection methodology shall be accompanied by a fee of $1,500. The department may waive the fee if the requested review is of limited scope or is substantively duplicative of previous requests. NR 131.104(4)(a)(a) The department shall review the proposed methodology and shall either inform the person that the proposed methodology is accepted by the department or provide the person with the methodology that the department requires the person to use. NR 131.104(4)(b)(b) The review conducted by the department under this subsection is limited specifically to the proposed methodology for data collection and analysis. Department approval of the methodology is not an endorsement or approval of the intended data collection program, including adequacy of the scope of the data collection program and appropriateness of sampling locations and analytical parameters. NR 131.104(4)(c)(c) In approving the proposed methodology under this subsection, the department may require the person to provide notice to the department prior to specific data collection activities to facilitate verification of data collection by department staff, as necessary. NR 131.104(5)(5) If a person obtains, collects, or generates data or information intended to be used to support a prospecting permit application without obtaining department approval of the person’s methodology under sub. (4), the department may not exclude any of the data or information that consists of general environmental information such as soil characteristics, hydrologic conditions, and air and water data contained in publications, maps, documents, studies, reports, and similar sources, whether public or private, not prepared by or for the applicant. NR 131.104(6)(6) If the period of data collection prior to the filing of a preapplication notice under s. NR 131.105 continues for longer than 12 months, the department may require the person to enter into a pre-application services agreement with the department under s. 23.40 (4), Stats., to cover costs incurred by the department in verifying or reviewing the environmental data. NR 131.104 HistoryHistory: CR 20-043: cr. Register December 2021 No. 792, eff. 1-1-22. NR 131.105NR 131.105 Preapplication notification and data collection. NR 131.105(1)(1) At least 12 months before filing an application for a prospecting permit under s. NR 131.107 a person proposing to engage in a prospecting project shall notify the department in writing of the person’s intention to apply for a prospecting permit and submit to the department a project review fee under s. NR 131.106. The person submitting the preapplication notification shall provide the department with a complete electronic version of the notice in a format prescribed by the department and shall provide duplicate paper copies of the notice in a quantity specified by the department. The notice shall include all of the following information: NR 131.105(1)(a)(a) The name, address, and telephone number of the person submitting the preapplication notification. NR 131.105(1)(b)(b) A map showing the approximate location of the prospecting site including anticipated project boundaries, locations of surface waters, roads, railroads, pipelines and utilities within the project area and identification of property ownership of lands included in the project site and adjacent areas. NR 131.105(1)(d)(d) A preliminary project description that includes all of the following: NR 131.105(1)(d)1.1. A topographic map showing the location of the prospecting operation and preliminary location of project facilities. NR 131.105(1)(d)2.2. A general description of the nonferrous metallic mineral deposit including available details on size, shape, and orientation, faulting and fracturing systems and patterns, origin, lithology, and mineralogic composition, including approximate metal grades and content. NR 131.105(1)(d)5.5. The potential locations of anticipated mining waste facilities, if any. NR 131.105(1)(d)6.a.a. A discussion of land uses at the proposed prospecting site and the surrounding area which may have an impact on the suitability of the property as a prospecting site or on groundwater quality. NR 131.105(1)(d)6.b.b. A discussion of land use zoning, with particular attention given to areas where zoning variances will be required, where agricultural impact statements may be required, or where floodplain, conservancy, shoreland or wetland zoning is designated. NR 131.105(1)(d)6.c.c. Identification of known recreational, historical, archaeological areas, areas that contain threatened or endangered species per s. 29.604, Stats., and ch. NR 27, state or local natural areas and county forest lands. NR 131.105(1)(d)6.d.d. A discussion of the regional setting of the proposed prospecting site generally documented by currently available public information addressing the topography, surface hydrology including the presence of any resources designated as areas of special natural resources interest under s. 30.01 (1am), Stats., geology, and hydrogeology of the area surrounding the potential prospecting site. NR 131.105(1)(e)(e) A proposed scope of study that includes all of the following: NR 131.105(1)(e)1.1. Identification of data requirements needed for preparation of the prospecting permit application, and, as applicable, environmental impact report, mining waste site feasibility report, and plan of operation and other applications for permits, licenses, and approvals issued by the department. NR 131.105(1)(e)2.2. Specific methodologies to be utilized in data collection, data processing and synthesis, laboratory methods, and analyses. NR 131.105(1)(e)3.3. Description of the format in which the data will be presented in the prospecting permit application and other required submittals. NR 131.105(1)(e)5.5. Names, addresses, and qualifications of persons who will be responsible for data collection, laboratory work, and impact analysis. Data shall be submitted under the seal of a licensed professional engineer, geologist or hydrologist registered with or licensed by the Wisconsin department of safety and professional services or other professional with expertise directly applicable to the data. NR 131.105(1)(e)6.6. Quality assurance programs employed in obtaining, collecting, generating, and evaluating all baseline data. NR 131.105(1)(e)7.7. Identification of any anticipated modeling studies necessary to evaluate the prospecting operation and complete environmental impact assessments. NR 131.105(2)(2) The person giving notice under sub. (1) may submit, as part of the notification, specific environmental data that were obtained, collected, or generated prior to submitting a preapplication notification under this section including data reviewed under s. NR 131.104 and data that were not reviewed under s. NR 131.104. To the extent such information is available, the person shall include substantiating background information that will assist the department in establishing the validity of the data including the following: NR 131.105(2)(a)(a) The data obtained, the method of data collection, and the analytical methods employed. NR 131.105(2)(b)(b) The identity of persons obtaining, collecting, and generating the data and their qualifications. Data shall be submitted under the seal of a licensed professional engineer, geologist or hydrologist registered with or licensed by the Wisconsin department of safety and professional services or other professional with expertise directly applicable to the data. NR 131.105(2)(c)(c) Permits, licenses, and approvals that were in effect when the data and information were obtained, collected, and generated prior to submitting the preapplication notification. NR 131.105(3)(3) Upon receipt of the preapplication notification under sub. (1), the department shall give public notice of the department’s receipt of the preapplication notification in the same manner as provided under s. 293.43 (2m) (b), Stats., and to the government of any American Indian tribe or band whose reservation boundaries are within 60 miles of any portion of the proposed project, and to the government of those American Indian tribes or bands with federally recognized treaty rights in the area of the project. The department shall make the preapplication notification available for review in the county, city, village, or town in which the prospecting site is located. The notice under this subsection shall invite interested persons to submit comments regarding information those interested persons believe should be requested from the person submitting a preapplication notification under sub. (1) and information that the interested persons believe the department should seek through independent studies. The department shall hold a public informational hearing to receive comments from interested persons and the hearing shall be completed within 45 days after public notice required under this subsection is given. NR 131.105(4)(4) The department shall receive and consider any comments from interested persons received within 45 days after public notice is given under sub. (3) as to information that the interested persons believe should be requested from the person submitting a preapplication notification under sub. (1) and the information that the interested persons believe the department should seek through independent studies. NR 131.105(5)(5) No later than 90 days after the period for receiving and considering comments from interested persons under sub. (4), the department shall inform the person giving notice under sub. (1) of the type and quantity of information that the department believes to be needed to support an application for a prospecting permit and the methodology to be used in gathering information and shall identify preliminary verification procedures to be conducted by the department under sub. (9). The department shall specifically inform the person submitting a preapplication notification under sub. (1) of the type and quantity of information on the characteristics of groundwater resources in the area in which prospecting is anticipated to occur that the department believes is needed to support an application, including the information that the department believes should be included in the applicant’s environmental impact report and the information that the department will need to prepare an environmental impact statement. The department shall also inform the person submitting a preapplication notification under sub. (1) of the application timelines and other filing requirements for all other approvals, licenses, and permits relating to the proposed prospecting project. NR 131.105(6)(6) No later than 45 days after receiving the information from the department in sub. (5), the person submitting a preapplication notification under sub. (1) shall submit to the department a final scope of study incorporating information provided by the department in sub. (5). NR 131.105(7)(7) All environmental baseline data gathered by a person submitting a preapplication notification under sub. (1) shall be submitted to the department as soon as it is in final form as described in the scope of study. The department may require the person to submit any raw field data collected either by the applicant or by a consultant. NR 131.105(8)(8) The department may at any time after consultation with the person submitting a preapplication notification under sub. (1) revise or modify its requirements regarding information that must be gathered and submitted as part of the information needed for preparation of the prospecting permit application, environmental impact report, mining waste site feasibility report, plan of operation, or other applications for permits, licenses, and approvals issued by the department. NR 131.105(9)(9) The department may conduct studies necessary to verify information that may be submitted in support of the environmental impact report, if required, prospecting permit application, or applications for other permits and approvals issued by the department. The department shall develop studies and quality assurance and verification programs in a manner consistent with future monitoring requirements.
/code/admin_code/nr/100/131
true
administrativecode
/code/admin_code/nr/100/131/103/25/b/4
Department of Natural Resources (NR)
Chs. NR 100-199; Environmental Protection – General
administrativecode/NR 131.103(25)(b)4.
administrativecode/NR 131.103(25)(b)4.
section
true