This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
NR 110.11(2)(b)3. 3. The elevation of high water at the site, including the maximum elevation of sewage in the collection system in the event of power failure at the station.
NR 110.11 History History: Cr. Register, November, 1974, No. 227, eff. 12-1-74; r. and recr. Register, December, 1978, No. 276, eff. 1-1-79; CR 12-027: am. (1) (d) 5. Register July 2013 No. 691, eff. 8-1-13; CR 13-022: am. (1) (g) Register March 2014 No. 699, eff. 4-1-14.
NR 110.12 NR 110.12Owner approval requirement. If the engineer submitting plans to the department for approval is not an employee of or has not been retained by the owner of the sewerage system for which the plans are submitted, written acceptance of the final plans by the owner shall be required prior to submission of the plans to the department.
NR 110.12 Note Note: For example, if an engineer is retained by a developer to design sewer extensions which will be connected to a municipal system and which will eventually be owned by the municipality, the plans must be accepted by the municipality before the department issues an approval.
NR 110.12 History History: Cr. Register, November, 1974, No. 227, eff. 12-1-74.
NR 110.13 NR 110.13Sewer design criteria.
NR 110.13(1)(1)General design considerations.
NR 110.13(1)(a) (a) Separation of sewers. New systems, or extensions to existing systems, which will serve presently unsewered areas shall be designed to exclude storm and other clear water sources from the sanitary sewer system.
NR 110.13(1)(b) (b) Design basis.
NR 110.13(1)(b)1.1. Sewage collection systems, exclusive of interceptors, shall be designed in accordance with s. NR 110.10 (1).
NR 110.13(1)(b)2. 2. Interceptors shall be designed in accordance with s. NR 110.10 (2) (a).
NR 110.13(1)(b)3. 3. Extensions to existing sewage collection systems may be designed assuming an average design flow rate of 378 liters (100 gallons) per capita per day.
NR 110.13(1)(c) (c) Design capacity. Sewers shall be designed to carry, when running full, the peak design flows expected from domestic, commercial, industrial and other sources, and infiltration and inflow. Peak design flow shall be established using existing sewage flow or water use records, and records of infiltration and inflow. Where peak flow records are not available, the peak design flow shall be determined by applying one of the following peak flow factors to the average design flow:
NR 110.13(1)(c)1. 1. 250% of the average design flow for interceptors, main (trunk) sewers, and sewage outfall pipes; or,
NR 110.13(1)(c)2. 2. 400% of average design flow for submain and branch sewers.
NR 110.13(1)(d) (d) Protection of water supplies.
NR 110.13(1)(d)1.1. Sanitary sewers shall be located with a minimum separation distance of 60 meters (200 feet) from any community water system well in accordance with ch. NR 811. A lesser separation distance may be allowed where the sanitary sewer main is constructed of water main materials and joints and pressure tested in accordance with ch. NR 811 requirements. When sanitary sewers are proposed to be laid within 60 meters (200 feet) of a community water system well the location of the well shall be shown on the design plans. The separation distance between a community water system well and a sanitary sewer main may not be less than 50 feet.
NR 110.13(1)(d)2. 2. Sanitary sewers shall be located with a minimum separation distance of 15 meters (50 feet) from private water system wells or any other wells subject to ch. NR 812.
NR 110.13(1)(d)3. 3. Horizontal and vertical separation of sewers from public water mains shall comply with the requirements of s. NR 811.67. Horizontal and vertical separation of sewer from private water laterals shall comply with the requirements of s. SPS 382.40 (8) (b).
NR 110.13(1)(d)4. 4. Cross-connections with public and private water supply systems are prohibited.
NR 110.13(2) (2) Design requirements.
NR 110.13(2)(a)(a) Diameter.
NR 110.13(2)(a)1.1. Conventional gravity sewer may not be less than 20 centimeters (8 inches) in diameter.
NR 110.13(2)(a)2. 2. Gravity sewers with diameters less than 20 centimeters (8 inches) which are intended to transport septic tank effluent will be evaluated on a case-by-case basis.
NR 110.13(2)(b) (b) Depth. Sewers shall be designed deep enough to prevent freezing and, where economically feasible, to provide gravity basement drainage for sanitary wastes.
NR 110.13(2)(c) (c) Slope.
NR 110.13(2)(c)1.1. Conventional gravity sewers shall be laid with uniform slope between manholes. All sewers shall be designed and constructed to give average velocities of not less than 60 centimeters per second (2.0 feet per second) when flowing full. The minimum slopes shown in Table 1 shall be provided. Slopes less than 0.4% may be permitted for 20 centimeter (8 inch) sewers. In such cases, however, the slope may not be less than 0.3%. The department will approve these sewers only when the owner demonstrates that physical circumstances warrant the lesser slope. Furthermore, approval will not be granted until the department has received written assurance from the operating authority that the authority will provide the additional maintenance which may result from the sedimentation due to decreased velocities.
Table 1 - See PDF for table PDF
NR 110.13(2)(c)2. 2. Gravity sewers with a diameter less than 20 centimeters (8 inches) shall be laid at uniform slopes between manholes and shall be designed to provide sufficient flow velocities to prevent sedimentation of septic tank solids.
NR 110.13(2)(d) (d) Alignment.
NR 110.13(2)(d)1.1. Sewers with diameters less than 91 centimeters (36 inches) shall be laid with straight alignment between manholes.
NR 110.13(2)(d)2. 2. The department may approve curvilinear sewers with diameters of 91 centimeters (36 inches) or larger on a case-by-case basis.
NR 110.13(2)(e) (e) Increasing size. When a sewer joins a larger one, the invert of the smaller sewer shall be laid at the elevation necessary to maintain the same energy gradient.
NR 110.13(2)(f) (f) Velocity. Where velocities of greater than 4.6 meters per second (15 feet per second) are attained, special provision shall be made to protect against displacement or erosion.
NR 110.13(2)(g) (g) Anchoring. Sewers on slopes of 20% or greater shall be anchored securely with concrete anchors or the equivalent, spaced as follows:
NR 110.13(2)(g)1. 1. Not over 11 meters (36 feet) center to center on grades 20% to 35%;
NR 110.13(2)(g)2. 2. Not over 7.3 meters (24 feet) center to center on grades 35% to 50%; and
NR 110.13(2)(g)3. 3. Not over 4.9 meters (16 feet) center to center on grades greater than 50%.
NR 110.13(2)(h) (h) Trench width. The width of the trench shall be sufficient to allow the pipe to be laid and jointed properly and to allow the backfill to be placed and compacted as needed. The trench sides shall be kept as nearly vertical as possible. When wider trenches are dug, appropriate bedding class and pipe strength shall be used. Ledge rock, boulders, and large stones shall be removed to provide a minimum clearance of 10 centimeters (4 inches) below and on each side of the pipe.
NR 110.13(2)(i) (i) Bedding.
NR 110.13(2)(i)1.1. Bedding classes A, B, or C, as described in ASTM C12-09 shall be used for all rigid pipe provided the proper strength pipe is used with the specified bedding to support the anticipated load.
NR 110.13(2)(i)2. 2. Bedding classes I, II, or III, as described in ASTM D2321-09 shall be used for all flexible pipe provided the proper strength pipe is used with the specified bedding to support the anticipated load.
NR 110.13(2)(j) (j) Backfill. Debris, frozen material, large clods or stones, organic matter, or other unstable materials may not be used for backfill within 60 centimeters (2 feet) of the top of the pipe. Backfill shall be placed in such a manner as not to disturb the alignment of the pipe.
NR 110.13(2)(k) (k) Construction quality testing.
NR 110.13(2)(k)1.1. Groundwater infiltration into sanitary sewer systems shall be minimized. Tests for infiltration shall be specified in the construction specifications. This may include appropriate water or low pressure air testing. The leakage outward or inward (exfiltration or infiltration) may not exceed 0.19 cubic meters per centimeter pipe diameter per kilometer per day (200 gallons per inch of pipe diameter per mile per day) for any section of the system. An exfiltration or infiltration test shall be performed with a minimum positive head of 60 centimeters (2 feet). The air test, if used, shall, at a minimum, conform to the test procedure described in ASTM C828-06 for clay pipe, ASTM C924-02 (2009) for concrete pipe, or ASTM F1417-92 (2005) for plastic pipe. The testing methods selected should take into consideration the range in groundwater elevations projected and the situation during the test.
NR 110.13(2)(k)2. 2. Deflection tests shall be performed for all polyvinyl chloride pipe installations. The deflection test shall be performed using a rigid ball or mandrel, and shall be performed without mechanical pulling devices. If deflection testing occurs within 30 days of placement of the final backfill, deflection may not exceed 5%. Maximum deflection may not exceed 7.5% when testing occurs more than 30 days after placement of the final backfill.
NR 110.13(3) (3) Manholes.
NR 110.13(3)(a)(a) Location. Manholes shall be installed at the end of each line, at all changes in grade, size or alignment, and at all pipe intersections.
NR 110.13(3)(b) (b) Manhole spacing.
NR 110.13(3)(b)1.1. Manholes shall be located at intervals not greater than 120 meters (400 feet) for sewers with diameters of 38 centimeters (15 inches), or less, and not greater than 150 meters (500 feet) for sewers with diameters of 46 centimeters (18 inches) to 76 centimeters (30 inches). Distances up to 180 meters (600 feet) may be approved in cases where the sewer system owner has cleaning equipment which can reach this length.
NR 110.13(3)(b)2. 2. Manhole spacing for sewers with a diameter greater than 76 centimeters (30 inches) shall be determined on a case-by-case basis.
NR 110.13(3)(c) (c) Drop pipe. An outside drop pipe shall be provided for a sewer entering a manhole where the invert elevation of the entering sewer is 60 centimeters (2 feet) or more above the spring line of the outgoing sewer. The entire drop connection shall be encased in the concrete. Inside drop connection may be approved on a case-by-case basis.
NR 110.13(3)(d) (d) Diameter. The minimum diameter of manholes shall be 1.1 meters (42 inches).
NR 110.13(3)(e) (e) Construction. Manholes shall be constructed of precast concrete, monolithic concrete, brick or block, or other approved materials. Fiberglass manholes may be approved on a case-by-case basis. Fiberglass manholes may be approved for use in high traffic areas provided the top section of the manhole is not made of fiberglass.
NR 110.13(3)(f) (f) Flow channel. The flow channel through manholes shall be made to conform to the shape and slope of the sewers.
NR 110.13(3)(g) (g) Water tightness. Solid watertight manhole covers shall be used wherever the manhole tops may be flooded by street runoff or high water. Where groundwater conditions are unfavorable, manholes of brick or block shall be waterproofed on the exterior with plastic coatings supplemented by a bituminous waterproof coating or other approved coatings. Inlet and outlet pipes shall be joined to the manhole with a gasketed flexible watertight connection or any watertight connection arrangement that allows differential settlement of the pipe and manhole wall to take place.
NR 110.13(3)(h) (h) Cleanouts. For sewers with diameters 20 centimeters (8 inches), or greater, cleanouts and lampholes may not be used as substitutes for manholes. The department may allow cleanout instead of manholes when the sewer diameter is less than 20 centimeters (8 inches).
NR 110.13(3)(i) (i) Manholes for sewers with diameters less than 20 centimeters (8 inches). Manholes shall be located at pipe intersections. The spacing of these manholes shall be determined on a case-by-case basis.
NR 110.13(4) (4) Inverted siphons. Inverted siphons may not have less than 2 barrels with a minimum pipe size of 15 centimeters (6 inches) and shall be provided with the necessary appurtenances for convenient flushing and maintenance. The manholes shall have adequate clearance for rodding. Sufficient head shall be provided and pipe sizes selected to secure velocities of at least 91.5 centimeters per second (3.0 feet per second) at average flows. The inlet and outlet details shall be arranged so that the normal flow is diverted to one barrel, and so that either barrel may be removed from service for cleaning.
NR 110.13(5) (5) Material specifications for sewer construction.
NR 110.13(5)(a) (a) Materials. Materials used in the construction of sanitary sewers shall be restricted to the following: concrete, vitrified clay, steel, ductile iron, polyvinyl chloride (PVC), acrylonitrile-butadiene-styrene (ABS) composite, fiberglass reinforced-PVC composite, and high density polyethylene (HDPE) pipe. Other pipe material will be considered on its merit and may be approved by the department. Where an approval is issued for a restricted or experimental use, the department may require a construction inspection report and annual reports including television inspection of the system as a condition of its approval.
NR 110.13(5)(b) (b) Quality. All material used for sanitary sewer construction shall be free from defects that impair service.
NR 110.13(5)(c) (c) Labeling. Each length of pipe and fitting used in a sanitary sewer shall be stamped or indelibly marked with the manufacturer's name or mark.
NR 110.13(5)(d) (d) Material selection. Pipe material selection shall recognize the design conditions of the sewer installation. Factors which shall be considered include depth of cover, soil types, loading on pipe, and corrosivity.
NR 110.13(5)(e) (e) Nonpressure pipe. All nonpressure sewer pipe shall have sufficient strength to withstand the loads which will exist. The following are minimum standards for nonpressure pipe:
NR 110.13(5)(e)1. 1. Concrete pipe shall meet the requirements of ASTM C14-07, C76-10, or C655-09;
NR 110.13(5)(e)2. 2. Vitrified clay pipe shall meet the requirements of ASTM C700-09;
NR 110.13(5)(e)3. 3. Steel pipe shall meet the requirements of AWWA C200-05;
NR 110.13(5)(e)4. 4. Ductile iron pipe and fittings shall meet the requirements of ASTM A746-09;
NR 110.13(5)(e)5. 5. Polyvinyl chloride sewer pipe shall meet the requirements of D3034-08 or ASTM F679-08;
NR 110.13(5)(e)6. 6. ABS composite sewer pipe shall meet the requirements of ASTM D2680-01(2009).
NR 110.13(5)(f) (f) Joints for nonpressure pipe. The method of making joints and the materials used shall be included in the specifications and meet the minimum standards in subds. 1. to 5. Sewer joints shall be designed to minimize infiltration and to prevent the entrance of roots. Joint material shall be of such a composition as not to be adversely affected by the sewage.
NR 110.13(5)(f)1. 1. Rubber gasket joints for concrete sewer pipe shall meet ASTM C443-05ae1.
NR 110.13(5)(f)2. 2. Resilient joints for vitrified clay sewer pipe shall meet ASTM C425-04 (2009).
NR 110.13(5)(f)3. 3. Steel pipe joints shall meet the requirements of AWWA C200-05.
NR 110.13(5)(f)4. 4. Polyvinyl chloride sewer pipe shall be joined by solvent weld joints or by elastomeric joints which have been approved by the department.
NR 110.13(5)(f)5. 5. ABS composite sewer pipe shall be joined by solvent weld joints or by type OR mechanical–seal joints meeting the requirements of ASTM D2680-01 (2009).
NR 110.13(5)(g) (g) Pressure sewer pipe and joints. All pressure sewer pipe 10 centimeters (4 inches) or larger shall meet the following minimum requirements:
NR 110.13(5)(g)1. 1. Ductile iron pipe and joints shall meet the requirements of AWWA C151.
NR 110.13(5)(g)2. 2. Steel pipe and joints shall meet the requirements of AWWA C200-05.
NR 110.13(5)(g)3. 3. Concrete pipe and joints shall meet the requirements of AWWA C300-04.
NR 110.13(5)(g)4. 4. Polyvinyl chloride pipe and joints shall meet the requirements of AWWA C900-07 (minimum class 150) or ASTM D2241-09 (minimum class 250). Solvent weld joints may not be used.
NR 110.13(5)(g)5. 5. Fiberglass reinforced–polyvinyl chloride composite pipe and joints shall meet the requirements of AWWA C950-07 (minimum class 250). Eight and 10–inch pipe shall have minimum category 3 stiffness as defined in ASTM D2996-01 (2007) e1. Four and 6–inch pipe shall have a minimum category 2 stiffness as defined in ASTM D2996-01 (2007).
NR 110.13(5)(h) (h) Small diameter pressure sewer pipe and joints. All pipe and joints 8 centimeters (3 inches) in diameter or smaller to be used in grinder pumps shall meet the following minimum requirements:
NR 110.13(5)(h)1. 1. Polyethylene pipe and joints which meet the requirements of ASTM D2239-03 (minimum class 160) may be approved on a case–by–case basis depending on the expected system pressure relative to the pipe working strength. Solvent weld, butt fusion, or elastomeric joints will be acceptable.
NR 110.13(5)(h)2. 2. For ABS pipe, solvent weld or elastomeric joints will be acceptable.
NR 110.13(5)(h)3. 3. Polyvinyl chloride pipe and joints shall meet the requirements of ASTM D2241-09 (minimum class 160). Solvent weld or elastomeric joints will be acceptable.
NR 110.13(6) (6) Sanitary sewer overflow structures. Sanitary sewer overflows structures may be provided as measures to manage and mitigate the effects of sanitary sewer overflow discharges that may occur under extreme conditions. Sanitary sewer overflow structures shall be designed in accordance with all the following requirements:
NR 110.13(6)(a) (a) The overflow may be activated either manually or automatically. If automatically activated, a monitoring system shall be provided to detect the initiation time of the overflow and to provide an alarm signal to the sewage collection system operator or other responsible authority.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.