NR 7.045(1)(b)(b) Copy of the lake association by-laws or articles of incorporation. NR 7.045(1)(c)(c) A resolution adopted by the governing body of the lake association: NR 7.045(1)(c)1.1. Authorizing a representative to apply for grants on their behalf, sign documents and take necessary action to undertake, direct and complete the approved project. NR 7.045(1)(c)2.2. Verifying that the association has sufficient funds to complete the project. NR 7.045(1)(d)(d) A general description of the association including the number of members, frequency of meetings, membership qualifications and fees, age of association, purpose of the association, and a list of projects completed by the association in the last 3 years, if any. NR 7.045 HistoryHistory: Cr. Register, January, 1993, No. 445, eff. 2-1-93. NR 7.05NR 7.05 Eligible projects. Projects eligible for funding under this section consist of: NR 7.05(1)(1) Facilities such as ramps and boarding docks required to gain access to the water. NR 7.05(2)(2) Structures such as bulkheads and breakwaters necessary to provide safe water conditions for boaters. NR 7.05(3)(3) Activities such as dredging of launch basins and harbors of refuge to provide safe water depths for recreational boating. Dredging of launch basins or harbors of refuge is an eligible project only when it is associated with project development at the project site. Maintenance dredging of launch basins and harbors of refuge is not an eligible item for funding. NR 7.05(4)(4) Support facilities including parking lots, signs, sanitary facilities, fencing or security lighting for the convenience of boaters. NR 7.05(5)(5) Improvement and repair of locks and facilities which provide access between waterways for operators of recreational watercraft. NR 7.05(6)(6) Acquisition of aids to navigation and regulatory markers including ground tackle. Only the costs of the aids to navigation and regulatory markers including shipping and ground tackle are eligible for funds under this chapter. The cost of repairing, placing, moving or removing aids to navigation or regulatory markers is not eligible for funds under this chapter. NR 7.05(7)(7) Acquisition of capital equipment that is necessary to cut and remove aquatic plants that are aquatic nuisances or that are detrimental to fish habitat with the following limitations: NR 7.05(7)(a)(a) Eligible capital equipment shall be limited to cutting devices, barges with propelling motors, conveyors and trailering devices. NR 7.05(7)(b)(b) Acquisition of capital equipment is eligible only when the acquisition is pursuant to a plan to cut and remove aquatic plants that is approved by the department. If the capital equipment is to be used on more than one lake, each lake shall be covered by a department approved plan to cut and remove aquatic plants and each plan shall outline the organizational relationships, rights and responsibilities for weed harvesting operations between the cooperating sponsors. NR 7.05(7)(c)(c) For a single waterbody for which the equipment is being purchased the waterbody shall have a minimum acreage of harvestable aquatic plants of at least 30 acres. For several small waterbodies for which the equipment is being purchased, the cumulative acreage shall be at least 50 but no more than 100 acres of harvestable aquatic plants for all lakes combined and the waterbodies shall be in close proximity to each other as approved by the commission. NR 7.05(7)(d)(d) All sponsors for small lakes cooperating in the purchase of weed harvesting equipment shall demonstrate financial participation in the purchase of the equipment. NR 7.05(7)(e)(e) If a sponsor purchases new equipment, the department may not provide funds for the purchase of individual pieces of weed harvesting equipment more than once every 10 years. If a sponsor purchases used equipment, the 10-year limitation may be shortened to match the remaining years of utility of the equipment. If a sponsor sells any or all of the equipment funded under this chapter prior to the end of the 10 year or adjusted period, the sponsor shall repay the department 50% of the sale price. NR 7.05(8)(8) Rehabilitation of capital improvements that are related to recreational boating facilities with the following limitations: NR 7.05(8)(a)(a) The repair or renovation is the result of damage from natural events or faulty design but is not a result of inadequate maintenance or lack of care. NR 7.05(8)(b)(b) The total estimated cost of the rehabilitation is greater than $10,000. NR 7.05(8)(c)(c) The total amount of costs eligible for cost sharing assistance that a sponsor receives for rehabilitation shall be reduced or refunded by any amount of damages recovered by the sponsor through either litigation or insurance settlement. NR 7.05(9)(a)(a) In addition to projects specified under subs. (1) to (8), dredging of a channel of an inland waterway to the degree necessary to accommodate recreational watercraft is eligible for funding with the following limitations: NR 7.05(9)(a)1.1. In order to be eligible for funds, a channel to be dredged in a lake shall be defined by aids to navigation as defined in s. 30.74 (2) (b), Stats. NR 7.05(9)(a)2.2. Cost sharing for dredging of a channel may be provided only for dredging the width of a channel to a distance of 25 feet on either side of the centerline of a river or 25 feet on either side of a center channel marker in a lake. The dredging of backslopes necessary to maintain a channel width of 50 feet for a minimum of 10 years is eligible. The depth of the channel dredging shall be limited to the depth necessary to accommodate recreational watercraft commonly utilizing the waterbody. NR 7.05 NoteNote: The limit on the design slope ratio of the backslope dredging shall be commensurate with the nature of the lakebed materials.
NR 7.05(9)(a)3.3. Eligible costs of dredging a channel in a waterway include: engineering, including soil borings; dredging and mobilization; construction of a temporary holding area; and transportation of spoils. The cost of constructing revetments to permanently contain spoils is eligible if the sponsor can demonstrate that the cost of creating a land mass is less than the cost of transportation of spoils to a disposal site or if a substantial benefit to the recreational boating public will accrue. NR 7.05(9)(a)4.4. Ineligible costs include: any costs relating to planning, engineering, dredging, handling, processing, transporting or depositing of contaminated dredge spoils; the purchase of land rights for a spoils deposition area or the costs of landfill storage of spoils; costs of land treatment to cover up spoils deposit; and the cost of testing or monitoring as a condition of a state or federal permit. NR 7.05(9)(a)5.5. A sponsor may not receive funds for dredging the same channel of a waterway more than once every 10 years. NR 7.05(9)(b)(b) For the purpose of s. 30.92 (4) (b) 2., Stats., the dredging of a channel of a waterway to the degree necessary to accommodate recreational watercraft pursuant to s. 30.92 (4) (b) 8. a., Stats., shall be considered a construction project. NR 7.05(10)(10) Use of chemicals to remove Eurasian water milfoil as follows: NR 7.05(10)(a)(a) Eligible costs are the cost of chemicals, chemical application and necessary permits. NR 7.05(10)(b)(b) Ineligible costs are costs of pre- and post-treatment monitoring, information and education materials, preparation of aquatic plant management plans, spraying equipment or protective equipment. NR 7.05(11)(11) Acquisition of capital equipment that is necessary to collect and remove floating trash and debris from a waterway. Eligible costs are the costs of the following capital equipment: collecting devices, barges with propelling motors, conveyors and trailering devices. NR 7.05 HistoryHistory: Cr. Register, April 1979, No. 280, eff. 5-1-79; cr. (4) and (5), Register, December, 1986, No. 372, eff. 1-1-87; am. (1) to (4), cr. (6) and (7), Register, January, 1993, No. 445, eff. 2-1-93; am. (4) to (6), r. and recr. (7), cr. (8) and (9), Register, March, 1997, No. 495, eff. 4-1-97; CR 00-112: cr. (10) and (11), Register November 2001 No. 551, eff. 12-1-01. NR 7.06NR 7.06 Type and content of studies. NR 7.06(1)(1) Feasibility studies shall be the basis for determining the feasibility of a safe recreational boating facility project. NR 7.06(2)(2) All feasibility studies shall be site specific and completed in sufficient detail with appropriate maps, plans and text to allow the commission to determine the feasibility of the project. Where the commission finds a project is feasible and the project is supported by resolution of the affected governmental unit or qualified lake association, it shall be placed on the project priority list using the factors in s. 30.92 (3) (b), Stats. NR 7.06(3)(3) Detailed feasibility reports and environmental impact statements prepared by the U.S. army corps of engineers for small craft harbor projects are sufficient for the purpose of this section, provided that such reports or statements have been found to be acceptable to the department. NR 7.06(4)(4) Feasibility studies shall contain at a minimum the following items: NR 7.06(4)(a)3.3. Work to be done accompanied by a detailed estimate of the cost of the project including the local share, the requested amount of state funding and the extent of all other sources of funds. NR 7.06(4)(a)6.6. Distance of nearest comparable safe recreational boating facility on the same body of water, where applicable. NR 7.06(4)(b)(b) Economic analysis. The purpose of this analysis is to describe the anticipated level of use of the facility or project and associated benefits derived from such use for consideration by the commission when it evaluates the merits of various projects and establishes priorities for financial assistance. At a minimum for the development of safe recreational boating facilities, the analysis shall address: NR 7.06(4)(b)1.1. An assessment of the demand for the project including an estimate of the number of users on an annual and peak period basis. NR 7.06(4)(b)2.2. An estimate of annual revenues to be derived from any launch fees or associated costs. NR 7.06(4)(b)3.3. An estimate of the current number of users of other comparable safe recreational boating facilities within the general area of the proposed project. NR 7.06(4)(b)4.4. Past operation and maintenance costs where the project involves the improvement of an existing facility. NR 7.06(4)(b)5.5. Estimated annual operation and maintenance costs for a new project. NR 7.06(4)(c)(c) Environmental analysis. An environmental analysis shall be prepared for each safe recreational boating facility project. Because each proposed safe recreational boating facility site has certain unique physical characteristics, site specific environmental information must be collected. The scope and detail of this information shall be determined on a site-by-site basis after consultation with the department. This is intended to avoid any later problems regarding the environmental acceptability of the site. NR 7.06(4)(d)(d) Engineering analysis. The engineering analysis shall include general plans and specifications of all physical improvements including, but not limited to, dredging, construction of ramps, piers and breakwaters and land alterations. The commission may require that the engineering analysis be certified by a registered professional engineer. NR 7.06 HistoryHistory: Cr. Register, April 1979, No. 280, eff. 5-1-79; am. (1), (2), (4) (a) 2.e., Register, December, 1986, No. 372, eff. 1-1-87; am. (1), (2) and (4) (b) (intro.), r. and recr. (4) (a), Register, January, 1993, No. 445, eff. 2-1-93; am. (1), Register, March, 1997, No. 495, eff. 4-1-97. NR 7.07NR 7.07 Applications for funding for feasibility studies. NR 7.07(1)(1) Applications from governmental units or qualified lake associations for funding of feasibility studies are to be made to the department for presentation to the commission. NR 7.07(2)(2) The application shall be made on forms provided by the department and at a minimum contain the following: NR 7.07 NoteNote: Application forms are available at any department regional office.
NR 7.07(2)(a)(a) A resolution officially adopted by the governmental unit or qualified lake association authorizing a representative to act as agent for the governmental unit or lake association for the signing of forms or claims and verifying that sufficient funds are available to complete the project. NR 7.07(2)(b)(b) A detailed estimate of the cost of the feasibility study. NR 7.07(3)(3) After the review of an application, the department may request the applicant to submit more detailed information. The applicant may appeal any such request by written notice to the commission at least 10 days prior to the convening of the next regular commission meeting. The written notice to the commission shall specify the basis for the applicant’s objection to the department’s request for more detailed information. NR 7.07(4)(4) The department will fund a portion of those studies approved by the commission at a rate determined by the commission which is based upon the factors contained in s. 30.92 (2) (d), Stats., and the principles expressed in s. NR 7.09 (1), and may vary from project to project. NR 7.07 HistoryHistory: Cr. Register, April 1979, No. 280, eff. 5-1-79; am. (1), (2) (a) (intro.) and 2., Register, December, 1986, No. 372, eff. 1-1-87; am. (1) and (2) (intro.), r. and recr. (2) (a), Register, January, 1993, No. 445, eff. 2-1-93. NR 7.08NR 7.08 Application for funding to develop a safe recreational boating facility. NR 7.08(1)(1) Applications from governmental units or qualified lake associations for funding of safe recreational boating facility development projects are to be made to the department for presentation to the commission. NR 7.08(2)(2) The application shall be made on forms provided by the department and at a minimum contain the following information: NR 7.08 NoteNote: Application forms are available at any department regional office.
NR 7.08(2)(a)(a) A resolution officially adopted by the governmental unit or qualified lake association containing a formal request for assistance, authorizing a representative to act as agent for the governmental unit or lake association to sign forms or claims and verifying that sufficient funds are available to complete the project. NR 7.08(2)(b)(b) A statement, supported by appropriate documents, that the project is feasible from economic, environmental and engineering viewpoint. NR 7.08(2)(c)(c) A detailed estimate of the cost of the project indicating the local share, the requested amount of state funding, and the extent of all other sources of funds. NR 7.08(3)(3) After review of an application, the department may request the applicant to submit more detailed information. An applicant may appeal any such request by written notice to the commission at least 10 days prior to the convening of the next regular commission meeting. The written notice to the commission shall specify the basis for the applicant’s objection to the department’s request for more detailed information. NR 7.08(4)(4) The department shall fund at a rate determined by the commission, a portion of each project subject to the limitations of s. 30.92 (4), Stats. NR 7.08(5)(5) The department may pay, with the approval of the commission, an additional 10% of eligible costs for a construction project under s. 30.92 (4) (b) 2., Stats., if: NR 7.08(5)(a)(a) The sponsor requests the additional 10% cost sharing, and NR 7.08(5)(b)1.1. The sponsor is a municipality and it conducts a boating safety enforcement and education program approved by the department; or NR 7.08(5)(b)2.2. The sponsor provides financial support by written agreement to a municipality which conducts a boating safety and education program approved by the department on the waters in the immediate area of the proposed project. NR 7.08(6)(6) The actual rates of funding in subs. (4) and (5) may vary from project to project and will be based upon consideration of the factors contained in s. 30.92 (3) (b), Stats., and the principles expressed in s. NR 7.09 (1). NR 7.08 HistoryHistory: Cr. Register, April 1979, No. 280, eff. 5-1-79; am. (1), (2) (a) (intro.) and 2., Register, December, 1986, No. 372, eff. 1-1-87; am. (1) and (2) (intro.), r. and recr. (2) (a) and (5), Register, January, 1993, No. 445, eff. 2-1-93. NR 7.083NR 7.083 Application for the dredging of a channel of a waterway. NR 7.083(1)(1) Applications from governmental units and qualified lake associations for funds for dredging of a channel of a waterway on inland waters shall be made to the department for presentation to the commission. NR 7.083(2)(2) The application shall be made on forms provided by the department and at a minimum contain the following information: NR 7.083 NoteNote: Application forms are available at any department regional office.
NR 7.083(2)(a)(a) A resolution officially adopted by the governmental unit or qualified lake association authorizing a representative to act as agent for the governmental unit or lake association for the signing of forms or claims and verifying that sufficient funds are available to complete the project. NR 7.083(2)(b)(b) A statement supported by appropriate documents that the project is feasible from an economic, environmental and engineering viewpoint.
/code/admin_code/nr/001/7
true
administrativecode
/code/admin_code/nr/001/7/05/9/a/4
Department of Natural Resources (NR)
Chs. NR 1-99; Fish, Game and Enforcement, Forestry and Recreation
administrativecode/NR 7.05(9)(a)4.
administrativecode/NR 7.05(9)(a)4.
section
true