Chapter NR 108
REQUIREMENTS FOR PLANS AND SPECIFICATIONS SUBMITTAL FOR REVIEWABLE PROJECTS AND OPERATIONS OF COMMUNITY WATER SYSTEMS, SEWERAGE SYSTEMS AND INDUSTRIAL WASTEWATER FACILITIES
NR 108.03 Construction of reviewable projects. NR 108.04 Plans for reviewable projects. NR 108.05 Design requirements. NR 108.06 Plant operation. Ch. NR 108 HistoryHistory: Chapter NR 108 as it existed on November 30, 1974 was repealed and a new Chapter NR 108 was created effective December 1, 1974.
NR 108.01NR 108.01 Applicability. The rules herein presented govern the submission of plans and specifications for any reviewable project and the general operation and control of community water systems, sewerage systems and industrial wastewater facilities. NR 108.01 HistoryHistory: Cr. Register, November, 1974, No. 227, eff. 12-1-74; am. Register, March, 1978, No. 267, eff. 4-1-78. NR 108.02(1)(1) “Approval” means the written approval of the department for any project requiring approval pursuant to s. 281.41, Stats., and s. NR 108.03. NR 108.02(2)(2) “Community water system” means a public water system which serves at least 15 service connections used by year-round residents or regularly serves at least 25 year-round residents. NR 108.02(2m)(2m) “Construction” means any placement, assembly or installation of facilities or equipment at the premises where such equipment will be used. NR 108.02(3)(3) “Compliance determination systems” means devices, such as flow meters and mechanical sampling equipment, used to determine whether a discharge is complying with permit conditions. NR 108.02(4)(4) “Department” means the department of natural resources. NR 108.02(5)(5) “Groundwater monitoring system” means wells, piezometers or other equipment used to determine groundwater quality or elevation. NR 108.02(6)(6) “Industrial pretreatment facility” means a facility which reduces or removes pollutants from industrial wastes prior to discharge to a publicly owned sewerage system. NR 108.02(7)(7) “Industrial wastewater facility” means a facility which reduces or removes pollutants from industrial wastes prior to discharge to waters of the state, other than through publicly owned treatment works. NR 108.02(9)(9) “Municipal water system” means a community water system owned by a county, city, village, town, town sanitary district, utility district, public institution as defined in s. 49.10 (12) (f) 1., Stats., or a privately owned water utility serving any of the above. NR 108.02(10)(10) “Non-community water system” means a public water system that is not a community water system. A non-community water system typically serves a transient population rather than permanent year-round residents. NR 108.02(11)(11) “Permit” means a Wisconsin pollution discharge elimination system permit for the discharge of pollutants issued by the department under ch. 283, Stats. NR 108.02(12)(12) “Public water system” means a system providing piped water to the public for human consumption, if the system has at least 15 service connections or regularly serves an average of at least 25 individuals daily at least 60 days out of the year. A public water system is either a “community water system” or a “non-community water system”. A public water system includes: NR 108.02(12)(a)(a) Any collection, treatment, storage, and distribution facilities under control of the operator of the public water system and used primarily in connection with the public water system, and NR 108.02(12)(b)(b) Any collection or pretreatment storage facilities not under control of the operator of the public water system which are used primarily in connection with the public water system. NR 108.02(13)(13) “Reviewable project” means any construction or installation project for which department approval is required, pursuant to s. 281.41, Stats. The following projects are reviewable within the meaning of this chapter: NR 108.02(13)(a)(a) Any new community water system or any water system intended to serve 7 or more homes, 10 or more apartments, 10 or more mobile homes or 10 or more condominium units. NR 108.02(13)(b)(b) Any improvements, extensions or alterations which may affect the quality or quantity of water delivered by an existing community water system or delivered by a water system serving 7 or more homes, 10 or more apartments, 10 or more mobile homes or 10 or more condominiums units except distribution systems not in streets or easements, or water systems where all of the living units are owned by a single owner and the owner provides information indicating that less than 25 year-round residents will be served. NR 108.02(13)(d)(d) Any improvements, extensions or alterations of existing sewerage systems which may affect the quality or quantity of effluent or the location of any outfall; NR 108.02(13)(e)(e) Any new industrial wastewater facility or any modification or alteration of an existing industrial wastewater facility, including compliance determination systems. NR 108.02(13)(f)(f) Any new industrial pretreatment facility or any modification or alteration of an existing industrial pretreatment facility which may affect the quality or quantity of the discharge to a sewerage system. NR 108.02(13)(g)(g) Any groundwater monitoring system associated with a wastewater treatment facility. NR 108.02(14)(14) “Sewerage system” means all structures, including sewage treatment facilities, conduits and pipelines, by which sewage is collected and disposed of. NR 108.02(15)(15) “Waterworks” or “water system” means any facility installed or constructed to obtain, treat, store or convey the water for drinking or domestic uses for a public water system. NR 108.02 NoteNote: Plan review of water distribution systems for community water systems intended to serve less than 15 living units or not in streets or easements is required by ch. SPS 382, Wis. Adm. Code. NR 108.02 HistoryHistory: Cr. Register, November, 1974, No. 227, eff. 12-1-74; am. Register, March, 1978, No. 267, eff. 4-1-78; renum. (3) to (6), (8) to (10) to be (4), (7) to (9) and (13) to (15) and am. (13) (e), cr. (2m), (3), (5), (6), (10) to (12) and (13) (f) and (g), r. (7), Register, January, 1987, No. 373, eff. 2-1-87; am. (13) (a) and (b), Register, December, 2000, No. 540, eff. 1-1-01; corrections in (1), (11) and (13) made under s. 13.93 (2m) (b) 7., Stats., Register, December, 2000, No. 540. NR 108.03NR 108.03 Construction of reviewable projects. NR 108.03(1)(1) No person may commence, or cause to be commenced, construction of any reviewable project until final plans and specifications for such project have been reviewed and approved by the department or until at least 90 days has elapsed since the submission of final plans and specifications to the department, and the department has not rejected the final plans and specifications. The 90-day time period may be extended as provided in s. 281.41, Stats. NR 108.03 NoteNote: The 90-day review period is approximately 65 business days.
NR 108.03(2)(2) Site preparation work for industrial wastewater facilities and industrial pretreatment facilities may commence prior to the date of approval of plans and specifications. Site preparation work is limited to clearing, grubbing, and rough grading. NR 108.03(3)(3) The reviewable project shall be constructed in accordance with the approved plans and specifications and approval conditions or subsequent approved modifications. NR 108.03(4)(4) The department shall be notified when construction has commenced and again when the facilities are placed in operation. NR 108.03(5)(5) All existing treatment facilities shall be operated as effectively as possible during the course of the construction period. NR 108.03(6)(6) A resident inspector shall be provided by the treatment system owner or its consultant during the course of construction. NR 108.03 HistoryHistory: Cr. Register, November, 1974, No. 227, eff. 12-1-74; am. Register, March, 1978, No. 267, eff. 4-1-78; renum. to be (1), cr. (2) to (6), Register, January, 1987, No. 373, eff. 2-1-87; correction in (1) made under s. 13.93 (2m) (b) 7., Stats., Register, December, 2000, No. 540. NR 108.04NR 108.04 Plans for reviewable projects. NR 108.04(1)(1) Preliminary plans. Prior to preparation of final plans and specifications for a water supply facility, an industrial wastewater facility or industrial pretreatment facility, a conceptual design report of the proposed system may be submitted. Upon request the department will provide written comments on the acceptability of the concept and advice regarding design requirements. NR 108.04(2)(2) Submission of final plans and specifications. NR 108.04(2)(a)(a) All final plans and specifications submitted to the department pursuant to s. 281.41, Stats., and s. NR 108.03, shall be accompanied by a request for approval and by information pertinent to the design of the system, including general plans, construction details, specifications and an engineering report. The facility owner, on whose behalf the submittal was made, shall be notified by the department of any submittal deficiencies. Plans submitted without necessary design data may be rejected by the department. The plans and specifications and pertinent information shall be submitted at least 90 days prior to the date upon which the construction of the reviewable project is planned to commence, except in emergency situations when it is desired to commence construction in less than 90 days, in which case the plans and specifications shall be submitted as many days as possible prior to the desired construction date. NR 108.04 NoteNote: The necessary accompanying design data for sewerage systems and waterworks can be found in Chs. NR 110 and 811, respectively. NR 108.04(2)(b)(b) Three sets of final plans and specifications shall be submitted for all reviewable projects except water main and sanitary sewer extensions in which case only 2 sets need to be submitted. One of the plan sets shall be submitted electronically and the remainder as paper unless the department determines an alternate submittal is acceptable for its review and records retention purposes. Additional sets of plans and specifications may be required for sewerage improvements that are eligible for state or federal grants–in–aid. NR 108.04 NoteNote: Section 59.74 (2), Stats., requires that the county surveyor be notified if it is necessary to obliterate any landmark, monument, or corner post during construction. It is recommended that a copy of the construction plans be submitted to the county surveyor for review. NR 108.04(2)(c)(c) The final plans and specifications shall be submitted under the signature and the seal of a professional engineer registered in Wisconsin.
/code/admin_code/nr/100/108
true
administrativecode
/code/admin_code/nr/100/108
Department of Natural Resources (NR)
Chs. NR 100-199; Environmental Protection – General
administrativecode/ch. NR 108
administrativecode/ch. NR 108
section
true