NR 106.99(2)(f)
(f)
Other activities. The plan may include activities that the department, in consultation with the permittee, determines to be appropriate for the individual permittee's circumstances.
NR 106.99(3)
(3)
Primary and secondary industry plans. In addition to the provisions under s.
NR 106.99 (1), for primary and secondary industries, a PFOS and PFOA minimization plan shall consist of an evaluation of all of the following elements:
NR 106.99(3)(c)
(c) Substitution of raw materials or chemical additives with low or zero PFOS, PFOA, and PFOS and PFOA precursor alternatives.
NR 106.99(3)(f)
(f) Other activities that the department, in consultation with the permittee, determines to be appropriate for the individual permittee's circumstances.
NR 106.99(4)
(4)
Reviewing and approving a PFOS and PFOA minimization plan. In reviewing the appropriate elements for a PFOS and PFOA minimization plan for municipal dischargers or primary and secondary industrial dischargers, the department shall consider all of the following:
NR 106.99(4)(c)
(c) The concentrations of PFOS and PFOA in the effluent, influent, and biosolids or sludge, if applicable and available.
NR 106.99(4)(d)
(d) The costs of potential PFOS and PFOA minimization plan elements.
NR 106.99(4)(e)
(e) The environmental costs and benefits of the PFOS and PFOA minimization plan elements.
NR 106.99(4)(f)
(f) The characteristics of the community in which the discharger is located, if applicable.
NR 106.99(4)(g)
(g) The opportunities for material or product substitution.
NR 106.99(4)(h)
(h) The opportunities available for support from or cooperation with other organizations.
NR 106.99(4)(i)
(i) The actions the discharger has taken in the past to reduce PFOS or PFOA use or discharges.
NR 106.99(5)
(5)
Revisions to plans. Any revision to previously approved plans requires department approval.
NR 106.99 History
History: CR 21-083: cr. Register July 2022 No. 799, eff. 8-1-22. NR 106.995
NR 106.995 Sampling and laboratory analysis requirements. NR 106.995(1)(1)
The permittee shall collect samples in accordance with the requirements in the permit. The department may require either grab or composite samples as a permit condition. If the permittee uses a composite sampler, an equipment blank is required.
NR 106.995 Note
Note: If the permittee uses a composite sampler, it is recommended the permittee contact their department compliance representative prior to sample collection for additional sampling information.
NR 106.995(2)
(2) The laboratory performing the analyses on any samples shall be certified for the applicable PFAS compounds in the aqueous matrix by the Wisconsin Laboratory Certification Program established under s.
299.11, Stats., in accordance with s.
NR 149.41.
NR 106.995 Note
Note: If the EPA Office of Water publishes a 1600 series isotope dilution method for the analysis of PFAS in wastewater, the department recommends use of the EPA method.
NR 106.995(3)
(3) The department may reject any sample results if results are produced by a laboratory that is not in compliance with certification requirements under ch.
NR 149.
NR 106.995 History
History: CR 21-083: cr. Register July 2022 No. 799, eff. 8-1-22. NR 106.996
NR 106.996 New dischargers or new sources. If the department determines that a new source or new discharger may have the reasonable potential to cause or contribute to an exceedance of the PFOS or PFOA standard under s.
NR 102.04 (8) (d) 1., the permittee shall install pollution control measures to achieve the standard prior to discharge, and water quality-based effluent limitations for PFOS or PFOA or both that are calculated using the procedure in ss.
NR 106.07 (2) and
106.98 (4) and ch.
NR 207 shall be included in the permit.
NR 106.996 History
History: CR 21-083: cr. Register July 2022 No. 799, eff. 8-1-22; correction made under s. 35.17, Stats., Register July 2022 No. 799.